Permit #2025100357

Permit Details

Status: INSPECT

Parcel Id: 07-11-31-7028-00320-0270
CONDITIONED SPACE: 1801 sqft
GARAGE: 406 sqft
OPENED PORCH (WITH ROOF) : 16 sqft
OPENED PORCH (WITH ROOF) : 58 sqft
Total Square Footage: 2281 sqft
Block: 00320
Subdivision: -
Job Phone: 407-476-8195
Location Address: 102 POINT PLEASANT DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/03/2025
NOC: RECORDED
Applicant name: CARLETTE RENE WITTE
Owner: ALANDY ANTONIO M & MARIA LUZ ALANDY

Address

PO BOX 295

EUREKA, SD 57437

Lot: 0270
Contracted Stated Job Value: ¤175,000.00
Job Description: single family residence
Type: CN

Contractor

INNOVATIVE NATIONWIDE BUILDERS INC
Status Location Address State License Number Phone
ACTIVE

3670 MAGUIRE BLVD #220

,

CRC1330026 (Exp: 08/31/2026) 855-694-6634

Sub Contractors

TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
GREGORY WILLIAM FARIS
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC1822274 (Exp: 08/31/2026) 407-333-2665
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
ANTHONY OKEITH FENNELL
Status Location Address State License Number Phone
ACTIVE

217 N. WESTMONTE DR, SUITE 1007

ALTAMONTE SPRINGS, FL 32714

EC13011194 (Exp: 08/31/2026) 407-404-4000

Inspection History

Type Request Date Result Inspector
ROW- PRE-APRON (PRE-POUR) 06/11/2026 Disapproved -FEE REQUIRED FSLADISH
Note: 6/11/26 AS OF THIS INSPECTION NOTHING HAS CHANGED. YOU CULVERT PIPE IS OUT OF TOLERANCE WITH THE COPC SWALE PLAN DIAGRAM. ROADSIDE SWALE AND CULVERT SET WITHIN 0.10 Section 300.01 C(3) V-17 3) The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow, nor shall it be sloped more than 0.10 of a foot in thedirection of the drainage flow. 6/9/2026 - PREVIOUS INSPECTION NOTES 6/9/26 YOUR CULVERT PIPE IS OUT OF TOLERANCE TO THE COPC SWALE PLAN DIAGRAM AT THE TIME OF THIS INSPECTION.
ROW- PRE-APRON (PRE-POUR) 06/09/2026 Disapproved -FEE REQUIRED FSLADISH
Note: 6/9/26 YOUR CULVERT PIPE IS OUT OF TOLERANCE TO THE COPC SWALE PLAN DIAGRAM AT THE TIME OF THIS INSPECTION.
ELECTRIC - EARLY POWER 06/04/2026 APPROVED HCAMACHO
Note: New inspection due to canceled inspection 5/29/2026 - PREVIOUS INSPECTION NOTES 5/29/26: NOT READY! Scheduled too early. *** Electricians still working on fixtures, panel, etc. / All electric needs to be safed off. NEC-110.27 Inspector Notes from Inspection 2200 *** NOTES ADDED BY RSIMS 4/14/2026 11:39:21 AM *** 4/14/26: FPL emailed approved for TUG. 4/10/2026 - PREVIOUS INSPECTION NOTES 4/10/26: 1). TUG outlet box needs to be secured to the wall. NEC-334.30 / NEC 350.30(A) 4/8/2026 - PREVIOUS INSPECTION NOTES 4/8/26: NOT READY! There is no TUG outlet, raceway, etc. installed at the time of today's inspection.
ELECTRIC - EARLY POWER 06/03/2026 CANCELLED BY APPLICANT WEB
Note: 5/29/2026 - PREVIOUS INSPECTION NOTES 5/29/26: NOT READY! Scheduled too early. *** Electricians still working on fixtures, panel, etc. / All electric needs to be safed off. NEC-110.27 Inspector Notes from Inspection 2200 *** NOTES ADDED BY RSIMS 4/14/2026 11:39:21 AM *** 4/14/26: FPL emailed approved for TUG. 4/10/2026 - PREVIOUS INSPECTION NOTES 4/10/26: 1). TUG outlet box needs to be secured to the wall. NEC-334.30 / NEC 350.30(A) 4/8/2026 - PREVIOUS INSPECTION NOTES 4/8/26: NOT READY! There is no TUG outlet, raceway, etc. installed at the time of today's inspection.
ELECTRIC - EARLY POWER 05/29/2026 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 5/29/2026 10:08:24 AM *** 5/29/26: NOT READY! Scheduled too early. *** Electricians still working on fixtures, panel, etc. / All electric needs to be safed off. NEC-110.27 Inspector Notes from Inspection 2200 *** NOTES ADDED BY RSIMS 4/14/2026 11:39:21 AM *** 4/14/26: FPL emailed approved for TUG. 4/10/2026 - PREVIOUS INSPECTION NOTES 4/10/26: 1). TUG outlet box needs to be secured to the wall. NEC-334.30 / NEC 350.30(A) 4/8/2026 - PREVIOUS INSPECTION NOTES 4/8/26: NOT READY! There is no TUG outlet, raceway, etc. installed at the time of today's inspection.
SEWER TIE IN 05/19/2026 APPROVED RSIMS
Note: Inspector Notes from Inspection 2075 *** NOTES ADDED BY RSIMS 4/30/2026 1:39:33 PM *** 4/30/26: trench from Pep tank to first 45* elbow will need to stay uncovered for Sewer tie in inspection. Inspector Notes from Inspection 2060 *** NOTES ADDED BY RSIMS 3/5/2026 12:37:01 PM *** 3/5/26: Main underground water service piping is installed from house to meter location. Inspected and approved. 3/3/2026 - PREVIOUS INSPECTION NOTES 3/3/26: Pipes still need to be seperated or have insulation at cross over. 2/26/2026 - PREVIOUS INSPECTION NOTES 2/26/26: 1). Hot and cold water piping needs to be seperated by 6" or have insulation installed where they are together or cross over each other as required by the Manufacturer. FBC [A]107.4 "FBC-P2906.10 Cross-linked polyethylene plastic (PEX). Joints between cross-linked polyethylene plastic tubing or fittings shall comply with Section P2906.10.1 or Section P2906.10.2. Bundling Parallel runs of Uponor PEX may be bundled together, when approved by local code, given the following: • Bundle hot and cold water pipes separately at least 6"" apart (15.2cm), unless piping is insulated. • Support the bundle at the required on-center distance. • Use cable ties to group a bundle.* *Cable ties are not approved for supporting pipe. PEX Piping Systems Installation Guide | 45" 4/30/26: trench from Pep tank to first 45* elbow will need to stay uncovered for Sewer tie in inspection. Inspector Notes from Inspection 2060 *** NOTES ADDED BY RSIMS 3/5/2026 12:37:01 PM *** 3/5/26: Main underground water service piping is installed from house to meter location. Inspected and approved. 3/3/2026 - PREVIOUS INSPECTION NOTES 3/3/26: Pipes still need to be seperated or have insulation at cross over. 2/26/2026 - PREVIOUS INSPECTION NOTES 2/26/26: 1). Hot and cold water piping needs to be seperated by 6" or have insulation installed where they are together or cross over each other as required by the Manufacturer. FBC [A]107.4 "FBC-P2906.10 Cross-linked polyethylene plastic (PEX). Joints between cross-linked polyethylene plastic tubing or fittings shall comply with Section P2906.10.1 or Section P2906.10.2. Bundling Parallel runs of Uponor PEX may be bundled together, when approved by local code, given the following: • Bundle hot and cold water pipes separately at least 6"" apart (15.2cm), unless piping is insulated. • Support the bundle at the required on-center distance. • Use cable ties to group a bundle.* *Cable ties are not approved for supporting pipe. PEX Piping Systems Installation Guide | 45"
DRYWALL NAILING 05/04/2026 APPROVED KSANDOE
PEP TANK INSTALLATION REQUEST 05/01/2026 APPROVED ISANDERSON
GRAVITY SEWER TEST 04/30/2026 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 4/30/2026 1:39:33 PM *** 4/30/26: trench from Pep tank to first 45* elbow will need to stay uncovered for Sewer tie in inspection. Inspector Notes from Inspection 2060 *** NOTES ADDED BY RSIMS 3/5/2026 12:37:01 PM *** 3/5/26: Main underground water service piping is installed from house to meter location. Inspected and approved. 3/3/2026 - PREVIOUS INSPECTION NOTES 3/3/26: Pipes still need to be seperated or have insulation at cross over. 2/26/2026 - PREVIOUS INSPECTION NOTES 2/26/26: 1). Hot and cold water piping needs to be seperated by 6" or have insulation installed where they are together or cross over each other as required by the Manufacturer. FBC [A]107.4 "FBC-P2906.10 Cross-linked polyethylene plastic (PEX). Joints between cross-linked polyethylene plastic tubing or fittings shall comply with Section P2906.10.1 or Section P2906.10.2. Bundling Parallel runs of Uponor PEX may be bundled together, when approved by local code, given the following: • Bundle hot and cold water pipes separately at least 6"" apart (15.2cm), unless piping is insulated. • Support the bundle at the required on-center distance. • Use cable ties to group a bundle.* *Cable ties are not approved for supporting pipe. PEX Piping Systems Installation Guide | 45" 4/30/26: trench from Pep tank to first 45* elbow will need to stay uncovered for Sewer tie in inspection. Inspector Notes from Inspection 2060 *** NOTES ADDED BY RSIMS 3/5/2026 12:37:01 PM *** 3/5/26: Main underground water service piping is installed from house to meter location. Inspected and approved. 3/3/2026 - PREVIOUS INSPECTION NOTES 3/3/26: Pipes still need to be seperated or have insulation at cross over. 2/26/2026 - PREVIOUS INSPECTION NOTES 2/26/26: 1). Hot and cold water piping needs to be seperated by 6" or have insulation installed where they are together or cross over each other as required by the Manufacturer. FBC [A]107.4 "FBC-P2906.10 Cross-linked polyethylene plastic (PEX). Joints between cross-linked polyethylene plastic tubing or fittings shall comply with Section P2906.10.1 or Section P2906.10.2. Bundling Parallel runs of Uponor PEX may be bundled together, when approved by local code, given the following: • Bundle hot and cold water pipes separately at least 6"" apart (15.2cm), unless piping is insulated. • Support the bundle at the required on-center distance. • Use cable ties to group a bundle.* *Cable ties are not approved for supporting pipe. PEX Piping Systems Installation Guide | 45"
INSULATION 04/28/2026 APPROVED HCAMACHO
ALL ROUGH 04/21/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 4/21/2026 2:59:37 PM *** Approved 4/14/2026 - PREVIOUS INSPECTION NOTES 4/14/26: Previously listed deficiency remains unresolved. 1). Missing H10A ties at trusses T10 and T11 as required on plan page S4.0. Additional from All Rough: 2). Neutral Wires in breaker panel are not phased out. NEC 200.6(B) Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 4/1/2026 10:25:34 AM *** 4/1/26: Check at next inspection. 1). Missing H10A ties at trusses T10 and T11 as required on plan page S4.0.
LATH/BRICK/ WATER BARRIER 04/15/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 4/15/2026 12:40:32 PM *** Approved
ELECTRIC-TUG 04/14/2026 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 4/14/2026 11:39:21 AM *** 4/14/26: FPL emailed approved for TUG. 4/10/2026 - PREVIOUS INSPECTION NOTES 4/10/26: 1). TUG outlet box needs to be secured to the wall. NEC-334.30 / NEC 350.30(A) 4/8/2026 - PREVIOUS INSPECTION NOTES 4/8/26: NOT READY! There is no TUG outlet, raceway, etc. installed at the time of today's inspection.
ALL ROUGH 04/14/2026 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 4/14/2026 11:51:19 AM *** Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 4/1/2026 10:25:34 AM *** 4/1/26: Check at next inspection. 1). Missing H10A ties at trusses T10 and T11 as required on plan page S4.0. 4/14/26: Previously listed deficiency remains unresolved. 1). Missing H10A ties at trusses T10 and T11 as required on plan page S4.0. Additional from All Rough: 2). Neutral Wires in breaker panel are not phased out. NEC 200.6(B) Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 4/1/2026 10:25:34 AM *** 4/1/26: Check at next inspection. 1). Missing H10A ties at trusses T10 and T11 as required on plan page S4.0.
ELECTRIC-TUG 04/10/2026 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 4/10/2026 1:41:39 PM *** 4/10/26: 1). TUG outlet box needs to be secured to the wall. NEC-334.30 / NEC 350.30(A) 4/8/2026 - PREVIOUS INSPECTION NOTES 4/8/26: NOT READY! There is no TUG outlet, raceway, etc. installed at the time of today's inspection.
ELECTRIC-TUG 04/08/2026 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 4/8/2026 2:16:18 PM *** 4/8/26: NOT READY! There is no TUG outlet, raceway, etc. installed at the time of today's inspection.
ROOF VALLEY & METAL 04/01/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 4/1/2026 10:22:32 AM *** Approved
WALL SHEATHING 04/01/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 4/1/2026 10:22:50 AM *** Approved
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/01/2026 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 4/1/2026 10:25:34 AM *** 4/1/26: Check at next inspection. 1). Missing H10A ties at trusses T10 and T11 as required on plan page S4.0.
ROOF SHEATHING 03/27/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 3/27/2026 11:00:56 AM *** Approved
TIE BEAM / LINTEL 03/18/2026 APPROVED JSTEWART
MONOLITHIC SLAB 03/10/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 3/10/2026 3:50:39 PM ***
PLUMBING 1ST ROUGH UNDERGROUND 03/05/2026 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 3/5/2026 12:37:01 PM *** 3/5/26: Main underground water service piping is installed from house to meter location. Inspected and approved. 3/3/2026 - PREVIOUS INSPECTION NOTES 3/3/26: Pipes still need to be seperated or have insulation at cross over. 2/26/2026 - PREVIOUS INSPECTION NOTES 2/26/26: 1). Hot and cold water piping needs to be seperated by 6" or have insulation installed where they are together or cross over each other as required by the Manufacturer. FBC [A]107.4 "FBC-P2906.10 Cross-linked polyethylene plastic (PEX). Joints between cross-linked polyethylene plastic tubing or fittings shall comply with Section P2906.10.1 or Section P2906.10.2. Bundling Parallel runs of Uponor PEX may be bundled together, when approved by local code, given the following: • Bundle hot and cold water pipes separately at least 6"" apart (15.2cm), unless piping is insulated. • Support the bundle at the required on-center distance. • Use cable ties to group a bundle.* *Cable ties are not approved for supporting pipe. PEX Piping Systems Installation Guide | 45"
PLUMBING 1ST ROUGH UNDERGROUND 03/03/2026 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 3/3/2026 1:52:56 PM *** 3/3/26: Pipes still need to be seperated or have insulation at cross over. 2/26/2026 - PREVIOUS INSPECTION NOTES 2/26/26: 1). Hot and cold water piping needs to be seperated by 6" or have insulation installed where they are together or cross over each other as required by the Manufacturer. FBC [A]107.4 "FBC-P2906.10 Cross-linked polyethylene plastic (PEX). Joints between cross-linked polyethylene plastic tubing or fittings shall comply with Section P2906.10.1 or Section P2906.10.2. Bundling Parallel runs of Uponor PEX may be bundled together, when approved by local code, given the following: • Bundle hot and cold water pipes separately at least 6"" apart (15.2cm), unless piping is insulated. • Support the bundle at the required on-center distance. • Use cable ties to group a bundle.* *Cable ties are not approved for supporting pipe. PEX Piping Systems Installation Guide | 45"
PLUMBING 1ST ROUGH UNDERGROUND 02/26/2026 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 2/26/2026 9:14:44 AM *** 2/26/26: 1). Hot and cold water piping needs to be seperated by 6" or have insulation installed where they are together or cross over each other as required by the Manufacturer. FBC [A]107.4 "FBC-P2906.10 Cross-linked polyethylene plastic (PEX). Joints between cross-linked polyethylene plastic tubing or fittings shall comply with Section P2906.10.1 or Section P2906.10.2. Bundling Parallel runs of Uponor PEX may be bundled together, when approved by local code, given the following: • Bundle hot and cold water pipes separately at least 6"" apart (15.2cm), unless piping is insulated. • Support the bundle at the required on-center distance. • Use cable ties to group a bundle.* *Cable ties are not approved for supporting pipe. PEX Piping Systems Installation Guide | 45"
ROW - DRAINAGE 02/23/2026 APPROVED FSLADISH
Note: 2/23/26 REQUIRED CORRECTIONS COMPLETED AT THE TIME OF THIS INSPECTION. WILL MONITOR SITE FOR CONTINUED COMPLIANCE. ______________________________________________________________________________________________________________________________ 2/20/2026 - PREVIOUS INSPECTION NOTES 2/20/26 PLEASE REMOVE PORTA JOHN FROM COPC ROW AND ONTO YOUR CONSTRUCTION SITE. WILL BE BACK FOR COMPLIANCE REINSPECTION ON 2/23/26 ____________________________________________________________________________________________________________________________ 2/2/2026 - PREVIOUS INSPECTION NOTES 2/2/26 YOU HAVE MADE NO CHANGES SINCE LAST INSPECTION. A PERMIT INSPECTION HOLD HAS BEEN PLACED ON THIS PERMIT. YUO STILL HAVE NOT INSTALLED SILT FENCE WHERE REQUIRED AND YOUR PORTA POTTY IS STILL IN COPC ROW. PHOTO FOR REFERENCE. 1/30/2026 - PREVIOUS INSPECTION NOTES 1/30/26 SILT FENCE AND CONSTRUCTION ENTRANCE STILL NOT COMPLETED AS REQUIRED. WILL BE BACK FOR COMPLIANCE REINSPECTION 2/2/26. SEE PHOTO FOR REFERENCE. ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 5 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf 1/27/2026 - PREVIOUS INSPECTION NOTES 01-27-26 TPOLACEK*** SILT FENCE AND CONSTRUCTION ENTRANCE STILL NOT COMPLETED BUILDER HAS 3 DAYS TO COMPLY BEFORE PERMIT IS PLACED ON HOLD +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/22/2026 - PREVIOUS INSPECTION NOTES TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 5 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day.
ROW - DRAINAGE 02/20/2026 PARTIALLY APPROVED FSLADISH
Note: 2/20/26 PLEASE REMOVE PORTA JOHN FROM COPC ROW AND ONTO YOUR CONSTRUCTION SITE. WILL BE BACK FOR COMPLIANCE REINSPECTION ON 2/23/26 ____________________________________________________________________________________________________________________________ 2/2/2026 - PREVIOUS INSPECTION NOTES 2/2/26 YOU HAVE MADE NO CHANGES SINCE LAST INSPECTION. A PERMIT INSPECTION HOLD HAS BEEN PLACED ON THIS PERMIT. YUO STILL HAVE NOT INSTALLED SILT FENCE WHERE REQUIRED AND YOUR PORTA POTTY IS STILL IN COPC ROW. PHOTO FOR REFERENCE. 1/30/2026 - PREVIOUS INSPECTION NOTES 1/30/26 SILT FENCE AND CONSTRUCTION ENTRANCE STILL NOT COMPLETED AS REQUIRED. WILL BE BACK FOR COMPLIANCE REINSPECTION 2/2/26. SEE PHOTO FOR REFERENCE. ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 5 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf 1/27/2026 - PREVIOUS INSPECTION NOTES 01-27-26 TPOLACEK*** SILT FENCE AND CONSTRUCTION ENTRANCE STILL NOT COMPLETED BUILDER HAS 3 DAYS TO COMPLY BEFORE PERMIT IS PLACED ON HOLD +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/22/2026 - PREVIOUS INSPECTION NOTES TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 5 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day.
FORMBOARD SURVEY (OFFICE USE ONLY) 02/17/2026 APPROVED RRICKS
ROW - DRAINAGE 02/02/2026 Disapproved -FEE REQUIRED FSLADISH
Note: 2/2/26 YOU HAVE MADE NO CHANGES SINCE LAST INSPECTION. A PERMIT INSPECTION HOLD HAS BEEN PLACED ON THIS PERMIT. YUO STILL HAVE NOT INSTALLED SILT FENCE WHERE REQUIRED AND YOUR PORTA POTTY IS STILL IN COPC ROW. PHOTO FOR REFERENCE. 1/30/2026 - PREVIOUS INSPECTION NOTES 1/30/26 SILT FENCE AND CONSTRUCTION ENTRANCE STILL NOT COMPLETED AS REQUIRED. WILL BE BACK FOR COMPLIANCE REINSPECTION 2/2/26. SEE PHOTO FOR REFERENCE. ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 5 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf 1/27/2026 - PREVIOUS INSPECTION NOTES 01-27-26 TPOLACEK*** SILT FENCE AND CONSTRUCTION ENTRANCE STILL NOT COMPLETED BUILDER HAS 3 DAYS TO COMPLY BEFORE PERMIT IS PLACED ON HOLD +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/22/2026 - PREVIOUS INSPECTION NOTES TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 5 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day.
ROW - DRAINAGE 01/30/2026 Disapproved -FEE REQUIRED FSLADISH
Note: 1/30/26 SILT FENCE AND CONSTRUCTION ENTRANCE STILL NOT COMPLETED AS REQUIRED. WILL BE BACK FOR COMPLIANCE REINSPECTION 2/2/26. SEE PHOTO FOR REFERENCE. ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 5 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf 1/27/2026 - PREVIOUS INSPECTION NOTES 01-27-26 TPOLACEK*** SILT FENCE AND CONSTRUCTION ENTRANCE STILL NOT COMPLETED BUILDER HAS 3 DAYS TO COMPLY BEFORE PERMIT IS PLACED ON HOLD +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/22/2026 - PREVIOUS INSPECTION NOTES TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 5 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day.
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 01/29/2026 APPROVED PKNAPIK
ROW - DRAINAGE 01/27/2026 Disapproved -FEE REQUIRED TPOLACEK
Note: 01-27-26 TPOLACEK*** SILT FENCE AND CONSTRUCTION ENTRANCE STILL NOT COMPLETED BUILDER HAS 3 DAYS TO COMPLY BEFORE PERMIT IS PLACED ON HOLD +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/22/2026 - PREVIOUS INSPECTION NOTES TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 5 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day.
ROW - DRAINAGE 01/22/2026 Disapproved - NO FEE TPOLACEK
Note: TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 5 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day.
WATER METER INSTALLATION REQUEST 01/12/2026 APPROVED CBOWERMASTER
U-CROSS CONNECTION
ROW- PRE-APRON (PRE-POUR)
Note: 6/11/2026 - PREVIOUS INSPECTION NOTES 6/11/26 AS OF THIS INSPECTION NOTHING HAS CHANGED. YOU CULVERT PIPE IS OUT OF TOLERANCE WITH THE COPC SWALE PLAN DIAGRAM. ROADSIDE SWALE AND CULVERT SET WITHIN 0.10 Section 300.01 C(3) V-17 3) The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow, nor shall it be sloped more than 0.10 of a foot in thedirection of the drainage flow. 6/9/2026 - PREVIOUS INSPECTION NOTES 6/9/26 YOUR CULVERT PIPE IS OUT OF TOLERANCE TO THE COPC SWALE PLAN DIAGRAM AT THE TIME OF THIS INSPECTION.
ROW - FINAL APRON (AFTER POUR)
ROW- FINAL SURVEY/GRADING CERTIFICATION
BLD - BUILDING FINAL
ROW - FINAL INSPECTION
U -UTILITY RESIDENTIAL FINAL

Review History

Department Status Date In Date Out
BLD COMPLETE 04/15/2026 04/17/2026
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
MECH COMPLETE 03/31/2026 04/01/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 02/17/2026 02/17/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 02/17/2026 02/17/2026
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM
SW1 HOLD 02/06/2026 02/06/2026
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Formboard demension on the left side of the home is off by 4' compared to approved grading plan.
ZON COMPLETE 02/06/2026 02/06/2026
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 01/29/2026 01/29/2026
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SWALE COMPLETE 12/18/2025 12/18/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
SW1 COMPLETE 12/11/2025 12/11/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Disregard previous hold comments. Benchmark is fine.
ENGIN1 COMPLETE 12/04/2025 12/05/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 12/04/2025 12/05/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
SW1 HOLD 12/04/2025 12/11/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Please provide a closer benchmark. Based on google maps there are several power poles across the street.
MECH COMPLETE 10/23/2025 10/27/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/17/2025 10/20/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 10/17/2025 10/17/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
MECH HOLD 10/17/2025 10/20/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Design location on heatload needs to be Daytona Beach (Second Request)
SW1 COMPLETE 10/17/2025 10/20/2025
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
BLD COMPLETE 10/17/2025 10/23/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 10/10/2025 10/17/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
CUSVC COMPLETE 10/10/2025 10/16/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 10/10/2025 10/16/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 HOLD 10/10/2025 10/14/2025
Note: Held By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM Benchmark needs to be set in a power pole. on top of a manhole, etc. Nails in the centerline can only be used in the absence of other options.
GAS CANCEL 10/10/2025 10/15/2025
LOCATE COMPLETE 10/10/2025 10/16/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 10/10/2025 10/15/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Design location on heatload needs to be Daytona Beach
SW1 HOLD 10/10/2025 10/15/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Grading comments: Please place benchmark in PP, manhole cover, or hydrant.
ZON HOLD 10/10/2025 10/14/2025
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Elevation sheet: Banding on windows needs to be all around as it faces a ROW Front door does not indicate that it will have banding all atound please show it

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
RSI REINSPECTION 1 ¤35.00 06/10/2026
RSI REINSPECTION 1 ¤35.00 06/05/2026
RSI REINSPECTION 1 ¤35.00 06/05/2026
RSI REINSPECTION 1 ¤35.00 06/05/2026
RSI REINSPECTION 1 ¤35.00 06/05/2026
PLAN REVIEW - REVISION ¤32.50 06/05/2026
REINSPECTION RESIDENTIAL ¤40.00 06/05/2026
REINSPECTION RESIDENTIAL ¤40.00 06/05/2026
REINSPECTION RESIDENTIAL ¤40.00 06/05/2026
CONTRACTOR CHANGE ¤20.00 06/05/2026
CONTRACTOR CHANGE ¤20.00 06/05/2026
RSI REINSPECTION 1 ¤35.00 06/05/2026
RSI REINSPECTION 2 ¤75.00 06/05/2026
RSI ROW FINAL INSPECTION ¤16.25 12/03/2025
SCHOOL BOARD IMPACT FEE RES ¤5,450.00 12/03/2025
WASTEWATER MAIN EXTENSION IMPA ¤2,385.00 12/03/2025
SURCHARGE FS 533.721 ¤12.37 12/03/2025
SURCHARGE - FS 468.631 ¤18.56 12/03/2025
SW ENG RES REVIEW 240 ¤240.00 12/03/2025
WATER METER W/ TAP ¤2,326.93 12/03/2025
TRANSP RES IMPACT FEE 10-25 ¤6,789.77 12/03/2025
SEWER CREDIT (¤2,455.04) 12/03/2025
WASTEWATER PERM INSPECTION ¤80.00 12/03/2025
WASTEWATER PERM REVIEW ¤25.00 12/03/2025
SEWER CAPITAL FACILITY ¤4,415.00 12/03/2025
WATER CREDIT (¤10.71) 12/03/2025
WATER CAPITAL FACILITY FEE ¤3,790.49 12/03/2025
WATER PERMIT REVIEW ¤25.00 12/03/2025
WATER MAIN EXTENSION IMPACT ¤917.27 12/03/2025
SITE PLAN 30 ¤30.00 12/03/2025
FC IMPACT FEE EMS ¤62.00 12/03/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 12/03/2025
FC IMPACT FEE LIBRARY ¤268.00 12/03/2025
FIRE RES IMPACT FEE 10-25 ¤942.00 12/03/2025
PEP TANK INSTALL ¤756.74 12/03/2025
PARKS IMPACT FEE 10-25 ¤3,164.00 12/03/2025
RSI DRIVEWAY AFTER POUR ¤16.25 12/03/2025
RSE DRIVE PRE POUR INSPECTION ¤32.50 12/03/2025
RSI FIELD SURVEY INSPECTION ¤48.75 12/03/2025
RSI FORMBOARD REVIEW ¤16.25 12/03/2025
RSI PLAN REVIEW NEW ¤48.75 12/03/2025
RSI FNL SURVEY/GRADING CERT ¤48.75 12/03/2025
WATER- TURN ON ¤50.00 12/03/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 12/03/2025
INSPECTION - RESIDENTIAL ¤940.50 12/03/2025
PLAN REVIEW - RESIDENTIAL ¤266.76 12/03/2025
RSI REINSPECTION 1 ¤35.00
Fees Total Due: ¤35.00 Total Paid: ¤31,442.64