Permit #2025091049

Permit Details

Status: COED

Parcel Id: 07-11-31-7037-00460-0130
CONDITIONED SPACE: 1834 sqft
GARAGE: 699 sqft
OPENED PORCH (WITH ROOF) : 218 sqft
Total Square Footage: 2751 sqft
Block: 00460
Subdivision: 2176 - SECTION 37-LAKEVIEW
Job Phone: 386-445-9009
Location Address: 25 LANSING LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/06/2026
NOC: RECORDED
Applicant name: BRIAN ANDREW GAZZOLI
Owner: SEAGATE HOMES LLC

Address

185 CYPRESS POINT PARKWAY

PALM COAST, FL 32164

Address

SUITE 7

PALM COAST, FL 32164

Lot: 0130
Contracted Stated Job Value: ¤382,200.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SEAGATE HOMES, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

185 CYPRESS POINT PARKWAY

Palm Coast, FL 32137

SUITE 7

Palm Coast, FL 32137

CGC1518372 (Exp: 08/31/2026) 386-246-6132

Sub Contractors

RICHARD H SIMMONS JR
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 1963

BUNNELL, FL 32110

ES12001217 (Exp: 08/31/2026) 386-437-0607 386-437-1847
TIMUR ISPARYAN
Status Location Address State License Number Phone Fax
ACTIVE

3665 SPRINK PARK ROAD

JACKSONVILLE , FL 32207

CMC1249968 (Exp: 08/31/2026) 904-245-1818 904-337-1910
CHAD DAVID GRESSANI
Status Location Address State License Number Phone Fax
ACTIVE

2640 BROOKSHIRE CIRCLE

MELBOURNE, FL 32904

CCC1327235 (Exp: 08/31/2026) 321-288-6415 321-729-8997
ROBERTO F GONZALEZ
Status Location Address State License Number Phone
ACTIVE

212 PALMETTO AVE

CRESCENT CITY, FL 32112

RF11067887 (Exp: 08/31/2027) 286-559-2885

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 05/21/2026 FINAL APPROVED HCAMACHO
U-CROSS CONNECTION 05/21/2026 APPROVED - AS NOTED BHAINES
Note: No CC, IRR with potable water, PVB in place
ROW - FINAL APRON (AFTER POUR) 05/21/2026 APPROVED EMADISON
Note: ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - FINAL INSPECTION 05/21/2026 APPROVED EMADISON
Note: ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
U -UTILITY RESIDENTIAL FINAL 05/21/2026 FINAL APPROVED BHAINES
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/20/2026 APPROVED TPOLACEK
Note: BASED ON THE ENGINEERS SIGNED AND SEALED LGDC MEETING THE COPC MINIMUM REQUIREMENTS AT THE TIME OF THIS INSPECTION, I AM APPROVING THIS DOCUMENT. Effective 03-25-26, the ROW Field Survey requirement is no longer in effect for Final Lot Grading and Drainage Certificates for new construction on subdivision and infill lots. All Final Lot Grading and Drainage Certificates for these projects will now be reviewed and approved only in the office. Field verification for the ROW-FIELD SURVEY will no longer be required as part of the standard approval process for these permit types
ELECTRIC - EARLY POWER 04/23/2026 APPROVED - AS NOTED JSTEWART
Note: Authorise release of email.
ROW- PRE-APRON (PRE-POUR) 04/22/2026 APPROVED - AS NOTED EMADISON
Note: ** 04/22/26 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300, E RESIDENTIAL CULVERT DETAIL
GRAVITY SEWER TEST 04/14/2026 APPROVED KSANDOE
SEWER TIE IN 04/14/2026 APPROVED KSANDOE
PEP TANK INSTALLATION REQUEST 03/30/2026 APPROVED ISANDERSON
DRYWALL NAILING 03/24/2026 APPROVED KSANDOE
Note: 3/23/2026 - PREVIOUS INSPECTION NOTES
DRYWALL NAILING 03/23/2026 CANCELLED BY APPLICANT JSTEWART
LATH/BRICK/ WATER BARRIER 03/20/2026 APPROVED JSTEWART
INSULATION 03/18/2026 APPROVED JSTEWART
ALL ROUGH 03/13/2026 APPROVED PKNAPIK
ROOF VALLEY & METAL 03/12/2026 APPROVED MCONTRYMAN
Note: Inspector Notes from Inspection 2450
WALL SHEATHING 02/26/2026 APPROVED - AS NOTED JSTEWART
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/26/2026 APPROVED - AS NOTED JSTEWART
Note: Please add 1 anchor to sole plate at garage bearing wall at double break (Aproximatly center by plumbing drain)
TIE BEAM / LINTEL 02/11/2026 APPROVED KSANDOE
MONOLITHIC SLAB 01/30/2026 APPROVED MCONTRYMAN
PLUMBING 1ST ROUGH UNDERGROUND 01/28/2026 APPROVED MCONTRYMAN
FORMBOARD SURVEY (OFFICE USE ONLY) 01/27/2026 APPROVED RRICKS
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 01/20/2026 APPROVED PKNAPIK
WATER METER INSTALLATION REQUEST 01/09/2026 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
SW1 COMPLETE 01/27/2026 01/27/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 01/27/2026 01/27/2026
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 01/20/2026 01/20/2026
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SWALE COMPLETE 09/29/2025 10/20/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
BLD COMPLETE 09/25/2025 09/30/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 09/25/2025 10/07/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 09/25/2025 09/29/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/25/2025 09/29/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 09/25/2025 09/26/2025
LOCATE COMPLETE 09/25/2025 09/30/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 09/25/2025 09/26/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 09/25/2025 09/30/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 09/25/2025 09/26/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
WATER- TURN ON ¤50.00 01/06/2026
ADJUSTMENT 10% (¤138.20) 01/06/2026
ADMINISTRATIVE RESIDENTIAL ¤30.00 01/06/2026
INSPECTION - RESIDENTIAL ¤1,053.25 01/06/2026
PLAN REVIEW - RESIDENTIAL ¤298.74 01/06/2026
FC IMPACT FEE EMS ¤62.00 01/06/2026
IMPACT FEE FIRE ¤434.51 01/06/2026
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 01/06/2026
FC IMPACT FEE LIBRARY ¤268.00 01/06/2026
IMPACT FEE PARKS ¤1,828.01 01/06/2026
IMPACT FEE SCHOOL ¤5,450.00 01/06/2026
IMPACT FEE TRANSPORTATION ¤1,916.00 01/06/2026
PEP TANK INSTALL ¤756.74 01/06/2026
WASTEWATER MAIN EXTENSION IMPA ¤2,385.00 01/06/2026
SURCHARGE FS 533.721 ¤12.44 01/06/2026
SURCHARGE - FS 468.631 ¤18.66 01/06/2026
SW ENG - FOUNDATION SURVEY ¤20.00 01/06/2026
SW ENG INSPECTION 80 ¤80.00 01/06/2026
SW ENG PRE APRON ¤30.00 01/06/2026
SW ENG - REVIEW 20 ¤20.00 01/06/2026
SW ENG RES REVIEW 200 ¤200.00 01/06/2026
WATER METER W/ TAP ¤2,326.93 01/06/2026
SEWER CREDIT (¤850.00) 01/06/2026
WASTEWATER PERM INSPECTION ¤80.00 01/06/2026
WASTEWATER PERM REVIEW ¤25.00 01/06/2026
SEWER CAPITAL FACILITY ¤4,415.00 01/06/2026
WATER CAPITAL FACILITY FEE ¤3,790.49 01/06/2026
WATER PERMIT REVIEW ¤25.00 01/06/2026
WATER MAIN EXTENSION IMPACT ¤917.27 01/06/2026
SITE PLAN 30 ¤30.00 01/06/2026
Fees Total Due: ¤0.00 Total Paid: ¤25,752.84