Permit #2025091082

Permit Details

Status: INSPECT

Parcel Id: 30-12-31-0000-01020-0040
Subdivision: 2371 - SEMINOLE TRACE PHASE 1
Job Phone: 386-322-8700
Location Address: 9 GOLDENROD LN
Type: CSD - COMMERCIAL SITE DEVELOPMENT
Issue Date: 12/31/2025
NOC: Unknown
Applicant name: CHAD HAZEN
Owner: KL SEMINOLE TRACE LLC

Address

105 NE 1ST STREET

DELRAY BEACH, FL 33444

Job Description: SITE WORK: SEMINOLE TRACE AMENITY
Type: CN

Contractor

HAZEN CONSTRUCTION LLC
Status Location Address State License Number Phone
ACTIVE

1599 TIONIA RD

NEW SMYRNA BEACH, FL 32168

CGC061991 (Exp: 08/31/2026) 386-322-8700

Inspection History

Type Request Date Result Inspector
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 05/27/2026 PARTIALLY APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9111 Inspector Notes from Inspection 9113 Inspector Notes from Inspection 9114 3/18/2026 - PREVIOUS INSPECTION NOTES NEVER WAS SCHEDULED OR INFORMED-all catch basins with associated pipe installed-found out with routine site visit ALL NOW INSTALLED 3/18/2026 - PREVIOUS INSPECTION NOTES NEVER WAS SCHEDULED OR INFORMED-all catch basins installed-found out with routine site visit NEVER CONTACTED OR SCHEDULED-ASPHALT NOW INSTALLED WITH COMPACTION TEST REPORTS TO FOLLOW TURN DOWN SIDEWALK NOW INSTALLED-CURRENTLY FINISHING AT SOUTH CORNER/ISLAND AREA
UC-DRAINAGE PIPE PLACEMENT/LAMPING 05/20/2026 APPROVED - AS NOTED LFITZGERALD
Note: 3/18/2026 - PREVIOUS INSPECTION NOTES NEVER WAS SCHEDULED OR INFORMED-all catch basins with associated pipe installed-found out with routine site visit ALL NOW INSTALLED
UC-ASPHALT PRE PLACEMENT 05/20/2026 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9113 Inspector Notes from Inspection 9114 3/18/2026 - PREVIOUS INSPECTION NOTES NEVER WAS SCHEDULED OR INFORMED-all catch basins with associated pipe installed-found out with routine site visit ALL NOW INSTALLED 3/18/2026 - PREVIOUS INSPECTION NOTES NEVER WAS SCHEDULED OR INFORMED-all catch basins installed-found out with routine site visit NEVER CONTACTED OR SCHEDULED-ASPHALT NOW INSTALLED WITH COMPACTION TEST REPORTS TO FOLLOW
UC-DRAINAGE STRUCT PLACMNT 05/20/2026 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9114 3/18/2026 - PREVIOUS INSPECTION NOTES NEVER WAS SCHEDULED OR INFORMED-all catch basins with associated pipe installed-found out with routine site visit ALL NOW INSTALLED 3/18/2026 - PREVIOUS INSPECTION NOTES NEVER WAS SCHEDULED OR INFORMED-all catch basins installed-found out with routine site visit
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 05/06/2026 Disapproved - NO FEE JMYERS
Note: 5/6/26 SOME MEASURES INSTALLED, OTHERS REMAIN OUTSTANDING. INSTALL ALL MEASURES REQUIRED PER APPROVED SWPPP. 5/4/2026 - PREVIOUS INSPECTION NOTES 5/4/26 CORRECTIONS NOT MADE. EROSION CONTROL MEASURES NOT INSTALLED PER SWPPP. FOLLOW UP INSPECTION ON 4/6/26 WHERE A STOP WORK ORDER WILL BE PLACED IF CORRECTIONS ARE NOT MADE. 4/30/2026 - PREVIOUS INSPECTION NOTES 4/30/26 CORRECTIONS NOT MADE. EROSION CONTROL MEASURES NOT INSTALLED PER SWPPP. FOLLOW UP INSPECTION ON 5/4/26. 4/23/2026 - PREVIOUS INSPECTION NOTES 4/23/26 NO VISIBLE EROSION CONTROL MEASURES INSTALLED. MEASURES SHALL BE INSTALLED IN ACCORDANCE WITH APPROVED SWPPP. FOLLOW UP INSPECTION 4/30/26.
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 05/04/2026 Disapproved -FEE REQUIRED JMYERS
Note: 5/4/26 CORRECTIONS NOT MADE. EROSION CONTROL MEASURES NOT INSTALLED PER SWPPP. FOLLOW UP INSPECTION ON 4/6/26 WHERE A STOP WORK ORDER WILL BE PLACED IF CORRECTIONS ARE NOT MADE. 4/30/2026 - PREVIOUS INSPECTION NOTES 4/30/26 CORRECTIONS NOT MADE. EROSION CONTROL MEASURES NOT INSTALLED PER SWPPP. FOLLOW UP INSPECTION ON 5/4/26. 4/23/2026 - PREVIOUS INSPECTION NOTES 4/23/26 NO VISIBLE EROSION CONTROL MEASURES INSTALLED. MEASURES SHALL BE INSTALLED IN ACCORDANCE WITH APPROVED SWPPP. FOLLOW UP INSPECTION 4/30/26.
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 04/30/2026 Disapproved -FEE REQUIRED JMYERS
Note: 4/30/26 CORRECTIONS NOT MADE. EROSION CONTROL MEASURES NOT INSTALLED PER SWPPP. FOLLOW UP INSPECTION ON 5/4/26. 4/23/2026 - PREVIOUS INSPECTION NOTES 4/23/26 NO VISIBLE EROSION CONTROL MEASURES INSTALLED. MEASURES SHALL BE INSTALLED IN ACCORDANCE WITH APPROVED SWPPP. FOLLOW UP INSPECTION 4/30/26.
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 04/17/2026 Disapproved - NO FEE JMYERS
Note: 4/23/26 NO VISIBLE EROSION CONTROL MEASURES INSTALLED. MEASURES SHALL BE INSTALLED IN ACCORDANCE WITH APPROVED SWPPP. FOLLOW UP INSPECTION 4/30/26.
UC-CONSTRUCTION ENTRANCE 03/31/2026 APPROVED LFITZGERALD
UC-DRAINAGE PIPE PLACEMENT/LAMPING 03/18/2026 PARTIALLY APPROVED LFITZGERALD
Note: NEVER WAS SCHEDULED OR INFORMED-all catch basins with associated pipe installed-found out with routine site visit
UC-DRAINAGE STRUCT PLACMNT 03/18/2026 PARTIALLY APPROVED LFITZGERALD
Note: NEVER WAS SCHEDULED OR INFORMED-all catch basins installed-found out with routine site visit
PLAN - PRE-CON 386-986-3750 01/06/2026 APPROVED - AS NOTED LFITZGERALD
Note: all city staff-RSI/EROSION/BUILDING/UTILITY-met with Hazen-Mike and his PE and PM
PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY
IRRIGATION AFFIDAVIT
LDSC-IRRIGATION FINAL
LDSC- LANDSCAPE / IRRIGATION AS-BUILT
LDSC- LANDSCAPE FINAL
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR
U-WATER SERVICE INSTALLATION
U-GRAVITY SEWER INSTALL/TESTING
GEOTECH-SITE PREP ENG CERTIFICATIO (OFFICE USE ONLY)
BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS
BLD- ADA PARKING
BLD- ADA VEHICULAR WAY
BLD - UNDERGROUND SITE LIGHTING CONDUITS
BLD - SITE LIGHTING-PLACEMENT/FOUNDATION
BLD - SITE LIGHTING-POLE SET/FIXTURE
MAINT BOND ACCEPTANCE (OFFICE)
CLOSE OUT DOCUMENTS
U-WATER METER INSTALLATION/VERIFICATION
PROJECT CLOSE OUT MEETING (386-986-3750)
UC-SUBSTANTIAL WALK-THRU
UC- PRELIMINARY AS-BUILTS
UC-FINAL SITE INSPECTION
UC-FINAL SITE STABILIZATION
U - UTILITY COMMERCIAL FINAL
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE
Note: 5/6/2026 3:36:33 PM- PREVIOUS INSPECTION NOTES 5/6/26 SOME MEASURES INSTALLED, OTHERS REMAIN OUTSTANDING. INSTALL ALL MEASURES REQUIRED PER APPROVED SWPPP. 5/4/2026 - PREVIOUS INSPECTION NOTES 5/4/26 CORRECTIONS NOT MADE. EROSION CONTROL MEASURES NOT INSTALLED PER SWPPP. FOLLOW UP INSPECTION ON 4/6/26 WHERE A STOP WORK ORDER WILL BE PLACED IF CORRECTIONS ARE NOT MADE. 4/30/2026 - PREVIOUS INSPECTION NOTES 4/30/26 CORRECTIONS NOT MADE. EROSION CONTROL MEASURES NOT INSTALLED PER SWPPP. FOLLOW UP INSPECTION ON 5/4/26. 4/23/2026 - PREVIOUS INSPECTION NOTES 4/23/26 NO VISIBLE EROSION CONTROL MEASURES INSTALLED. MEASURES SHALL BE INSTALLED IN ACCORDANCE WITH APPROVED SWPPP. FOLLOW UP INSPECTION 4/30/26.
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL)
Note: 5/27/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9111 Inspector Notes from Inspection 9113 Inspector Notes from Inspection 9114 3/18/2026 - PREVIOUS INSPECTION NOTES NEVER WAS SCHEDULED OR INFORMED-all catch basins with associated pipe installed-found out with routine site visit ALL NOW INSTALLED 3/18/2026 - PREVIOUS INSPECTION NOTES NEVER WAS SCHEDULED OR INFORMED-all catch basins installed-found out with routine site visit NEVER CONTACTED OR SCHEDULED-ASPHALT NOW INSTALLED WITH COMPACTION TEST REPORTS TO FOLLOW TURN DOWN SIDEWALK NOW INSTALLED-CURRENTLY FINISHING AT SOUTH CORNER/ISLAND AREA
UROW- CURBING & GUTTER
U-ROW FINAL
UC-TRAF - FINAL (SIGN/PAVEMENT MARKING)

Review History

Department Status Date In Date Out
DSD COMPLETE 12/30/2025 12/30/2025
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
BLD COMPLETE 09/25/2025 09/26/2025
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
ELEC COMPLETE 09/25/2025 09/26/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
PLENG COMPLETE 09/25/2025 09/26/2025
Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM
PLLA COMPLETE 09/25/2025 09/25/2025
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
UD1 COMPLETE 09/25/2025 10/07/2025
Note: Released By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM
DSD HOLD 09/25/2025 09/25/2025
Note: Held By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADJUSTMENT 10% (¤36.50) 12/31/2025
ADMINISTRATIVE- SITE DEVELOP ¤125.00 12/31/2025
INSPECTION - GENERAL ¤240.00 12/31/2025
SITE DEVELOPMENT ADMIN PLANNIN ¤179.00 12/31/2025
SITE INSPECTION ¤684.00 12/31/2025
SITE PLAN 29 ¤29.00 12/31/2025
REINSPECTION- SITE INSPECTOR ¤40.00
REINSPECTION- SITE INSPECTOR ¤40.00
Fees Total Due: ¤80.00 Total Paid: ¤1,220.50