Permit #2025100239

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7004-00160-0060
Block: 00160
Subdivision: 7004 -
Job Phone: 386-872-8025
Location Address: 69 CORAL REEF CT N
Type: SW - SEAWALL
Issue Date: 10/13/2025
NOC: RECORDED
Applicant name: STEPHEN SEAN LAWRENCE
Owner: GILMANSHIN MARSEL

Address

51 PINE CIRCLE DRIVE

PALM COAST, FL 32164

Lot: 0060
Contracted Stated Job Value: ¤20,000.00
Job Description: SEAWALL
Type: CN

Contractor

ACANTHUS CONSTRUCTION LLC
Status Location Address State License Number Phone
ACTIVE

54 BURNELL DRIVE

PALM COAST, FL 32137

CGC1535903 (Exp: 08/31/2026) 386-318-1125

Inspection History

Type Request Date Result Inspector
SEAWALL FINAL 05/26/2026 FINAL APPROVED MCONTRYMAN
ROW - STORMWATER FINAL 05/21/2026 CANCELLED BY APPLICANT WEB
ROW - STORMWATER FINAL 05/21/2026 APPROVED - AS NOTED GBERTOLA
Note: At the time of the inspection, everything was compliant with the city standards.
ROW - FINAL INSPECTION 05/21/2026 CANCELLED BY APPLICANT WEB
ROW - FINAL INSPECTION 05/21/2026 APPROVED - AS NOTED GBERTOLA
Note: At the time of the inspection, everything was compliant with the city standards. At the time of the inspection, everything was in compliance with the city standards.
ROW - DRAINAGE 05/18/2026 Disapproved -FEE REQUIRED TPOLACEK
Note: INSPECTOR STOPPED ON SITE WHILE CREW WAS IN CANAL WORKING. INSPECTOR WENT TO SEE IF THEY WERE INSTALLING THE TURBIDITY BARRIER AND FOUND EMPLOYEE WAS REMOVING BARRIER TO INSTALL ON ANOTHER SITE. DUE TO THE RAIN EVENT AND WASHOUT INTO CANAL THIS INSPECTION IS BEING RESULTED TODAY. BUILDER NOW HAS A STOP WORK ORDER PLACED ON SITE BUT MUST INSTALL THE TURBIDITY BARRIER AS WELL AS A DOUBLE ROW OF SILT FENCE 5' APART INSTALLED TO MANUFACTURERS SPECS AND REMOVE ALL SEDIMENT WASHED INTO CANAL. BACK SLOPE SHOULD BE STABILIZED WITH SOD AS WELL. THERE ARE NO PERMITS FOR ANY OTHER WORK ON THIS SITE THEREFOR SITE MUST BE KEPT CLEAR OF ALL DELETERIOUS MATERIAL. 4 9.04.06. Erosion and sediment control. LDC DEC.9.04.06 LDC DEC.9.04.06.Any sedimentation leaving the site or impacting adjacent areas shall be halted immediately and the adjacent areas restored to pre-existing conditions. 5/11/2026 - PREVIOUS INSPECTION NOTES The turbidity barrier must remain inplace throughout the entire process. Builder has 5 days to reset the barrier and stabilize the back slope with silt fence to prevent washout into canal.
ROW - DRAINAGE 05/18/2026 Disapproved -FEE REQUIRED TPOLACEK
Note: 05-18-26 TPOLACEK*** SEE PREVIOUS NOTES AND UPDATED PHOTOS 5/15/2026 - PREVIOUS INSPECTION NOTES 05-15-26 TPOLACEK*** THERE IS STILL NO TURBIDITY BARRIER IN PLACE, THERE IS ONLY ONE COURSE OF SILT FENCE ( PREVIOUS INSPECTION STATED THERE MUST BE 2 COURSES 5' APART) INSPECTIONS WILL BE DAILY UNTIL CORRECTIONS ARE MADE. 5/14/2026 - PREVIOUS INSPECTION NOTES INSPECTOR STOPPED ON SITE WHILE CREW WAS IN CANAL WORKING. INSPECTOR WENT TO SEE IF THEY WERE INSTALLING THE TURBIDITY BARRIER AND FOUND EMPLOYEE WAS REMOVING BARRIER TO INSTALL ON ANOTHER SITE. DUE TO THE RAIN EVENT AND WASHOUT INTO CANAL THIS INSPECTION IS BEING RESULTED TODAY. BUILDER NOW HAS A STOP WORK ORDER PLACED ON SITE BUT MUST INSTALL THE TURBIDITY BARRIER AS WELL AS A DOUBLE ROW OF SILT FENCE 5' APART INSTALLED TO MANUFACTURERS SPECS AND REMOVE ALL SEDIMENT WASHED INTO CANAL. BACK SLOPE SHOULD BE STABILIZED WITH SOD AS WELL. THERE ARE NO PERMITS FOR ANY OTHER WORK ON THIS SITE THEREFOR SITE MUST BE KEPT CLEAR OF ALL DELETERIOUS MATERIAL. 4 9.04.06. Erosion and sediment control. LDC DEC.9.04.06 LDC DEC.9.04.06.Any sedimentation leaving the site or impacting adjacent areas shall be halted immediately and the adjacent areas restored to pre-existing conditions. 5/11/2026 - PREVIOUS INSPECTION NOTES The turbidity barrier must remain inplace throughout the entire process. Builder has 5 days to reset the barrier and stabilize the back slope with silt fence to prevent washout into canal.
ROW - DRAINAGE 05/15/2026 Disapproved -FEE REQUIRED TPOLACEK
Note: 05-15-26 TPOLACEK*** THERE IS STILL NO TURBIDITY BARRIER IN PLACE, THERE IS ONLY ONE COURSE OF SILT FENCE ( PREVIOUS INSPECTION STATED THERE MUST BE 2 COURSES 5' APART) INSPECTIONS WILL BE DAILY UNTIL CORRECTIONS ARE MADE. 5/14/2026 - PREVIOUS INSPECTION NOTES INSPECTOR STOPPED ON SITE WHILE CREW WAS IN CANAL WORKING. INSPECTOR WENT TO SEE IF THEY WERE INSTALLING THE TURBIDITY BARRIER AND FOUND EMPLOYEE WAS REMOVING BARRIER TO INSTALL ON ANOTHER SITE. DUE TO THE RAIN EVENT AND WASHOUT INTO CANAL THIS INSPECTION IS BEING RESULTED TODAY. BUILDER NOW HAS A STOP WORK ORDER PLACED ON SITE BUT MUST INSTALL THE TURBIDITY BARRIER AS WELL AS A DOUBLE ROW OF SILT FENCE 5' APART INSTALLED TO MANUFACTURERS SPECS AND REMOVE ALL SEDIMENT WASHED INTO CANAL. BACK SLOPE SHOULD BE STABILIZED WITH SOD AS WELL. THERE ARE NO PERMITS FOR ANY OTHER WORK ON THIS SITE THEREFOR SITE MUST BE KEPT CLEAR OF ALL DELETERIOUS MATERIAL. 4 9.04.06. Erosion and sediment control. LDC DEC.9.04.06 LDC DEC.9.04.06.Any sedimentation leaving the site or impacting adjacent areas shall be halted immediately and the adjacent areas restored to pre-existing conditions. 5/11/2026 - PREVIOUS INSPECTION NOTES The turbidity barrier must remain inplace throughout the entire process. Builder has 5 days to reset the barrier and stabilize the back slope with silt fence to prevent washout into canal.
ROW - DRAINAGE 05/11/2026 Disapproved - NO FEE TPOLACEK
Note: The turbidity barrier must remain inplace throughout the entire process. Builder has 5 days to reset the barrier and stabilize the back slope with silt fence to prevent washout into canal.
ROW - FINAL INSPECTION 02/09/2026 CANCELLED BY APPLICANT WEB
ROW - STORMWATER FINAL 02/09/2026 CANCELLED BY APPLICANT WEB
SEAWALL DEADMAN CAP 01/22/2026 APPROVED HCAMACHO
ROW -TURBIDITY BARRER 11/26/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 11/19/2025 - PREVIOUS INSPECTION NOTES 11-19-25 TPOLACEK*** TURBIDITY BARRIER MUST BE SECURED ON BOTH ENDS AND NOT HAVE GAPS. LEFT SIDE IS JUST LAYING ON SHORE LINE WITHOUT BEING SECURED.
ROW -TURBIDITY BARRER 11/19/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 11-19-25 TPOLACEK*** TURBIDITY BARRIER MUST BE SECURED ON BOTH ENDS AND NOT HAVE GAPS. LEFT SIDE IS JUST LAYING ON SHORE LINE WITHOUT BEING SECURED.

Review History

Department Status Date In Date Out
BLD COMPLETE 10/08/2025 10/09/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/08/2025 10/09/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 10/08/2025 10/08/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BFLOOD CANCEL 10/08/2025 10/08/2025

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
RSI REINSPECTION 1 ¤35.00 05/22/2026
RSI REINSPECTION 1 ¤35.00 05/22/2026
RSI REINSPECTION 1 ¤35.00 05/22/2026
RSI REINSPECTION 1 ¤35.00 05/22/2026
RSI REINSPECTION 1 ¤35.00 05/22/2026
RSI REINSPECTION 1 ¤35.00 11/25/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 10/13/2025
INSPECTION - RESIDENTIAL ¤60.00 10/13/2025
PLAN REVIEW - MISC 32.50 ¤32.50 10/13/2025
RSI ROW FINAL INSPECTION ¤16.25 10/13/2025
RSI ROW STORMWATER FINAL INSP ¤32.50 10/13/2025
SURCHARGE FS 533.721 ¤2.00 10/13/2025
SURCHARGE - FS 468.631 ¤2.00 10/13/2025
SITE PLAN 15 ¤15.00 10/13/2025
Fees Total Due: ¤0.00 Total Paid: ¤400.25