I want to search for...
Permit #2025100039
Permit Details
Status: EXPIRED
| Parcel Id: 07-11-31-7023-00240-0300 |
| PATIO/DECK (NO ROOF) : 927 sqft |
| Total Square Footage: 927 sqft |
| Block: 00240 |
| Subdivision: 7023 - |
| Job Phone: 386-225-1722 |
| Location Address: 7 WHITTLESEY LN |
| Type: PO - POOL |
| Issue Date: 10/09/2025 |
| NOC: RECORDED |
| Applicant name: MICHAEL MARINO HANSEN |
| Owner: INTRACOASTAL PROPERTIES V LLC |
|
Address PO BOX 1347 FLAGLER BEACH, FL 32136 |
| Lot: 0300 |
| Contracted Stated Job Value: ¤77,080.00 |
| Job Description: POOL W/FENCE |
| Type: CN |
Contractor
PALM COAST POOLS, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
29 COLUMBUS CT PALM COAST, FL 32137 |
RP252555609 (Exp: 08/31/2027) | 386-225-1722 |
Sub Contractors
BENJAMIN D DEWITT
| Status | Location Address | State License Number | Phone |
| ACTIVE |
356 UNDERWOOD TRAIL PALM COAST, FL 32164 |
ER13016065 (Exp: 08/31/2026) | 321-262-4104 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW- PROJECT STATUS | 02/19/2026 | Status Check | PFLANAGAN |
| Note: GABE, ED AND PARREN MET WITH CONTRACTOR AND THE WILL EXSTENDING THE SWALE ALONG FENCE FROM MIDDLEOF BACK YARD TO THE DRAINAGE PATTERN ON THE LEFT SIDE OF THE LOT AREAS WAS PAINTED AND DISCUSSED THAT WHEN THEY WAS DONE BEFORE SOD TO CONTACT ONE OF US AND WE WILL LOOK AT BEFORE SOD. ALSO THEY WILL NOT NEED TO PUT IN ANOTHER FINAL SURVEY PER GABE. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/23/2026 | Disapproved - NO FEE | TPOLACEK |
| Note: 01-23-26 TPOLACEK*** INSPECTOR WENT OUT IN FIELD AND GRADING DOES NOT MATCH FINAL SURVEY. THERE MUST BE A DRAINAGE CONVEYANCE OF .30 DEEP DIRECTING THE DRAINAGE TO THE FRONT SWALE. DRAINAGE FEATURE SHALL BE A MINIMUM OF 3' WIDE BY .30 DEEP WITH .10 OF FALL EVERY 20'. ONCE REGRADING IS COMPLETED THERE MUST BE A NEW SURVEY SHOT SHOWING CORRECT DRAINAGE PATTERN Met with pool contrctor for grading of the lot and discussed that the will need to grade the lot so it meet city standards. Also the driveway will need to be fixed before permit passes. contractor will need to pull a driveway permit and fix area that is damaged. | |||
| ELECTRIC AND ALARM | 11/26/2025 | APPROVED | MKRASKI |
| ROW- PROJECT STATUS | 11/25/2025 | Status Check | PFLANAGAN |
| Note: Met with pool contrctor for grading of the lot and discussed that the will need to grade the lot so it meet city standards. Also the driveway will need to be fixed before permit passes. contractor will need to pull a driveway permit and fix area that is damaged. ------------------------------------------------------------------------------------------------ MEETING 1030AM | |||
| POOL DECK | 11/10/2025 | APPROVED | MKRASKI |
| STEEL AND GROUND | 10/17/2025 | APPROVED | KSANDOE |
| POOL FINAL | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | |||
| Note: 1/23/2026 - PREVIOUS INSPECTION NOTES 01-23-26 TPOLACEK*** INSPECTOR WENT OUT IN FIELD AND GRADING DOES NOT MATCH FINAL SURVEY. THERE MUST BE A DRAINAGE CONVEYANCE OF .30 DEEP DIRECTING THE DRAINAGE TO THE FRONT SWALE. DRAINAGE FEATURE SHALL BE A MINIMUM OF 3' WIDE BY .30 DEEP WITH .10 OF FALL EVERY 20'. ONCE REGRADING IS COMPLETED THERE MUST BE A NEW SURVEY SHOT SHOWING CORRECT DRAINAGE PATTERN Met with pool contrctor for grading of the lot and discussed that the will need to grade the lot so it meet city standards. Also the driveway will need to be fixed before permit passes. contractor will need to pull a driveway permit and fix area that is damaged. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | |||
| ROW - FINAL INSPECTION | |||
| Note: Met with pool contrctor for grading of the lot and discussed that the will need to grade the lot so it meet city standards. Also the driveway will need to be fixed before permit passes. contractor will need to pull a driveway permit and fix area that is damaged. | |||
| U -UTILITY RESIDENTIAL FINAL |
Review History
| Department | Status | Date In | Date Out |
| RSI | COMPLETE | 10/08/2025 | 10/08/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM ALL DRAINAGE MUST BE UP TO CITY OF PALM COAST STANDARDS | |||
| BLD | COMPLETE | 10/07/2025 | 10/08/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| RSI | HOLD | 10/07/2025 | 10/08/2025 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM DRAINAGE OF THE LOT NEEDS TO BE UP TO CITY STANDARDS | |||
| ZON | COMPLETE | 10/07/2025 | 10/07/2025 |
| Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM | |||
| BFLOOD | CANCEL | 10/02/2025 | 10/07/2025 |
| BLD | HOLD | 10/02/2025 | 10/07/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. Please mark on plans the footer that will be used for the pool deck. 2. Revise pool code section on site plan. It should be 4501.17.1.1 thru 4501.17.1.15 | |||
| ELEC | COMPLETE | 10/02/2025 | 10/06/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/02/2025 | 10/06/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| RSI | COMPLETE | 10/02/2025 | 10/02/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM DRAINAGE MUST MEET ALL CITY STANDARDS AT THE FINAL SURVEY INSPECTION | |||
| ZON | COMPLETE | 10/02/2025 | 10/03/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/09/2025 |
| INSPECTION- POOL | ¤160.00 | 10/09/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤65.00 | 10/09/2025 |
| SURCHARGE FS 533.721 | ¤2.55 | 10/09/2025 |
| SURCHARGE - FS 468.631 | ¤3.83 | 10/09/2025 |
| SW ENG INSPECTION 40 | ¤40.00 | 10/09/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/09/2025 |
| SITE PLAN 30 | ¤30.00 | 10/09/2025 |
| RSI GENERAL INSPECTION 32.50 | ¤32.50 | |
| Fees | Total Due: ¤32.50 | Total Paid: ¤351.38 |