Permit #2025100302

Permit Details

Status: COED

Parcel Id: 07-11-31-7001-000B0-0020
COMMERCIAL SQUARE FOOTAGE: 3883 sqft
Total Square Footage: 3883 sqft
Block: 000B0
Subdivision: 1238 - PALM HARBOR CENTER REPLAT
Job Phone: 856-776-3930
Location Address: 24 OLD KINGS RD N
Type: CIA - COMMERCIAL INTERIOR EXTERIOR ALTERATION
Issue Date: 12/24/2025
NOC: RECORDED
Applicant name: NEFTALI DEJESUS III
Owner: MANDEVILLE MANOR HEALTH SYSTEMS INC

Address

40 PONCE DELEON DRIVE

PALM COAST, FL 32164

Lot: 0020
Contracted Stated Job Value: ¤163,000.00
Job Description: BLDG 1 REMODEL INTERIOR NEW GYM EXERCISE AREA
Type: CN

Contractor

1621 BUILDING AND REMODELING LLC
Status Location Address State License Number Phone
ACTIVE

389 PALM COAST PARKWAY SW UNIT 3-N

PALM COAST, FL 32137

CGC1534626 (Exp: 08/31/2026) 386-597-5984

Sub Contractors

ROBERT CARLTON LITTLE
Status Location Address State License Number Phone
ACTIVE

3050 EAST MOODY BLVD

BUNNELL, FL 32110

EC13003740 (Exp: 08/31/2026) 386-931-1708
JOHN CHARLES GRAY
Status Location Address State License Number Phone Fax
ACTIVE

2707 ANNETTE STREET

FLAGLER BEACH, FL 32136

CFC1425975 (Exp: 08/31/2026) (386)793-3690 (386)439-7585
JAMES LEE RANKIN JR
Status Location Address State License Number Phone
INACTIVE

320 3RD ST SW

, 0

CAC18232102 (Exp: 08/31/2026) 863-712-2777

Inspection History

Type Request Date Result Inspector
PLUMBING FINAL 02/12/2026 Approval - Private Provider PPROVIDER
Note: 2/10/2026 11:04:35 AM- PREVIOUS INSPECTION NOTES
FIRE FINAL 02/12/2026 APPROVED JMUNSON
Note: 2/11/2026 - PREVIOUS INSPECTION NOTES 2/9/2026 - PREVIOUS INSPECTION NOTES All inspections need to be completed.
U - UTILITY COMMERCIAL FINAL 02/11/2026 FINAL APPROVED LFITZGERALD
Note: 2/9/2026 - PREVIOUS INSPECTION NOTES
FIRE FINAL 02/11/2026 Disapproved - NO FEE JMUNSON
Note: 2/9/2026 - PREVIOUS INSPECTION NOTES All inspections need to be completed.
PLUMBING FINAL 02/10/2026 Disapproved- Private Provider PPROVIDER
FIRE FINAL 02/09/2026 CANCELLED BY APPLICANT RMARTIN
U - UTILITY COMMERCIAL FINAL 02/09/2026 CANCELLED BY APPLICANT LFITZGERALD
U - UTILITY COMMERCIAL FINAL 02/06/2026 CANCELLED BY APPLICANT WEB
FIRE FINAL 02/06/2026 CANCELLED BY APPLICANT WEB
BUILDING FINAL 02/05/2026 Approval - Private Provider PPROVIDER
ELECTRIC FINAL 02/05/2026 Approval - Private Provider PPROVIDER
FIREWALL FINAL 02/05/2026 Approval - Private Provider PPROVIDER
FIREWALL PENETRATIONS 01/20/2026 Approval - Private Provider PPROVIDER
FIREWALL DRYWALL NAILING 01/20/2026 Approval - Private Provider PPROVIDER
DRYWALL NAILING 01/20/2026 Approval - Private Provider PPROVIDER
HVAC FINAL 01/14/2026 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH 01/08/2026 Approval - Private Provider PPROVIDER
Note: 1/6/2026 3:47:47 PM- PREVIOUS INSPECTION NOTES
PLUMBING 2ND ROUGH 01/08/2026 Approval - Private Provider PPROVIDER
Note: 1/6/2026 3:46:52 PM- PREVIOUS INSPECTION NOTES
PLUMBING 1ST ROUGH 01/06/2026 CANCELLED BY APPLICANT PPROVIDER
PLUMBING 2ND ROUGH 01/06/2026 CANCELLED BY APPLICANT PPROVIDER
FRAMING 01/06/2026 Approval - Private Provider PPROVIDER
FIREWALL FRAMING 01/06/2026 Approval - Private Provider PPROVIDER
ABOVE CEILING 12/31/2025 Approval - Private Provider PPROVIDER
ELECTRIC 2ND ROUGH 12/31/2025 Approval - Private Provider PPROVIDER
HVAC ROUGH 12/31/2025 Approval - Private Provider PPROVIDER

Review History

Department Status Date In Date Out
MECH COMPLETE 02/03/2026 02/10/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 02/02/2026 02/03/2026
Note: Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM
MECH HOLD 01/13/2026 01/22/2026
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Return air missing on plans in room 104 and 108 FBC Mechanical 601.6 2. Return air shown on plans in shower room 118. Is this a mistake? 3. Missing fresh air duct for Gym area on plans. FBC Mechanical 403.3.1.1.1 4. Existing fresh air duct for office area shows 8 inch. This does not carry the required amount of air (457 CFM) FBC Mechanical/ ASHRAE standards 5. Provide updated heat load and AHRI document for mini split. (not on the original plans)
PLUM COMPLETE 01/13/2026 01/22/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 01/13/2026 01/22/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
PLUM COMPLETE 12/22/2025 12/22/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 12/12/2025 12/16/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
PLUM HOLD 12/12/2025 12/18/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM NO LETTER SUBMITTED FOR PLUMBING REPEAT COMMENT: 8. Provide accessibility details for washer and dryer, show clear floor space, approach, operable parts and height. 611.1-611.4 FBC Accessibility REPEAT COMMENT: 10. Plans show a lavatory in a closet. Is that your service sink. Provide location of required service sink 403.1 FBC Plumbing
BLD COMPLETE 12/12/2025 12/18/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ELEC COMPLETE 12/12/2025 12/15/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
FI1 COMPLETE 12/12/2025 12/15/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
PLUM HOLD 12/12/2025 12/18/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM THIS IS THE CORRECT REVIEW. I FOUND COMMENT #8 ON ANOTHE PAGE. NO LETTER SUBMITTED FOR PLUMBING REPEAT COMMENT: 10. Plans show a lavatory in a closet. Is that your service sink. Provide location of required service sink 403.1 FBC Plumbing
MECH HOLD 11/24/2025 12/01/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM COMMENTS BELOW PER THE 2023 FLORIDA BUILDING CODE-BUILDING (FBCB), FLORIDA BUILDING CODE-EXISTING BUILDING (FBCEB), FLORIDA BUILDING CODE- MECHANICAL (FBCM), FLORIDA BUILDING CODE-ENERGY CONSERVATION (FBCEC), FLORIDA STATUTES (FS), FLORIDA ADMINISTRATIVE CODE (FAC) AND AUTHORITY HAVING JURISDICTION (AHJ). PLAN RE-SUBMITTAL SHALL BE ACCOMPANIED BY A RESPONSE LETTER SIGNED AND SEALED BY THE APPROPRIATE DESIGN PROFESSIONAL(S). ALL PLAN REVISIONS SHALL BE CLOUDED APPROPRIATELY. THIS IS A CHANGE IN OCCUPANCY. YOU WILL NOT BE ABLE TO USE THE OLD EQUIPMENT. *NO ENGINEERED LETTER SUBMITTED* REPEAT COMMENT 1. Provide Energy Calculations removing note about SEER2 conversion. The equipment needs to be seer2 rated by AHRI. C407 FBC Energy Conservation REPEAT COMMENT: 2. Provide Ventilation calculation for entire building per Table 403.3.1.1 FBC Mechanical REPEAT COMMENT: 3. Plans show 2684sqft for gym area. Fresh air calculation says 2484 sqft. Revise calculation. 107.2.1 4. OK 5. OK REPEAT COMMENT: 6. Provide equipment schedule and details per FBC Energy Conservation 2023 REPEAT COMMENT: 7. AHRI submitted is for 9000 btu minisplit. Provide location on plans. 107.2.1 REPEAT COMENT: 8. Provide details and manufacturers specs on sauna and sauna equipment. 107.2.1 REPEAT COMMENT: 9. Provide manufacturers specs on range in break room. 107.2.1 10. OK
PLUM HOLD 11/24/2025 12/01/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM COMMENTS BELOW PER THE 2023 FLORIDA BUILDING CODE-BUILDING (FBCB), FLORIDA BUILDING CODE-PLUMBING (FBCP), FLORIDA BUILDING CODE-ACCESSIBILITY (FBCA), FLORIDA STATUTES (F.S.), FLORIDA ADMINISTRATIVE CODE (F.A.C.) AND AUTHORITY HAVING JURISDICTION (A.H.J.). PLAN RE-SUBMITTAL SHALL BE ACCOMPANIED BY A RESPONSE LETTER SIGNED AND SEALED BY THE APPROPRIATE DESIGN PROFESSIONAL(S). ALL PLAN REVISIONS SHALL BE CLOUDED APPROPRIATELY. *NO LETTER SUBMITTED* 1. OK 2. OK REPEAT COMMENT: 3. Revise finish schedule to show toilet rooms, bathrooms and service sink areas in accordance with Section 1210 FBC Building. Epoxy paint not allowed. 4. OK REPEAT COMMENT: 5. Provide dimensions of showers and clearances showing compliance with 608, 608.2 FBC Accessibility REPEAT COMMENT: 6. Provide grab bar details and location for showers 608.3 FBC Accessibility REPEAT COMMENT: 7. Provide location and height of controls for shower 608.5 FBC Accessibility REPEAT COMMENT: 8. Provide accessibility details for washer and dryer, show clear floor space, approach, operable parts and height. 611.1-611.4 FBC Accessibility REPEAT COMMENT: 9. Provide accssibility details for sauna 612.1, bench details 612.2, 903, 903.2 and turning space 612.3, 304 FBC Accessibility REPEAT COMMENT: 10. Plans show a lavatory in a closet. Is that your service sink. Provide location of required service sink 403.1 FBC Plumbing NEW COMMENT: All plan pages need to have a verifiable digital signature. These appear to be copy
ELEC HOLD 11/24/2025 12/04/2025
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need more information about the sauna. More comments may come for this item. You should look at NEC 2020 424 2. Need more information for the equipment in the cryo room. 3. Need to have correct outlet spacing in conference room. NEC 2020 210.65
FI1 HOLD 11/24/2025 12/04/2025
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Place note on cover sheet that Fire Sprinkler and Fire Alarm will be on separate. 2. Ok 3. Show the rating of the wall separating the two different occupancy. NFPA 101 ch 39.1.3 and table 6.1.14.4.1
BLD HOLD 11/24/2025 12/03/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM *NO RESPONSE LETTER SUBMITTED* General 1. OK Plan Sheet 1-12 1. OK PARTIAL REPEAT COMMENT: 2. In the Construction Table, add the allowable area and actual area for the A Occupancy, based on VB Construction Type and fully sprinkled, one-story building. 506, TABLE 506.2.(SHOW ALLOWABLE AREA) PARTIAL REPEAT COMMENT: 3. In the Construction Table, add the allowable area and actual area for the B Occupancy, based on VB Construction Type and fully sprinkled, one-story building. 506, TABLE 506.2. (SHOW ALLOWABLE AREA) 4. OK 5. OK 6. OK 7. OK NEW COMMENT: 8. Change A3 occupant load to 50 gross not 150 Plan Sheet 4-12 REPEAT COMMENT: 1. Identify location of fire-resistive rated wall between the gym workout area (Group A-3 occupancy) and the office area (Group B occupancy). Identify wall type and required fire-resistive rating. 508.4, Table 508.4, 508.4.4.1, 707. PARTIAL REPEAT COMMENT: 2. Show minimum maneuverability clearances on both the push and pull sides of swinging doors including exterior side of exterior doors. Several door types do not provide sufficient clearances beyond latch sides on both push and pull sides of doors based on direction of approach. Maneuverability clearances are per FBCA Section 404.2.4.1 and Table 404.2.4.1. (SHOW DIMENSIONS ON FLOOR PLAN NOT JUST A DETAIL ON PLANS) 3. OK 4. OK 5. OK REPEAT COMMENT: 6. Provide required maneuverability clearances outside of shower and inside of shower based on shower type. FBCA 608.2.1, 608.2.2, 608.2.3. 7. OK 8. OK 9. OK REPEAT COMMENT: 10. Show dimensions of benches outside showers. FBCA 903. 11. OK 12. OK 13. OK 14. OK 15. OK 16. OK PARTIAL REPEAT COMMENT: 17. Provide accessibility details of sauna including the sauna equipment. If there are benches, changing areas, storage lockers, coat hooks, etc. in the room, show locations. Provide manufacturer’s specifications of sauna indicating it is accessible to persons with disabilities. FBCA CHAPTER 2, 8, 9.( NO MANUFACTURER SPECS SUBMITTED) PARTIAL REPEAT COMMENT: 18. Provide accessibility details of cryo room including cryo equipment. If there are benches, changing areas, storage lockers, coat hooks, etc. in the room, show locations. Provide manufacturer’s specifications of cryo unit indicating it is accessible to persons with disabilities. FBCA CHAPTER 2, 8, 9. ( NO MANUFACTURER SPECS SUBMITTED) 19. OK REPEAT COMMENT: 20. Provide accessibility details of red light room. Please explain what the purpose and use of this room actually is. If there are benches, changing areas, storage lockers, coat hooks, etc. in the room, show locations. If the red light room contains some type of manufactured equipment, provide manufacturer’s specifications indicting equipment is accessible to persons with disabilities. FBCA CHAPTER 2, 8, 9.(ONE PLAN SHEET SHOWS CRYO ROOM AND ANOTHER SHOWS REDLIGHT ROOM. WHICH IS IT? REVISE) 21. OK REPEAT COMMENT: 22. Provide accessibility details for break room. The 3 bay sink, range and a portion of food surface prep counter top must be accessible to persons with disabilities. There are certain direction of approach for the range and sink and reach ranges for operable controls. What do the dashed lines represent? Please indicate. FBCA 308, 902 REPEAT COMMENT: 23. Provide elevation views for accessible bathrooms, accessible shower compartments, accessible countertops, accessible lavatories, accessible spaces such as lockers, coat hooks, other accessible equipment and facilities in other accessible rooms and spaces. Show reach ranges, clearances, mounting heights of all grab bars, equipment, etc. Show knee and toe clearances to provide a complete accessibility design for various accessible features. FBCA CHAPTER 2, 3, 4, 6, AND 8. AHJ. (ONLY BATHROOMS SHOWN) 24. OK 25. OK 26. OK Plan Sheet 6-12 1. OK Plan Sheet 7-12 1. OK Plan Sheet 10-12 1. OK 2. OK Plan Sheet 11-12 1. OK Plan Sheet 12-12 REPEAT COMMENT: 2. Revise Room Finish Schedule for Room 115 – Unisex Restroom 2 and Room 117 – Unisex Bathroom 1 to include required finishes for floors, required base board and wall finishes adjacent to toilets. This section requires “hard, non-absorbent floor and wall finishes near toilets. Hard, non-absorbent means concrete, tile and similar. Painted gypsum drywall including epoxy paint gypsum drywall is not accepted. 1210.2.1,1210.2.3 REPEAT COMMENT: 3. Revise Room finish Schedule for Room 116 – Shower Room 1 and Room 118 – Shower Room 2 including required finishes for floors, required bae board and wall finishes. You need to declare the type of shower construction and whether you are using pre-manufactured shower enclosures or panel type or ceramic tile finishes. If using pre-manufactured enclosures, provide minimum gypsum backing that conforms to. If using panels or ceramic tile. 1210.2.3, 1210.2.4, 2509.1, 2509.2. 4. OK REPEAT COMMENT: 5. Revise Detail 2/A3. Provide reference to UL 263 or ASTM E119 fire barrier. Include complete UL or ASTM file details for complete construction of fire barrier. AHJ, FBCB 107.2, 107.3.5,703.2, 703.2.1, 703.2.1.1, 703.2.1.2, 703.2.2 REPEAT COMMENT: 6. Revise door schedule to include required fire rating and door closure specifications for doors in fire barrier wall separating the A-3 occupancy from the B occupancy. 716. NEW COMMENT: 1. Room finish schedule shows compession area and red light room. Plans show a wailting room and some show redlight and others say cryo room. Revise room finish schedule and plans to match.107.2.1 2. Plan pages have a note that says doors on plan page 12/12. There is no 12/12. Revise to show correct page number. 107.2.1 3. Plan pages need to have a verifiable digital signature. F.S. 471.025
BADMIN INFORMATION 10/31/2025 10/31/2025
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM A completed permit application signed by the contractor is required for submittal. Manual applications can be found on our website under documents and information on the main page. (permitting documents)
UD2 COMPLETE 10/15/2025 10/15/2025
Note: Released By: DAN LEMONCELLO - - 1) Spoke with contractor Bill Ordway, Outback Construction. No grease trap needed. No commercial kitchen. There is a preexisting sink and stove only used for employee's meals. Won't be selling any products for profit. I am ok with no grease trap for the information provided.
BLD HOLD 10/09/2025 10/28/2025
Note: Held By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM COMMENTS BELOW PER THE 2023 FLORIDA BUILDING CODE-BUILDING (FBCB), FLORIDA BUILDING CODE-ACCESSIBILITY (FBCA), FLORIDA STATUTES (FS), FLORDA ADMINISTRATIVE CODE (FAC) AND AUTHORITY HAVING JURISDICTION (AHJ). General 1. Plan Sheet 11-12 is missing from uploaded plans. Please provide. AHJ. Plan Sheet 1-12 1. In the Construction Table, change type of construction to VB – Original tenant improvement plans and shell building plans classify this building as Type VB. 602, Table 601 2. In the Construction Table, add the allowable area and actual area for the A Occupancy, based on VB Construction Type and fully sprinkled, one-story building. 506, TABLE 506.2. 3. In the Construction Table, add the allowable area and actual area for the B Occupancy, based on VB Construction Type and fully sprinkled, one-story building. 506, TABLE 506.2. 4. In the Construction Table, provide building risk category 1604.5, Table 1604.5 5. In the Project Characteristics Table for the B Occupancy. change Construction Type to VB. 602, Table 601 6. In the Project Characteristics Table for the A Occupancy, change occupancy category from “A” to “A-3”. 303.4. 7. In the Project Characteristics Table for the A Occupancy, change Construction Type to VB. 602, Table 601. 8. In the Change of Occupancy Table, revise the Occupant Load Factor for the B occupancy to 150 square feet per person. Add the word “gross”.1004.1, Table 1004.1 Plan Sheet 4-12 1. Identify location of fire-resistive rated wall between the gym workout area (Group A-3 occupancy) and the office area (Group B occupancy). Identify wall type and required fire-resistive rating. 508.4, Table 508.4, 508.4.4.1, 707. 2. Show minimum maneuverability clearances on both the push and pull sides of swinging doors including exterior side of exterior doors. Several door types do not provide sufficient clearances beyond latch sides on both push and pull sides of doors based on direction of approach. Maneuverability clearances are per FBCA Section 404.2.4.1 and Table 404.2.4.1. 3. Remove stairs from plan sheet. Owner has indicated no second floor and no mezzanine. AHJ. 4. Provide dimensions of showers and square inches of each shower. FBCA 608.2. 5. Indicate whether showers are roll-in type or transfer type. FBCA 608.2.1, 608.2.2 6. Provide required maneuverability clearances outside of shower and inside of shower based on shower type. FBCA 608.2.1, 608.2.2, 608.2.3. 7. Show shower grab bars. FBCA 608.3 8. If transfer type showers, show location of folding shower seat. FBCA 608.4 9. Show location of shower controls. FBCA 608.5. 10. Show dimensions of benches outside showers. FBCA 903. 11. Provide maneuverability clearances at drinking fountain. FBCA 602. 12. Revise plans to show that both bathrooms are accessible. This is a change of occupancy. All required bathrooms and bathroom fixtures must be accessible to persons with disabilities. FBCA CHAPTER 2 AND 6. 13. Provide dimension of maneuverability circle in each bathroom. FBCA 304, 603 14. Provide required dimensions in front of accessible water closets. FBCA 604.3 15. Provide dimensions in front of accessible lavatories. FBCA 606.2 16. Provide dimensions perpendicular to water closets – from wall on side of water closets to lavatories on other side of water closets. FBCA 604.3 17. Provide accessibility details of sauna including the sauna equipment. If there are benches, changing areas, storage lockers, coat hooks, etc. in the room, show locations. Provide manufacturer’s specifications of sauna indicating it is accessible to persons with disabilities. FBCA CHAPTER 2, 8, 9. 18. Provide accessibility details of cryo room including cryo equipment. If there are benches, changing areas, storage lockers, coat hooks, etc. in the room, show locations. Provide manufacturer’s specifications of cryo unit indicating it is accessible to persons with disabilities. FBCA CHAPTER 2, 8, 9. 19. Provide dimension between cryo room entry door and wall opposite entry door. This must be known for accessible maneuverability clearances. FBCA 404. 20. Provide accessibility details of red light room. Please explain what the purpose and use of this room actually is. If there are benches, changing areas, storage lockers, coat hooks, etc. in the room, show locations. If the red light room contains some type of manufactured equipment, provide manufacturer’s specifications indicting equipment is accessible to persons with disabilities. FBCA CHAPTER 2, 8, 9. 21. Provide accessibility details of compression room including compression equipment, if any. If there are benches, changing areas, storage lockers, coat hooks, etc. in the room, show locations. Provide manufacturer’s specifications for any equipment in this room indicating equipment is accessible to persons with disabilities. FBCA CHAPTER 2, 8, 9. 22. Provide accessibility details for break room. The 3 bay sink, range and a portion of food surface prep counter top must be accessible to persons with disabilities. There are certain direction of approach for the range and sink and reach ranges for operable controls. What do the dashed lines represent? Please indicate. FBCA 308, 902 23. Provide elevation views for accessible bathrooms, accessible shower compartments, accessible countertops, accessible lavatories, accessible spaces such as lockers, coat hooks, other accessible equipment and facilities in other accessible rooms and spaces. Show reach ranges, clearances, mounting heights of all grab bars, equipment, etc. Show knee and toe clearances to provide a complete accessibility design for various accessible features. FBCA CHAPTER 2, 3, 4, 6, AND 8. AHJ. 24. Identify room in hall with double doors. AHJ 25. Show projection of double doors into hallway width when doors are open 90 degrees. Also show maximum projection of doors into hallway width when open in any position. Doors, when fully opened shall not reduce required egress width by more than 7 inches. Doors in any position shall ot reduce the required width by more than one-half. 1005.7.1 26. Show projection of doors at janitor room and laundry room into hallway width when doors are open 90 degrees. Also show maximum projection of doors into hallway width when open in any position. Doors, when fully opened shall not reduce required egress width by more than 7 inches. Doors in any position shall ot reduce the required width by more than one-half. 1005.7.1 Plan Sheet 6-12 1. Remove plan sheet and revise plan index accordingly. Owner has indicated no mezzanine is proposed in this building. Find alternative location for interior non load bearing frame way typical opening detail. AHJ. Plan Sheet 7-12 1. Remove plan sheet and revise plan index accordingly. Owner has indicated no mezzanine is proposed in this building. AHJ. Plan Sheet 10-12 1. Remove Wood Frame Staircase Construction detail. Owner has indicated no 2nd floor or mezzanine is proposed in this building. AHJ. 2. Remove ore revise exterior load bearing frame wall typical opening detail. All exterior walls are CMU construction – not wood framed. AHJ. Plan Sheet 11-12 1. Plan Index indicates there is a plan sheet 11-12. Plan sheet 11-12 has not been provided and therefore has not been reviewed. Plan Index indicates this plan sheet is for “Bathroom and Second Floor Cross sections”. If so, remove the second floor cross sections. Owner has indicated there is no second floor or mezzanine proposed for this building. AHJ. Plan Sheet 12-12 2. Revise Room Finish Schedule for Room 115 – Unisex Restroom 2 and Room 117 – Unisex Bathroom 1 to include required finishes for floors, required base board and wall finishes adjacent to toilets. This section requires “hard, non-absorbent floor and wall finishes near toilets. Hard, non-absorbent means concrete, tile and similar. Painted gypsum drywall including epoxy paint gypsum drywall is not accepted. 1210.2.1,1210.2.3 3. Revise Room finish Schedule for Room 116 – Shower Room 1 and Room 118 – Shower Room 2 including required finishes for floors, required bae board and wall finishes. You need to declare the type of shower construction and whether you are using pre-manufactured shower enclosures or panel type or ceramic tile finishes. If using pre-manufactured enclosures, provide minimum gypsum backing that conforms to. If using panels or ceramic tile. 1210.2.3, 1210.2.4, 2509.1, 2509.2. 4. Revise Door Elevation Section and Door Schedule by adding note indicating lower 10 inches of doors on the push side to be provided with kick plates or be free of any projections or recesses greater than 1/16th inch. FBCA 404.2.10 5. Revise Detail 2/A3. Provide reference to UL 263 or ASTM E119 fire barrier. Include complete UL or ASTM file details for complete construction of fire barrier. AHJ, FBCB 107.2, 107.3.5,703.2, 703.2.1, 703.2.1.1, 703.2.1.2, 703.2.2 6. Revise door schedule to include required fire rating and door closure specifications for doors in fire barrier wall separating the A-3 occupancy from the B occupancy. 716.
DSD COMPLETE 10/09/2025 10/22/2025
Note: Released By: JACQUELINE GONZALEZ - (386)986-3751 - JGONZALEZ@PALMCOASTGOV.COM
ELEC HOLD 10/09/2025 10/23/2025
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need to show lights in all rooms. 2. Show all occupancy sensors in areas mentioned in FBC Energy 2023 C 405.2.1 3. Show location of all outlets 4. Outlets in mentioned in NEC 2020 210.8 (B) need to be GFCI protected. 5. Need more information about the sauna. More comments may come for this item. You should look at NEC 2020 424 6. What is a compression area? 7. Water Fountain needs to be GFCI protected. NEC 2020 422 8. Need more information for the equipment in the cryo room.
FI1 HOLD 10/09/2025 10/23/2025
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Place not on cover sheet that Fire Sprinkler and Fire Alarm will be on separate. 2. Need exit sign in compression room. NFPA 101 7.7.3 3. Show the rating of the wall separating the two different occupancy. NFPA 101 ch 39.1.3 and table 6.1.14.4.1
MECH HOLD 10/09/2025 10/22/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM COMMENTS BELOW PER THE 2023 FLORIDA BUILDING CODE-BUILDING (FBCB), FLORIDA BUILDING CODE-EXISTING BUILDING (FBCEB), FLORIDA BUILDING CODE- MECHANICAL (FBCM), FLORIDA BUILDING CODE-ENERGY CONSERVATION (FBCEC), FLORIDA STATUTES (FS), FLORIDA ADMINISTRATIVE CODE (FAC) AND AUTHORITY HAVING JURISDICTION (AHJ). PLAN RE-SUBMITTAL SHALL BE ACCOMPANIED BY A RESPONSE LETTER SIGNED AND SEALED BY THE APPROPRIATE DESIGN PROFESSIONAL(S). ALL PLAN REVISIONS SHALL BE CLOUDED APPROPRIATELY. THIS IS A CHANGE IN OCCUPANCY. YOU WILL NOT BE ABLE TO USE THE OLD EQUIPMENT. 1. Provide Energy Calculations removing note about SEER2 conversion. The equipment needs to be seer2 rated by AHRI. C407 FBC Energy Conservation 2. Provide Ventilation calculation for entire building per Table 403.3.1.1 FBC Mechanical 3. Plans show 2684sqft for gym area. Fresh air calculation says 2484 sqft. Revise calculation. 107.2.1 4. Provide Duct layout for entire building showing supply, return, fresh air and exhaust with proposed changes. 107.2.1 5. Provide note on plans for means of balancing for all supply, return, fresh air and exhaust per Section 608 FBC Mechanical 6. Provide equipment schedule and details per FBC Energy Conservation 2023 7. AHRI submitted is for 9000 btu minisplit. Provide location on plans. 107.2.1 8. Provide details and manufacturers specs on sauna and sauna equipment. 107.2.1 9. Provide manufacturers specs on range in break room. 107.2.1 10. List mechanical subcontractor in portal. AHJ
PLUM HOLD 10/09/2025 10/22/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM COMMENTS BELOW PER THE 2023 FLORIDA BUILDING CODE-BUILDING (FBCB), FLORIDA BUILDING CODE-PLUMBING (FBCP), FLORIDA BUILDING CODE-ACCESSIBILITY (FBCA), FLORIDA STATUTES (F.S.), FLORIDA ADMINISTRATIVE CODE (F.A.C.) AND AUTHORITY HAVING JURISDICTION (A.H.J.). PLAN RE-SUBMITTAL SHALL BE ACCOMPANIED BY A RESPONSE LETTER SIGNED AND SEALED BY THE APPROPRIATE DESIGN PROFESSIONAL(S). ALL PLAN REVISIONS SHALL BE CLOUDED APPROPRIATELY. 1. Provide table showing minimum plumbing fixture requirement. 403.1 FBC Plumbing 2. Provide details on ADA water fountain 602 FBC Accessibility 3. Revise finish schedule to show toilet rooms, bathrooms and service sink areas in accordance with Section 1210 FBC Building. Epoxy paint not allowed. 4. Life safety plans show sink with disposal on outside wall in breakroom. Plumbing plans show 3 compartment sink on a different wall. Revise.107.2.1 5. Provide dimensions of showers and clearances showing compliance with 608, 608.2 FBC Accessibility 6. Provide grab bar details and location for showers 608.3 FBC Accessibility 7. Provide location and height of controls for shower 608.5 FBC Accessibility 8. Provide accessibility details for washer and dryer, show clear floor space, approach, operable parts and height. 611.1-611.4 FBC Accessibility 9. Provide accssibility details for sauna 612.1, bench details 612.2, 903, 903.2 and turning space 612.3, 304 FBC Accessibility 10. Plans show a lavatory in a closet. Is that your service sink. Provide location of required service sink 403.1 FBC Plumbing
UD1 COMPLETE 10/09/2025 10/20/2025
Note: Released By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM
UD2 HOLD 10/09/2025 10/14/2025
Note: Held By: DAN LEMONCELLO - - 1) Utility Pretreatment inspector needs to know the purpose of the 3-Comp sink to be installed. Will this facility be cooking meals for the guests, or is this only an employee breakroom? 2)If cooking meals on a daily basis, a grease trap may need to be installed, only after approval of an interior grease trap exemption form. 3) email Utility Pretreatment Inspector the answers to above and also for the grease trap exemption form @ llemoncello@palmcoastgov.com.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤65.00 02/10/2026
ADMINISTRATIVE - COMMERCIAL PP ¤450.00 02/04/2026
PLAN REVIEW - REVISION ¤65.00 02/04/2026
ADMINISTRATIVE - COMMERCIAL ¤75.00 12/24/2025
INSPECTION COMMERCIAL ¤1,141.00 12/24/2025
INSPECTION - FIRE COMMERCIAL ¤60.00 12/24/2025
PLAN REVIEW - COMMERCIAL ¤187.45 12/24/2025
CONTRACTOR CHANGE ¤20.00 12/24/2025
CONTRACTOR CHANGE ¤20.00 12/24/2025
SURCHARGE FS 533.721 ¤14.63 12/24/2025
SURCHARGE - FS 468.631 ¤21.95 12/24/2025
SITE PLAN 30 ¤30.00 12/24/2025
Fees Total Due: ¤0.00 Total Paid: ¤2,150.03