I want to search for...
Permit #2025091086
Permit Details
Status: COED
| Parcel Id: 07-11-31-7059-00980-0170 |
| CONDITIONED SPACE: 1822 sqft |
| GARAGE: 394 sqft |
| OPENED PORCH (WITH ROOF) : 229 sqft |
| Total Square Footage: 2445 sqft |
| Block: 00980 |
| Subdivision: 7059 - |
| Job Phone: 386-445-9009 |
| Location Address: 9 SEA BROOK PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/09/2025 |
| NOC: RECORDED |
| Applicant name: BRIAN ANDREW GAZZOLI |
| Owner: SEAGATE HOMES LLC |
|
Address 185 CYPRESS POINT PARKWAY PALM COAST, FL 32164 |
|
Address SUITE 7 PALM COAST, FL 32164 |
| Lot: 0170 |
| Contracted Stated Job Value: ¤339,700.00 |
| Job Description: single family residence |
| Type: CN |
Contractor
SEAGATE HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
185 CYPRESS POINT PARKWAY Palm Coast, FL 32137 |
SUITE 7 Palm Coast, FL 32137 |
CGC1518372 (Exp: 08/31/2026) | 386-246-6132 |
Sub Contractors
TIMUR ISPARYAN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
3665 SPRINK PARK ROAD JACKSONVILLE , FL 32207 |
CMC1249968 (Exp: 08/31/2026) | 904-245-1818 | 904-337-1910 |
CHAD DAVID GRESSANI
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2640 BROOKSHIRE CIRCLE MELBOURNE, FL 32904 |
CCC1327235 (Exp: 08/31/2026) | 321-288-6415 | 321-729-8997 |
RICHARD H SIMMONS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 1963 BUNNELL, FL 32110 |
ES12001217 (Exp: 08/31/2026) | 386-437-0607 | 386-437-1847 |
ROBERTO F GONZALEZ
| Status | Location Address | State License Number | Phone |
| ACTIVE |
212 PALMETTO AVE CRESCENT CITY, FL 32112 |
RF11067887 (Exp: 08/31/2027) | 286-559-2885 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 06/04/2026 | APPROVED | TLOWE |
| Note: 6/3/2026 - PREVIOUS INSPECTION NOTES Needs grass cleared off around pep tank lid to make accessible. | |||
| ROW - FINAL INSPECTION | 06/03/2026 | APPROVED | FSLADISH |
| Note: 6/3/26 CITY OF PALM COAST MINIMUM STANDARDS ARE MET AT THE TIME OF THIS INSPECTION. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| U -UTILITY RESIDENTIAL FINAL | 06/03/2026 | Disapproved - NO FEE | BHAINES |
| Note: Needs grass cleared off around pep tank lid to make accessible. | |||
| U-CROSS CONNECTION | 06/03/2026 | APPROVED - AS NOTED | BHAINES |
| Note: No CC, IRR with potable water, PVB in place | |||
| ROW - FINAL APRON (AFTER POUR) | 06/03/2026 | APPROVED | FSLADISH |
| Note: 6/3/26 CITY OF PALM COAST MINIMUM STANDARDS ARE MET AT THE TIME OF THIS INSPECTION. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| BLD - BUILDING FINAL | 06/03/2026 | APPROVED | CVANSTRAHLEN |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/20/2026 | APPROVED | FSLADISH |
| Note: 5/20/26 BASED ON THE ENGINEER SIGNED AND SEALED LGADC MEETING THE COPC MINIMUM REQUIREMENTS AT THE TIME OF THIS INSPECTION, I AM APPROVING THIS DOCUMENT. Effective 3/25/26, the ROW Field Survey requirement is no longer in effect for Final Lot Grading and Drainage Certification for new construction on subdivision and infill lots. All Final Lot Grading and Drainage Certificates for these projects will now be reviewed and approved only in the office. Field verification for the ROW-FIELD SURVEY will no longer be required as part of the standard approval process for these permit types. | |||
| ROW- PRE-APRON (PRE-POUR) | 04/28/2026 | APPROVED | PFLANAGAN |
| Note: Culvert place where Parren and Frank told them to put it so all swales will match up. Passing that the did everything we told them to do. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. ------------------------------------------------------------------------------------------- 4/24/2026 - PREVIOUS INSPECTION NOTES 4/24/26 MET ON SITE WITH JOE G CM BRANDON GRADER AND PARREN. DETERMINED CULVERT PIPE 8 FOOT DISTANCE FROM FIXED POINT. PUT REBAR IN CENTER WHERE CULVERT PIPE WILL LAY AT 8 FOOT ON BOTH SIDES. CANCELING AS A COURTESY. PIPE WILL BE RESET. | |||
| ROW- PRE-APRON (PRE-POUR) | 04/24/2026 | CANCELLED BY APPLICANT | FSLADISH |
| Note: 4/24/26 MET ON SITE WITH JOE G CM BRANDON GRADER AND PARREN. DETERMINED CULVERT PIPE 8 FOOT DISTANCE FROM FIXED POINT. PUT REBAR IN CENTER WHERE CULVERT PIPE WILL LAY AT 8 FOOT ON BOTH SIDES. CANCELING AS A COURTESY. PIPE WILL BE RESET. | |||
| ELECTRIC - EARLY POWER | 04/10/2026 | APPROVED | CVANSTRAHLEN |
| GRAVITY SEWER TEST | 04/06/2026 | APPROVED | CVANSTRAHLEN |
| SEWER TIE IN | 04/06/2026 | APPROVED | CVANSTRAHLEN |
| U - SEWER TIE IN | 04/06/2026 | APPROVED | KSANDOE |
| PEP TANK INSTALLATION REQUEST | 03/16/2026 | APPROVED | ISANDERSON |
| LATH/BRICK/ WATER BARRIER | 03/11/2026 | APPROVED | CVANSTRAHLEN |
| INSULATION | 03/06/2026 | APPROVED | KSANDOE |
| Note: Items listed have been addressed and clarified with contractor. There is not evidence of ill will or subversive intent by the builder or sub contractor. 3/5/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection Item #1 and #2 from previous inspection are not fix ( cant not just print and add layout to permit with out resubmitting for revision and approval please fix items Inspector Notes from Inspection 2420 Please fix items before next inspection #1-FBCR 609.1-GAP AT WINDOW/DOOR REVEAL TOO LARGE > 1/4 " PER MANUFACTURERS SPECS ( removed caulk bottom of window and install solid shims , windows mark with red sharpie market ) #2-Please resubmit E-cals for revision and approval (FBC [A]107.4-DUCT LAYOUT DOES NOT MATCH ENERGY CALCS) one of the ducts work call for a 14 , install in place is a 12 ) #3-bedroom behing garage have a brockend window | |||
| INSULATION | 03/05/2026 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: Please fix items before next inspection Item #1 and #2 from previous inspection are not fix ( cant not just print and add layout to permit with out resubmitting for revision and approval please fix items Inspector Notes from Inspection 2420 Please fix items before next inspection #1-FBCR 609.1-GAP AT WINDOW/DOOR REVEAL TOO LARGE > 1/4 " PER MANUFACTURERS SPECS ( removed caulk bottom of window and install solid shims , windows mark with red sharpie market ) #2-Please resubmit E-cals for revision and approval (FBC [A]107.4-DUCT LAYOUT DOES NOT MATCH ENERGY CALCS) one of the ducts work call for a 14 , install in place is a 12 ) #3-bedroom behing garage have a brockend window | |||
| ALL ROUGH | 03/03/2026 | APPROVED - AS NOTED | CVANSTRAHLEN |
| Note: Please fix items before next inspection #1-FBCR 609.1-GAP AT WINDOW/DOOR REVEAL TOO LARGE > 1/4 " PER MANUFACTURERS SPECS ( removed caulk bottom of window and install solid shims , windows mark with red sharpie market ) #2-Please resummit E-cals for revision and approval (FBC [A]107.4-DUCT LAYOUT DOES NOT MATCH ENERGY CALCS) one of the ducts work call for a 14 , install in place is a 12 ) #3-bedroom behing garage have a brockend window | |||
| ROOF VALLEY & METAL | 02/24/2026 | APPROVED | CVANSTRAHLEN |
| WALL SHEATHING | 02/20/2026 | APPROVED | CVANSTRAHLEN |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/20/2026 | APPROVED | CVANSTRAHLEN |
| TIE BEAM / LINTEL | 02/04/2026 | APPROVED | BTAYLOR |
| MONOLITHIC SLAB | 01/23/2026 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/22/2026 | APPROVED | BTAYLOR |
| MONOLITHIC SLAB | 01/22/2026 | CANCELLED BY APPLICANT | WEB |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 01/21/2026 | APPROVED | RRICKS |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 01/12/2026 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 01/07/2026 | APPROVED | CBOWERMASTER |
| Note: 12/22/2025 1:31:26 PM- PREVIOUS INSPECTION NOTES STUMP LSPL NEED FILL DIRT TO LOW | |||
| WATER METER INSTALLATION REQUEST | 12/19/2025 | Disapproved -FEE REQUIRED | BVITALE |
| Note: STUMP LSPL NEED FILL DIRT TO LOW |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 04/13/2026 | 04/16/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/23/2026 | 02/24/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/21/2026 | 01/21/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/21/2026 | 01/21/2026 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/12/2026 | 01/12/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/21/2025 | 11/21/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 11/12/2025 | 11/17/2025 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM 1. The driveway culvert alignment needs to be rotated counter-clockwise so it becomes parallel with the ROW line. This way, as unlikely as it may be, if the road gets extended in the future, only a portion of the driveway gets replaced and not the culvert. Also, this should allow for the construction of the road frontage swale along the entire width of the lot in a manner more consistent with the city's standard swale construction. 2. As a result of comment number 1 above, please design/construct a typical road frontage swale as per the swale diagram to be provided by the city. | |||
| PLSW | COMPLETE | 10/24/2025 | 11/03/2025 |
| Note: Released By: CARMELO MORALES - (386)986-4758 - CMORALES@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 10/24/2025 | 10/30/2025 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Address Hold Comment by Carmelo: Held By: CARMELO MORALES - (386)986-4758 - CMORALES@PALMCOASTGOV.COM 1. The driveway culvert alignment needs to be rotated counter-clockwise so it becomes parallel with the ROW line. This way, as unlikely as it may be, if the road gets extended in the future, only a portion of the driveway gets replaced and not the culvert. Also, this should allow for the construction of the road frontage swale along the entire width of the lot in a manner more consistent with the city's standard swale construction. 2. As a result of comment number 1 above, please design/construct a typical road frontage swale as per the swale diagram to be provided by the city. Grading Comments: - Berm on the left side of the home is not needed based on the information provided. Please feel free to call or email if there are any questions or concerns. | |||
| SWALE | COMPLETE | 09/29/2025 | 10/10/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/26/2025 | 10/01/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 09/26/2025 | 10/07/2025 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 09/26/2025 | 10/01/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/26/2025 | 09/29/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 09/26/2025 | 09/26/2025 |
| LOCATE | COMPLETE | 09/26/2025 | 09/30/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/26/2025 | 09/29/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/26/2025 | 10/01/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Note: There are no improved lots on the right side of this lot at this time. | |||
| ZON | COMPLETE | 09/26/2025 | 09/26/2025 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| PLSW | HOLD | 09/26/2025 | 10/02/2025 |
| Note: Held By: CARMELO MORALES - (386)986-4758 - CMORALES@PALMCOASTGOV.COM 1. The driveway culvert alignment needs to be rotated counter-clockwise so it becomes parallel with the ROW line. This way, as unlikely as it may be, if the road gets extended in the future, only a portion of the driveway gets replaced and not the culvert. Also, this should allow for the construction of the road frontage swale along the entire width of the lot in a manner more consistant with the city's standard swale construction. 2. As a result of comment number 1 above, please design/construct a typical road frontage swale as per the swale diagram to be provided by the city. | |||
| PLENV | INFORMATION | 09/26/2025 | 10/03/2025 |
| Note: Marked INFORMATION By: DYLAN RODRIGUEZ - (386)986-2320 - DRODRIGUEZ@PALMCOASTGOV.COM 1.0 INFORMATIONAL - Coordinate with the Florida Department of Environmental Protection (FDEP) to obtain any necessary Wetland Impact Permits | |||
| UD1 | COMPLETE | 09/26/2025 | 10/07/2025 |
| Note: Released By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 06/04/2026 |
| PLAN REVIEW - REVISION | ¤32.50 | 06/04/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/04/2026 |
| FC IMPACT FEE EMS | ¤62.00 | 12/09/2025 |
| IMPACT FEE FIRE | ¤434.51 | 12/09/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 12/09/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 12/09/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 12/09/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 12/09/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 12/09/2025 |
| PEP TANK INSTALL | ¤756.74 | 12/09/2025 |
| WATER- TURN ON | ¤50.00 | 12/09/2025 |
| ADJUSTMENT 10% | (¤125.14) | 12/09/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 12/09/2025 |
| INSPECTION - RESIDENTIAL | ¤951.50 | 12/09/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤269.88 | 12/09/2025 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,385.00 | 12/09/2025 |
| SURCHARGE FS 533.721 | ¤11.26 | 12/09/2025 |
| SURCHARGE - FS 468.631 | ¤16.89 | 12/09/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 12/09/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 12/09/2025 |
| SW ENG PRE APRON | ¤30.00 | 12/09/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 12/09/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 12/09/2025 |
| WATER METER W/ TAP | ¤2,326.93 | 12/09/2025 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 12/09/2025 |
| WASTEWATER PERM REVIEW | ¤25.00 | 12/09/2025 |
| SEWER CAPITAL FACILITY | ¤4,415.00 | 12/09/2025 |
| WATER CAPITAL FACILITY FEE | ¤3,790.49 | 12/09/2025 |
| WATER PERMIT REVIEW | ¤25.00 | 12/09/2025 |
| WATER MAIN EXTENSION IMPACT | ¤917.27 | 12/09/2025 |
| SITE PLAN 30 | ¤30.00 | 12/09/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤26,594.84 |