Permit #2025090918
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7035-00030-0040 |
| Block: 00030 |
| Subdivision: 7035 - |
| Job Phone: 386-503-6922 |
| Location Address: 18 BURNING TREE PL |
| Type: PO - POOL |
| Issue Date: 09/23/2025 |
| NOC: RECORDED |
| Applicant name: JOSE E ORTIZ JR |
| Owner: MCGRAW SHAUN CALVIN |
|
Address 18 BURNING TREE PLACE PALM COAST, FL 32137 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤75,500.00 |
| Job Description: REF 2024100398 POOL INSTALL |
| Type: CN |
| Original Permit #: 2024100398 |
Contractor
JOSE E ORTIZ JR LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4601 E MOODY BLVD A3 PALM COAST, FL 32164 |
CPC1460694 (Exp: 08/31/2026) | 386-313-6055 |
Sub Contractors
CHRISTOPHER I HALL
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 2413 Bunnell, FL 32110 |
EC13002161 (Exp: 08/31/2028) | (386) 437-2966 | 386-437-5042 |
CHRISTOPHER I HALL
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 2413 Bunnell, FL 32110 |
EC13002161 (Exp: 08/31/2028) | (386) 437-2966 | 386-437-5042 |
Inspection History
| Type | Request Date | Result | Inspector |
| POOL FINAL | 03/09/2026 | FINAL APPROVED | JSTEWART |
| U -UTILITY RESIDENTIAL FINAL | 03/06/2026 | FINAL APPROVED | BWRIGHT |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/05/2026 | APPROVED - AS NOTED | TPOLACEK |
| Note: MOST RECENT SURVEY INDIATES AND MATCHES DRAINAGE, AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 2/25/2026 - PREVIOUS INSPECTION NOTES 02-25-26 TPOLACEK*** BUILDER WILL NEED TO HAVE NEW SURVEY SHOT THAT CAPTURES ALL DRAINAGE PATTERNS HIGHS AND LOWS INDICATING DRAINAGE WILL WORK PER COPC REQUIRMENTS. INSOPECTOR WALKED SITE AND SITE CONDITIONS LOOK OK HOWEVER, THE FINAL SURVEY MUST SHOW DRAINAGE. 1/16/2026 - PREVIOUS INSPECTION NOTES **01/16/26 AS NOTED IN PREVIOUS FINAL SURVEY CONDITIONS FOR DRAINAGE STILL REQUIRE TO BE CORRECTED ** YOUR FINAL SURVEY SHOWS THAT YOU DRAINAGE WILL NEGATIVELY IMPACT THE ADJACENT PROPERTY TO THE REAR AND ALONG THE LEFT AND RIGHT SIDE PROPERTY LINES ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** LEFT SIDE FLOW IS INCONSISTANT YOU NEED TO SHOW POSITIVE FALL FROM THE REAR TO THE FRONT ** RIGHT SIDE IS ALSO SHOWING INCONSISTANT FALL TO THE FRONT ** 4) Positive fall is considered to be 0.10 of a foot every 20 feet. Section 300.01 D(4) V-17 ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" _________________________________________________________________________________________________________________________ 8/27/2025 - PREVIOUS INSPECTION NOTES ** 08/27/25 YOUR FINAL SURVEY SHOWS THAT YOU DRAINAGE WILL NEGATIVELY IMPACT THE ADJACENT PROPERTY TO THE REAR AND ALONG THE LEFT AND RIGHT SIDE PROPERTY LINES ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** LEFT SIDE FLOW IS INCONSISTANT YOU NEED TO SHOW POSITIVE FALL FROM THE REAR TO THE FRONT ** RIGHT SIDE IS ALSO SHOWING INCONSISTANT FALL TO THE FRONT ** 4) Positive fall is considered to be 0.10 of a foot every 20 feet. Section 300.01 D(4) V-17 ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" | |||
| ROW - FINAL INSPECTION | 03/05/2026 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9463 MOST RECENT SURVEY INDIATES AND MATCHES DRAINAGE, AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 2/25/2026 - PREVIOUS INSPECTION NOTES 02-25-26 TPOLACEK*** BUILDER WILL NEED TO HAVE NEW SURVEY SHOT THAT CAPTURES ALL DRAINAGE PATTERNS HIGHS AND LOWS INDICATING DRAINAGE WILL WORK PER COPC REQUIRMENTS. INSOPECTOR WALKED SITE AND SITE CONDITIONS LOOK OK HOWEVER, THE FINAL SURVEY MUST SHOW DRAINAGE. 1/16/2026 - PREVIOUS INSPECTION NOTES **01/16/26 AS NOTED IN PREVIOUS FINAL SURVEY CONDITIONS FOR DRAINAGE STILL REQUIRE TO BE CORRECTED ** YOUR FINAL SURVEY SHOWS THAT YOU DRAINAGE WILL NEGATIVELY IMPACT THE ADJACENT PROPERTY TO THE REAR AND ALONG THE LEFT AND RIGHT SIDE PROPERTY LINES ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** LEFT SIDE FLOW IS INCONSISTANT YOU NEED TO SHOW POSITIVE FALL FROM THE REAR TO THE FRONT ** RIGHT SIDE IS ALSO SHOWING INCONSISTANT FALL TO THE FRONT ** 4) Positive fall is considered to be 0.10 of a foot every 20 feet. Section 300.01 D(4) V-17 ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" _________________________________________________________________________________________________________________________ 8/27/2025 - PREVIOUS INSPECTION NOTES ** 08/27/25 YOUR FINAL SURVEY SHOWS THAT YOU DRAINAGE WILL NEGATIVELY IMPACT THE ADJACENT PROPERTY TO THE REAR AND ALONG THE LEFT AND RIGHT SIDE PROPERTY LINES ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** LEFT SIDE FLOW IS INCONSISTANT YOU NEED TO SHOW POSITIVE FALL FROM THE REAR TO THE FRONT ** RIGHT SIDE IS ALSO SHOWING INCONSISTANT FALL TO THE FRONT ** 4) Positive fall is considered to be 0.10 of a foot every 20 feet. Section 300.01 D(4) V-17 ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/25/2026 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 02-25-26 TPOLACEK*** BUILDER WILL NEED TO HAVE NEW SURVEY SHOT THAT CAPTURES ALL DRAINAGE PATTERNS HIGHS AND LOWS INDICATING DRAINAGE WILL WORK PER COPC REQUIRMENTS. INSOPECTOR WALKED SITE AND SITE CONDITIONS LOOK OK HOWEVER, THE FINAL SURVEY MUST SHOW DRAINAGE. 1/16/2026 - PREVIOUS INSPECTION NOTES **01/16/26 AS NOTED IN PREVIOUS FINAL SURVEY CONDITIONS FOR DRAINAGE STILL REQUIRE TO BE CORRECTED ** YOUR FINAL SURVEY SHOWS THAT YOU DRAINAGE WILL NEGATIVELY IMPACT THE ADJACENT PROPERTY TO THE REAR AND ALONG THE LEFT AND RIGHT SIDE PROPERTY LINES ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** LEFT SIDE FLOW IS INCONSISTANT YOU NEED TO SHOW POSITIVE FALL FROM THE REAR TO THE FRONT ** RIGHT SIDE IS ALSO SHOWING INCONSISTANT FALL TO THE FRONT ** 4) Positive fall is considered to be 0.10 of a foot every 20 feet. Section 300.01 D(4) V-17 ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" _________________________________________________________________________________________________________________________ 8/27/2025 - PREVIOUS INSPECTION NOTES ** 08/27/25 YOUR FINAL SURVEY SHOWS THAT YOU DRAINAGE WILL NEGATIVELY IMPACT THE ADJACENT PROPERTY TO THE REAR AND ALONG THE LEFT AND RIGHT SIDE PROPERTY LINES ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** LEFT SIDE FLOW IS INCONSISTANT YOU NEED TO SHOW POSITIVE FALL FROM THE REAR TO THE FRONT ** RIGHT SIDE IS ALSO SHOWING INCONSISTANT FALL TO THE FRONT ** 4) Positive fall is considered to be 0.10 of a foot every 20 feet. Section 300.01 D(4) V-17 ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/16/2026 | Disapproved -FEE REQUIRED | EMADISON |
| Note: **01/16/26 AS NOTED IN PREVIOUS FINAL SURVEY CONDITIONS FOR DRAINAGE STILL REQUIRE TO BE CORRECTED ** YOUR FINAL SURVEY SHOWS THAT YOU DRAINAGE WILL NEGATIVELY IMPACT THE ADJACENT PROPERTY TO THE REAR AND ALONG THE LEFT AND RIGHT SIDE PROPERTY LINES ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** LEFT SIDE FLOW IS INCONSISTANT YOU NEED TO SHOW POSITIVE FALL FROM THE REAR TO THE FRONT ** RIGHT SIDE IS ALSO SHOWING INCONSISTANT FALL TO THE FRONT ** 4) Positive fall is considered to be 0.10 of a foot every 20 feet. Section 300.01 D(4) V-17 ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" _________________________________________________________________________________________________________________________ 8/27/2025 - PREVIOUS INSPECTION NOTES ** 08/27/25 YOUR FINAL SURVEY SHOWS THAT YOU DRAINAGE WILL NEGATIVELY IMPACT THE ADJACENT PROPERTY TO THE REAR AND ALONG THE LEFT AND RIGHT SIDE PROPERTY LINES ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** LEFT SIDE FLOW IS INCONSISTANT YOU NEED TO SHOW POSITIVE FALL FROM THE REAR TO THE FRONT ** RIGHT SIDE IS ALSO SHOWING INCONSISTANT FALL TO THE FRONT ** 4) Positive fall is considered to be 0.10 of a foot every 20 feet. Section 300.01 D(4) V-17 ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/27/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 08/27/25 YOUR FINAL SURVEY SHOWS THAT YOU DRAINAGE WILL NEGATIVELY IMPACT THE ADJACENT PROPERTY TO THE REAR AND ALONG THE LEFT AND RIGHT SIDE PROPERTY LINES ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** LEFT SIDE FLOW IS INCONSISTANT YOU NEED TO SHOW POSITIVE FALL FROM THE REAR TO THE FRONT ** RIGHT SIDE IS ALSO SHOWING INCONSISTANT FALL TO THE FRONT ** 4) Positive fall is considered to be 0.10 of a foot every 20 feet. Section 300.01 D(4) V-17 ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" | |||
| ELECTRIC AND ALARM | 03/19/2025 | APPROVED | JSTEWART |
| Note: 3/13/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 3/13/2025 1:37:44 PM *** required pool barrier (permanent/temporary) needs to be inplace for approval. R4501.17.1 Outdoor swimming pools. | |||
| ELECTRIC AND ALARM | 03/13/2025 | Disapproved - NO FEE | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 3/13/2025 1:37:44 PM *** required pool barrier (permanent/temporary) needs to be inplace for approval. R4501.17.1 Outdoor swimming pools. | |||
| POOL DECK | 02/28/2025 | APPROVED | FWILLIS |
| Note: 2/27/2025 - PREVIOUS INSPECTION NOTES | |||
| POOL DECK | 02/27/2025 | CANCELLED BY APPLICANT | FWILLIS |
| STEEL AND GROUND | 11/27/2024 | APPROVED | FWILLIS |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | HOLD | 09/03/2025 | 09/03/2025 |
| Note: Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM 1. RENAME FILE NAME TO APPLICATION.PDF 2. PERMIT APPLICATION MISSING ESTIMATED VALUE | |||
| BADMIN | COMPLETE | 09/03/2025 | 09/03/2025 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 08/21/2025 | 08/21/2025 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Extension form missing projected timeline. | |||
| ZON | COMPLETE | 10/30/2024 | 10/31/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | HOLD | 10/22/2024 | 10/23/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM REPEAT COMMENT: Please provide setbacks from pool deck to side and rear property lines on site plan for review | |||
| BLD | COMPLETE | 10/22/2024 | 10/29/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/22/2024 | 10/25/2024 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| BLD | HOLD | 10/11/2024 | 10/14/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Provide detail or note on plans showing existing fence complies with R4501.17.1.8. Show door swing and latch height. | |||
| ELEC | COMPLETE | 10/11/2024 | 10/14/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/11/2024 | 10/18/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 10/11/2024 | 10/14/2024 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM THE PROPOSED ELEVATIONS ARE NOT UP TO CITY STANDARDS NEED TO HAVE .30 FROM TOE OF THE SWALE AND TOP OF SWALE SO WATER WILL NOT IMPACT ADJACENT LOTS. | |||
| ZON | HOLD | 10/11/2024 | 10/11/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide setbacks from pool deck to side and rear property lines on site plan for review Please remove your pink fence line as it is not correct. The fence is actually already shown on the survey. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| RSI REINSPECTION 1 | ¤35.00 | 03/05/2026 |
| RSI REINSPECTION 1 | ¤35.00 | 02/24/2026 |
| SURCHARGE FS 533.721 | ¤2.00 | 09/23/2025 |
| SURCHARGE - FS 468.631 | ¤2.57 | 09/23/2025 |
| SW ENG INSPECTION 40 | ¤40.00 | 09/23/2025 |
| ADJUSTMENT 10% | (¤19.00) | 09/23/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 09/23/2025 |
| INSPECTION- POOL | ¤160.00 | 09/23/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 09/23/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤305.57 |