I want to search for...

Permit #2025091144

Permit Details

Status: INSPECT

Parcel Id: 07-11-31-7014-00030-0421
CONDITIONED SPACE: 1834 sqft
GARAGE: 772 sqft
OPENED PORCH (WITH ROOF) : 218 sqft
Total Square Footage: 2824 sqft
Subdivision: -
Job Phone: 386-445-9009
Location Address: 33 CIMMARON DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 04/10/2026
NOC: RECORDED
Applicant name: BRIAN ANDREW GAZZOLI
Owner: SEAGATE HOMES, LLC

Address

185 CYPRESS POINT PKWY STE 7

PALM COAST, FL 32164

Contracted Stated Job Value: ¤392,360.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SEAGATE HOMES, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

185 CYPRESS POINT PARKWAY

Palm Coast, FL 32137

SUITE 7

Palm Coast, FL 32137

CGC1518372 (Exp: 08/31/2026) 386-246-6132

Sub Contractors

TIMUR ISPARYAN
Status Location Address State License Number Phone Fax
ACTIVE

3665 SPRINK PARK ROAD

JACKSONVILLE , FL 32207

CMC1249968 (Exp: 08/31/2026) 904-245-1818 904-337-1910
RICHARD H SIMMONS JR
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 1963

BUNNELL, FL 32110

ES12001217 (Exp: 08/31/2026) 386-437-0607 386-437-1847
CHAD DAVID GRESSANI
Status Location Address State License Number Phone Fax
ACTIVE

2640 BROOKSHIRE CIRCLE

MELBOURNE, FL 32904

CCC1327235 (Exp: 08/31/2026) 321-288-6415 321-729-8997
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996

Inspection History

Type Request Date Result Inspector
LATH/BRICK/ WATER BARRIER 06/11/2026 HCAMACHO
Note: Inspector Notes from Inspection 2490 6/9/26 Check at next inspection 2. Front window, in garage, is broken. Note on window states it is ordered and on back order at time of inspection Inspector Notes from Inspection 2420 6/4/26 1. Back left wall in lenai, under electrical, has block that significantly overhangs the foundation. It looks like a repair was attempted at one point, but failed. This will need to be repaired correctly 2. Front window, in garage, is broken. Note on window states it is ordered and on back order at time of inspection
INSULATION 06/09/2026 APPROVED - AS NOTED MCONTRYMAN
Note: 6/9/26 Check at next inspection 2. Front window, in garage, is broken. Note on window states it is ordered and on back order at time of inspection Inspector Notes from Inspection 2420 6/4/26 1. Back left wall in lenai, under electrical, has block that significantly overhangs the foundation. It looks like a repair was attempted at one point, but failed. This will need to be repaired correctly 2. Front window, in garage, is broken. Note on window states it is ordered and on back order at time of inspection
ALL ROUGH 06/04/2026 APPROVED - AS NOTED MCONTRYMAN
Note: 6/4/26 1. Back left wall in lenai, under electrical, has block that significantly overhangs the foundation. It looks like a repair was attempted at one point, but failed. This will need to be repaired correctly 2. Front window, in garage, is broken. Note on window states it is ordered and on back order at time of inspection
ROOF VALLEY & METAL 06/03/2026 APPROVED HCAMACHO
Note: Inspector Notes from Inspection 2460 1. T07 missing a couple peices of Eng. Marked.
WALL SHEATHING 05/27/2026 APPROVED HCAMACHO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/27/2026 APPROVED - AS NOTED HCAMACHO
Note: 1. T07 missing a couple peices of Eng. Marked.
ELEV CERT-FOUNDATION APPROVAL 05/21/2026 APPROVED JMYERS
TIE BEAM / LINTEL 05/18/2026 APPROVED MCONTRYMAN
FOUND SURVEY APPROVED (OFFICE) 05/15/2026 APPROVED RRICKS
MONOLITHIC SLAB 05/07/2026 APPROVED MCONTRYMAN
PLUMBING 1ST ROUGH UNDERGROUND 05/05/2026 APPROVED MCONTRYMAN
GRAVITY SEWER TEST 05/05/2026 APPROVED MCONTRYMAN
SEWER TIE IN 05/05/2026 APPROVED MCONTRYMAN
FORMBOARD SURVEY (OFFICE USE ONLY) 05/04/2026 APPROVED RRICKS
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 05/04/2026 APPROVED PKNAPIK
WATER METER INSTALLATION REQUEST 04/22/2026 APPROVED ISANDERSON
U-CROSS CONNECTION
ROW- PRE-APRON (PRE-POUR)
ROW - FINAL APRON (AFTER POUR)
ROW- FINAL SURVEY/GRADING CERTIFICATION
ROW - FINAL INSPECTION
Note: Note to inspector make sure all road damage is repaired before passing this inspection.
U -UTILITY RESIDENTIAL FINAL
BLD - BUILDING FINAL
WINDOW NAILING
FINAL SURVEY (OFFICE USE ONLY)
ELEVATION CERTIFICATE-FINAL APPROVAL
ELECTRIC - EARLY POWER

Review History

Department Status Date In Date Out
PLFM HOLD 05/20/2026 05/20/2026
Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM Please submit revised elevation certificate per email.
PLFM COMPLETE 05/20/2026 05/21/2026
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Foundation elevation certificate has been approved. Please provide Final prior to CO.
SW1 COMPLETE 05/15/2026 05/15/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 05/15/2026 05/15/2026
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
PLFM HOLD 05/15/2026 05/20/2026
Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The LAG and HAG are much lower than what was proposed especially for a monoslab. Please revise.
SW1 COMPLETE 05/04/2026 05/04/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 05/04/2026 05/04/2026
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM
BLD COMPLETE 05/04/2026 05/04/2026
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SW1 COMPLETE 10/27/2025 10/30/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/27/2025 10/27/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
PLFM COMPLETE 10/27/2025 10/28/2025
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM Construction elevation certificate has been approved. Please provide Foundation and Final prior to receiving CO.
SW1 HOLD 10/10/2025 10/10/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Previous comments not addressed: Grading comments: - Based on the information provided there is 1.1' grade drop adjacent to the foundation. The FD plan shows 20" mono slab which does not agree with proposed elevations on the right side of the home's foundation. Please revise as needed.
PLFM COMPLETE 10/10/2025 10/10/2025
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM Construction elevation certificate has been approved. However, LAG of 7.3' with slab on grade construction is very close to the BFE, recommend raising this elevation.
PLFM INFORMATION 10/08/2025 10/09/2025
Note: Marked INFORMATION By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM Construction elevation certificate has been approved. However, LAG of 7.3' with slab on grade construction is very close to the BFE, recommend raising this elevation.
SW1 HOLD 10/08/2025 10/09/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Grading comments: - Based on the information provided there is 1.1' grade drop adjacent to the foundation. The FD plan shows 20" mono slab which does not agree with proposed elevations on the right side of the home's foundation. Please revise as needed.
BLD COMPLETE 09/29/2025 10/02/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 09/29/2025 10/07/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 09/29/2025 10/02/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/29/2025 09/29/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 09/29/2025 09/29/2025
LOCATE COMPLETE 09/29/2025 10/06/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 09/29/2025 09/30/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 09/29/2025 09/30/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Grading Comments: Please increase FFE to meet the flood zone requirements comments by Jordan.
ZON COMPLETE 09/29/2025 09/29/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
PLFM HOLD 09/29/2025 09/30/2025
Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM Garage and A/C unit do not meet the 1' above Base Flood Elevation, please elevate. Highest adjacent grade and the lanai proposed also do not meet the 1' above BFE, recommend elevating these as well.
SWALE COMPLETE 09/29/2025 10/09/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
WATER- TURN ON ¤50.00 04/10/2026
ADJUSTMENT 10% (¤141.73) 04/10/2026
ADMINISTRATIVE RESIDENTIAL ¤30.00 04/10/2026
INSPECTION - RESIDENTIAL ¤1,080.75 04/10/2026
PLAN REVIEW - RESIDENTIAL ¤306.54 04/10/2026
FC IMPACT FEE EMS ¤62.00 04/10/2026
IMPACT FEE FIRE ¤434.51 04/10/2026
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 04/10/2026
FC IMPACT FEE LIBRARY ¤268.00 04/10/2026
IMPACT FEE PARKS ¤1,828.01 04/10/2026
IMPACT FEE SCHOOL ¤5,450.00 04/10/2026
IMPACT FEE TRANSPORTATION ¤1,916.00 04/10/2026
WASTEWATER MAIN EXTENSION IMPA ¤2,385.00 04/10/2026
SURCHARGE FS 533.721 ¤12.76 04/10/2026
SURCHARGE - FS 468.631 ¤19.13 04/10/2026
SW ENG - FOUNDATION SURVEY ¤20.00 04/10/2026
SW ENG INSPECTION 80 ¤80.00 04/10/2026
SW ENG PRE APRON ¤30.00 04/10/2026
SW ENG - REVIEW 20 ¤20.00 04/10/2026
SW ENG RES REVIEW 200 ¤200.00 04/10/2026
WATER METER W/ TAP ¤2,326.93 04/10/2026
WASTEWATER PERM INSPECTION ¤80.00 04/10/2026
WASTEWATER PERM REVIEW ¤25.00 04/10/2026
SEWER CAPITAL FACILITY ¤4,415.00 04/10/2026
WATER CAPITAL FACILITY FEE ¤3,790.49 04/10/2026
WATER PERMIT REVIEW ¤25.00 04/10/2026
WATER MAIN EXTENSION IMPACT ¤917.27 04/10/2026
SITE PLAN 30 ¤30.00 04/10/2026
Fees Total Due: ¤0.00 Total Paid: ¤25,878.66