I want to search for...
Permit #2025100100
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-00030-0070 |
| GARAGE: 427 sqft |
| CONDITIONED SPACE: 1609 sqft |
| OPENED PORCH (WITH ROOF) : 21 sqft |
| OPENED PORCH (WITH ROOF) : 36 sqft |
| Total Square Footage: 2093 sqft |
| Block: 00030 |
| Subdivision: - |
| Job Phone: 407-476-8195 |
| Location Address: 12 BURNING TREE PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/05/2025 |
| NOC: RECORDED |
| Applicant name: CARLETTE RENE WITTE |
| Owner: INNOVATIVE NATIONWIDE BUILDERS INC |
|
Address 3670 MAGUIRE BLVD ORLANDO, FL 32803 |
|
Address 220 ORLANDO, FL 32803 |
| Lot: 0070 |
| Contracted Stated Job Value: ¤175,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
INNOVATIVE NATIONWIDE BUILDERS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3670 MAGUIRE BLVD #220 , |
CRC1330026 (Exp: 08/31/2026) | 855-694-6634 |
Sub Contractors
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JASON LEE JAMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N WESTMONTE DR SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
CAC1820196 (Exp: 08/31/2026) | 407-404-4000 |
ANTHONY OKEITH FENNELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N. WESTMONTE DR, SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
EC13011194 (Exp: 08/31/2026) | 407-404-4000 |
Inspection History
| Type | Request Date | Result | Inspector |
| U-CROSS CONNECTION | 06/05/2026 | APPROVED - AS NOTED | TLOWE |
| Note: NO CC / NO IRR | |||
| BLD - BUILDING FINAL | 06/02/2026 | FINAL APPROVED | JSTEWART |
| Note: 5/28/2026 - PREVIOUS INSPECTION NOTES 1. Tug receptacle reuires WR. NEC 406.9 2. Please seal Ufer ground view outlet (cover). FBC EC TABLE R402.4.1.1 3. Please raise AC Pad min 3" above surrounding ground. FBCR M1305.1.4.1 4. No Hot water at fixtures. FBCR P2705.1 – 4 5. Please seal wall penetration at AHU Power. R302.11(4) 6. Please seal garage ceiling at cat5. FBC R302.5.3 7. Please seal garage wall at HW power. FBC R302.5.3 8. Please install weather strip at Garage to House door. FBC R302.5.1 | |||
| BLD - BUILDING FINAL | 05/28/2026 | Disapproved - NO FEE | JSTEWART |
| Note: 1. Tug receptacle reuires WR. NEC 406.9 2. Please seal Ufer ground view outlet (cover). FBC EC TABLE R402.4.1.1 3. Please raise AC Pad min 3" above surrounding ground. FBCR M1305.1.4.1 4. No Hot water at fixtures. FBCR P2705.1 – 4 5. Please seal wall penetration at AHU Power. R302.11(4) 6. Please seal garage ceiling at cat5. FBC R302.5.3 7. Please seal garage wall at HW power. FBC R302.5.3 8. Please install weather strip at Garage to House door. FBC R302.5.1 | |||
| ROW - FINAL INSPECTION | 05/27/2026 | APPROVED | EMADISON |
| Note: ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| U -UTILITY RESIDENTIAL FINAL | 05/22/2026 | APPROVED | TLOWE |
| ROW - FINAL INSPECTION | 05/22/2026 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 05/22/26 BUILDER IS REQUIRED TO HAVE PORT-A-JPOHN REMOVED FROM THE MEDIAN YOU CAN PLACE ON YOUR DRIVEWAY FOR PICK UP. | |||
| ROW - FINAL APRON (AFTER POUR) | 05/22/2026 | APPROVED | EMADISON |
| Note: ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/21/2026 | APPROVED | EMADISON |
| Note: ** Effective 03/25/26, the ROW Field Survey requirement is no longer in effect for Final Lot Grading and Drainage Certificates for new construction on subdivision and infill lots. All Final Lot Grading and Drainage Certificates for these projects will now be reviewed and approved only in the office. Field verification for the ROW-FIELD SURVEY will no longer be required as part of the standard approval process for these permit types. ** PER P. BUCKLEY CHIEF BUILDING Inspector. ** SCHEDULE YOUR FINALS WHEN YOU ARE READY TO DO SO | |||
| ROW- PRE-APRON (PRE-POUR) | 04/29/2026 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. WOOD CONTROL JOINTS ARE PROHIBITED IN THE RIGHT-OF-WAY. SAWCUT SHALL BE PROVIDED AT THE EDGE OF ROW AND EVERY 12' THEREAFTER, OR A MINIMUM OF 2 SAWCUTS WHICHEVER IS GREATER" 4/23/2026 - PREVIOUS INSPECTION NOTES 04-23-26 TPOLACEK*** CULVERT IS NOT SET CENTERED IN DRIVEWAY POUR AREA. THE LEFT SIDE IS 14" FROM EDGE OF DRIVEWAY WHILE THE RIGHT SIDE IS 26" PLEASE SET PIOPE IN ACCORDANCE WITH CODE BELOW. * RESIDENTIAL CONCRETE DRIVEWAY CULVERT DETAIL DRAWING 300. E "CULVERT TO BE CENTERED ON DRIVEWAY. CULVERT SHALL BE CONCRETE ENCASED TO SPRING LINE AND AT LEAST 12"" ON EACH SIDE SEE SECTION B-B. Sec 300.E" | |||
| ROW- PRE-APRON (PRE-POUR) | 04/23/2026 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 04-23-26 TPOLACEK*** CULVERT IS NOT SET CENTERED IN DRIVEWAY POUR AREA. THE LEFT SIDE IS 14" FROM EDGE OF DRIVEWAY WHILE THE RIGHT SIDE IS 26" PLEASE SET PIOPE IN ACCORDANCE WITH CODE BELOW. * RESIDENTIAL CONCRETE DRIVEWAY CULVERT DETAIL DRAWING 300. E "CULVERT TO BE CENTERED ON DRIVEWAY. CULVERT SHALL BE CONCRETE ENCASED TO SPRING LINE AND AT LEAST 12"" ON EACH SIDE SEE SECTION B-B. Sec 300.E" | |||
| ELECTRIC - EARLY POWER | 03/27/2026 | APPROVED | HCAMACHO |
| Note: 3/26/2026 - PREVIOUS INSPECTION NOTES 240v wiring for Hot water tank needs to be encased in a holding box with a cover for accidental touch. NEC 110.27 Inspector Notes from Inspection 2200 2-17-26 1. Emailed FPL at 9:47. | |||
| ELECTRIC - EARLY POWER | 03/26/2026 | Disapproved - NO FEE | JSTEWART |
| Note: 240v wiring for Hot water tank needs to be encased in a holding box with a cover for accidental touch. NEC 110.27 Inspector Notes from Inspection 2200 2-17-26 1. Emailed FPL at 9:47. | |||
| GRAVITY SEWER TEST | 03/24/2026 | APPROVED | KSANDOE |
| SEWER TIE IN | 03/24/2026 | APPROVED | KSANDOE |
| PEP TANK INSTALLATION REQUEST | 03/09/2026 | APPROVED | ISANDERSON |
| INSULATION | 03/04/2026 | APPROVED | CVANSTRAHLEN |
| Note: 3/3/2026 - PREVIOUS INSPECTION NOTES 1. Missing foil insulation on the bedroom on the right side around the window. 2/23/2026 - PREVIOUS INSPECTION NOTES | |||
| INSULATION | 03/03/2026 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. Missing foil insulation on the bedroom on the right side around the window. 2/23/2026 - PREVIOUS INSPECTION NOTES | |||
| INSULATION | 02/23/2026 | CANCELLED BY APPLICANT | KSANDOE |
| LATH/BRICK/ WATER BARRIER | 02/20/2026 | APPROVED | KSANDOE |
| Note: 2/12/2026 - PREVIOUS INSPECTION NOTES 2/12/26 1. Front entry door needs to be sealed with approved material before placing lath and trim around it FBCR 402.4.1.1 | |||
| ALL ROUGH | 02/17/2026 | APPROVED | BTAYLOR |
| ELECTRIC-TUG | 02/17/2026 | APPROVED - AS NOTED | BTAYLOR |
| Note: 2-17-26 1. Emailed FPL at 9:47. | |||
| LATH/BRICK/ WATER BARRIER | 02/12/2026 | Disapproved - NO FEE | MCONTRYMAN |
| Note: 2/12/26 1. Front entry door needs to be sealed with approved material before placing lath and trim around it FBCR 402.4.1.1 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/05/2026 | APPROVED | JSTEWART |
| ROOF VALLEY & METAL | 02/03/2026 | APPROVED | JSTEWART |
| ROOF SHEATHING | 01/28/2026 | APPROVED | JSTEWART |
| WALL SHEATHING | 01/28/2026 | APPROVED | JSTEWART |
| TIE BEAM / LINTEL | 01/21/2026 | APPROVED | MCONTRYMAN |
| MONOLITHIC SLAB | 01/12/2026 | APPROVED | JSTEWART |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/07/2026 | APPROVED | MCONTRYMAN |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 01/06/2026 | APPROVED | RRICKS |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 01/06/2026 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 12/08/2025 | APPROVED | CBOWERMASTER |
| Note: 11/20/2025 8:33:21 AM- PREVIOUS INSPECTION NOTES logs on left side of property | |||
| WATER METER INSTALLATION REQUEST | 11/19/2025 | Disapproved -FEE REQUIRED | CBOWERMASTER |
| Note: logs on left side of property |
Review History
| Department | Status | Date In | Date Out |
| BLD | HOLD | 01/06/2026 | 01/06/2026 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Please provide Final building pad certification letter. | |||
| BLD | COMPLETE | 01/06/2026 | 01/06/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/06/2026 | 01/06/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/06/2026 | 01/06/2026 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/05/2025 | 11/06/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/10/2025 | 10/15/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/06/2025 | 10/08/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 10/06/2025 | 10/10/2025 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 10/06/2025 | 10/09/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/06/2025 | 10/06/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 10/06/2025 | 10/07/2025 |
| LOCATE | COMPLETE | 10/06/2025 | 10/09/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 10/06/2025 | 10/07/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Direction house faces on Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2023 8Th Edition | |||
| SW1 | COMPLETE | 10/06/2025 | 10/06/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/06/2025 | 10/07/2025 |
| Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 10/06/2025 | 10/27/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| RSI REINSPECTION 1 | ¤35.00 | 05/26/2026 |
| RSI REINSPECTION 1 | ¤35.00 | 05/21/2026 |
| REINSPECTION FEE | ¤40.00 | 04/10/2026 |
| PLAN REVIEW - REVISION | ¤32.50 | 04/10/2026 |
| CONTRACTOR CHANGE | ¤20.00 | 04/10/2026 |
| CONTRACTOR CHANGE | ¤20.00 | 04/10/2026 |
| FC IMPACT FEE EMS | ¤62.00 | 11/05/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 11/05/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 11/05/2025 |
| FIRE RES IMPACT FEE 10-25 | ¤942.00 | 11/05/2025 |
| PEP TANK INSTALL | ¤756.74 | 11/05/2025 |
| PARKS IMPACT FEE 10-25 | ¤3,164.00 | 11/05/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 11/05/2025 |
| WATER- TURN ON | ¤50.00 | 11/05/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/05/2025 |
| INSPECTION - RESIDENTIAL | ¤849.75 | 11/05/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤241.02 | 11/05/2025 |
| SCHOOL BOARD IMPACT FEE RES | ¤5,450.00 | 11/05/2025 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,385.00 | 11/05/2025 |
| SURCHARGE FS 533.721 | ¤11.21 | 11/05/2025 |
| SURCHARGE - FS 468.631 | ¤16.81 | 11/05/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 11/05/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 11/05/2025 |
| SW ENG PRE APRON | ¤30.00 | 11/05/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 11/05/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 11/05/2025 |
| WATER METER W/ TAP | ¤2,326.93 | 11/05/2025 |
| TRANSP RES IMPACT FEE 10-25 | ¤6,065.93 | 11/05/2025 |
| SEWER CREDIT | (¤850.00) | 11/05/2025 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 11/05/2025 |
| WASTEWATER PERM REVIEW | ¤25.00 | 11/05/2025 |
| SEWER CAPITAL FACILITY | ¤4,415.00 | 11/05/2025 |
| WATER CAPITAL FACILITY FEE | ¤3,790.49 | 11/05/2025 |
| WATER PERMIT REVIEW | ¤25.00 | 11/05/2025 |
| WATER MAIN EXTENSION IMPACT | ¤917.27 | 11/05/2025 |
| SITE PLAN 30 | ¤30.00 | 11/05/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤31,822.65 |