Permit #2025100357
Permit Details
Status: INSPECT
| Parcel Id: 07-11-31-7028-00320-0270 |
| CONDITIONED SPACE: 1801 sqft |
| GARAGE: 406 sqft |
| OPENED PORCH (WITH ROOF) : 16 sqft |
| OPENED PORCH (WITH ROOF) : 58 sqft |
| Total Square Footage: 2281 sqft |
| Block: 00320 |
| Subdivision: - |
| Job Phone: 407-476-8195 |
| Location Address: 102 POINT PLEASANT DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/03/2025 |
| NOC: RECORDED |
| Applicant name: CARLETTE RENE WITTE |
| Owner: ALANDY ANTONIO M & MARIA LUZ ALANDY |
|
Address PO BOX 295 EUREKA, SD 57437 |
| Lot: 0270 |
| Contracted Stated Job Value: ¤175,000.00 |
| Job Description: single family residence |
| Type: CN |
Contractor
INNOVATIVE NATIONWIDE BUILDERS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3670 MAGUIRE BLVD #220 , |
CRC1330026 (Exp: 08/31/2026) | 855-694-6634 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
GREGORY WILLIAM FARIS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC1822274 (Exp: 08/31/2026) | 407-333-2665 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
ANTHONY OKEITH FENNELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N. WESTMONTE DR, SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
EC13011194 (Exp: 08/31/2026) | 407-404-4000 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW- PRE-APRON (PRE-POUR) | 06/11/2026 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 6/11/26 AS OF THIS INSPECTION NOTHING HAS CHANGED. YOU CULVERT PIPE IS OUT OF TOLERANCE WITH THE COPC SWALE PLAN DIAGRAM. ROADSIDE SWALE AND CULVERT SET WITHIN 0.10 Section 300.01 C(3) V-17 3) The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow, nor shall it be sloped more than 0.10 of a foot in thedirection of the drainage flow. 6/9/2026 - PREVIOUS INSPECTION NOTES 6/9/26 YOUR CULVERT PIPE IS OUT OF TOLERANCE TO THE COPC SWALE PLAN DIAGRAM AT THE TIME OF THIS INSPECTION. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/09/2026 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 6/9/26 YOUR CULVERT PIPE IS OUT OF TOLERANCE TO THE COPC SWALE PLAN DIAGRAM AT THE TIME OF THIS INSPECTION. | |||
| ELECTRIC - EARLY POWER | 06/04/2026 | APPROVED | HCAMACHO |
| Note: New inspection due to canceled inspection 5/29/2026 - PREVIOUS INSPECTION NOTES 5/29/26: NOT READY! Scheduled too early. *** Electricians still working on fixtures, panel, etc. / All electric needs to be safed off. NEC-110.27 Inspector Notes from Inspection 2200 *** NOTES ADDED BY RSIMS 4/14/2026 11:39:21 AM *** 4/14/26: FPL emailed approved for TUG. 4/10/2026 - PREVIOUS INSPECTION NOTES 4/10/26: 1). TUG outlet box needs to be secured to the wall. NEC-334.30 / NEC 350.30(A) 4/8/2026 - PREVIOUS INSPECTION NOTES 4/8/26: NOT READY! There is no TUG outlet, raceway, etc. installed at the time of today's inspection. | |||
| ELECTRIC - EARLY POWER | 06/03/2026 | CANCELLED BY APPLICANT | WEB |
| Note: 5/29/2026 - PREVIOUS INSPECTION NOTES 5/29/26: NOT READY! Scheduled too early. *** Electricians still working on fixtures, panel, etc. / All electric needs to be safed off. NEC-110.27 Inspector Notes from Inspection 2200 *** NOTES ADDED BY RSIMS 4/14/2026 11:39:21 AM *** 4/14/26: FPL emailed approved for TUG. 4/10/2026 - PREVIOUS INSPECTION NOTES 4/10/26: 1). TUG outlet box needs to be secured to the wall. NEC-334.30 / NEC 350.30(A) 4/8/2026 - PREVIOUS INSPECTION NOTES 4/8/26: NOT READY! There is no TUG outlet, raceway, etc. installed at the time of today's inspection. | |||
| ELECTRIC - EARLY POWER | 05/29/2026 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/29/2026 10:08:24 AM *** 5/29/26: NOT READY! Scheduled too early. *** Electricians still working on fixtures, panel, etc. / All electric needs to be safed off. NEC-110.27 Inspector Notes from Inspection 2200 *** NOTES ADDED BY RSIMS 4/14/2026 11:39:21 AM *** 4/14/26: FPL emailed approved for TUG. 4/10/2026 - PREVIOUS INSPECTION NOTES 4/10/26: 1). TUG outlet box needs to be secured to the wall. NEC-334.30 / NEC 350.30(A) 4/8/2026 - PREVIOUS INSPECTION NOTES 4/8/26: NOT READY! There is no TUG outlet, raceway, etc. installed at the time of today's inspection. | |||
| SEWER TIE IN | 05/19/2026 | APPROVED | RSIMS |
| Note: Inspector Notes from Inspection 2075 *** NOTES ADDED BY RSIMS 4/30/2026 1:39:33 PM *** 4/30/26: trench from Pep tank to first 45* elbow will need to stay uncovered for Sewer tie in inspection. Inspector Notes from Inspection 2060 *** NOTES ADDED BY RSIMS 3/5/2026 12:37:01 PM *** 3/5/26: Main underground water service piping is installed from house to meter location. Inspected and approved. 3/3/2026 - PREVIOUS INSPECTION NOTES 3/3/26: Pipes still need to be seperated or have insulation at cross over. 2/26/2026 - PREVIOUS INSPECTION NOTES 2/26/26: 1). Hot and cold water piping needs to be seperated by 6" or have insulation installed where they are together or cross over each other as required by the Manufacturer. FBC [A]107.4 "FBC-P2906.10 Cross-linked polyethylene plastic (PEX). Joints between cross-linked polyethylene plastic tubing or fittings shall comply with Section P2906.10.1 or Section P2906.10.2. Bundling Parallel runs of Uponor PEX may be bundled together, when approved by local code, given the following: • Bundle hot and cold water pipes separately at least 6"" apart (15.2cm), unless piping is insulated. • Support the bundle at the required on-center distance. • Use cable ties to group a bundle.* *Cable ties are not approved for supporting pipe. PEX Piping Systems Installation Guide | 45" 4/30/26: trench from Pep tank to first 45* elbow will need to stay uncovered for Sewer tie in inspection. Inspector Notes from Inspection 2060 *** NOTES ADDED BY RSIMS 3/5/2026 12:37:01 PM *** 3/5/26: Main underground water service piping is installed from house to meter location. Inspected and approved. 3/3/2026 - PREVIOUS INSPECTION NOTES 3/3/26: Pipes still need to be seperated or have insulation at cross over. 2/26/2026 - PREVIOUS INSPECTION NOTES 2/26/26: 1). Hot and cold water piping needs to be seperated by 6" or have insulation installed where they are together or cross over each other as required by the Manufacturer. FBC [A]107.4 "FBC-P2906.10 Cross-linked polyethylene plastic (PEX). Joints between cross-linked polyethylene plastic tubing or fittings shall comply with Section P2906.10.1 or Section P2906.10.2. Bundling Parallel runs of Uponor PEX may be bundled together, when approved by local code, given the following: • Bundle hot and cold water pipes separately at least 6"" apart (15.2cm), unless piping is insulated. • Support the bundle at the required on-center distance. • Use cable ties to group a bundle.* *Cable ties are not approved for supporting pipe. PEX Piping Systems Installation Guide | 45" | |||
| DRYWALL NAILING | 05/04/2026 | APPROVED | KSANDOE |
| PEP TANK INSTALLATION REQUEST | 05/01/2026 | APPROVED | ISANDERSON |
| GRAVITY SEWER TEST | 04/30/2026 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/30/2026 1:39:33 PM *** 4/30/26: trench from Pep tank to first 45* elbow will need to stay uncovered for Sewer tie in inspection. Inspector Notes from Inspection 2060 *** NOTES ADDED BY RSIMS 3/5/2026 12:37:01 PM *** 3/5/26: Main underground water service piping is installed from house to meter location. Inspected and approved. 3/3/2026 - PREVIOUS INSPECTION NOTES 3/3/26: Pipes still need to be seperated or have insulation at cross over. 2/26/2026 - PREVIOUS INSPECTION NOTES 2/26/26: 1). Hot and cold water piping needs to be seperated by 6" or have insulation installed where they are together or cross over each other as required by the Manufacturer. FBC [A]107.4 "FBC-P2906.10 Cross-linked polyethylene plastic (PEX). Joints between cross-linked polyethylene plastic tubing or fittings shall comply with Section P2906.10.1 or Section P2906.10.2. Bundling Parallel runs of Uponor PEX may be bundled together, when approved by local code, given the following: • Bundle hot and cold water pipes separately at least 6"" apart (15.2cm), unless piping is insulated. • Support the bundle at the required on-center distance. • Use cable ties to group a bundle.* *Cable ties are not approved for supporting pipe. PEX Piping Systems Installation Guide | 45" 4/30/26: trench from Pep tank to first 45* elbow will need to stay uncovered for Sewer tie in inspection. Inspector Notes from Inspection 2060 *** NOTES ADDED BY RSIMS 3/5/2026 12:37:01 PM *** 3/5/26: Main underground water service piping is installed from house to meter location. Inspected and approved. 3/3/2026 - PREVIOUS INSPECTION NOTES 3/3/26: Pipes still need to be seperated or have insulation at cross over. 2/26/2026 - PREVIOUS INSPECTION NOTES 2/26/26: 1). Hot and cold water piping needs to be seperated by 6" or have insulation installed where they are together or cross over each other as required by the Manufacturer. FBC [A]107.4 "FBC-P2906.10 Cross-linked polyethylene plastic (PEX). Joints between cross-linked polyethylene plastic tubing or fittings shall comply with Section P2906.10.1 or Section P2906.10.2. Bundling Parallel runs of Uponor PEX may be bundled together, when approved by local code, given the following: • Bundle hot and cold water pipes separately at least 6"" apart (15.2cm), unless piping is insulated. • Support the bundle at the required on-center distance. • Use cable ties to group a bundle.* *Cable ties are not approved for supporting pipe. PEX Piping Systems Installation Guide | 45" | |||
| INSULATION | 04/28/2026 | APPROVED | HCAMACHO |
| ALL ROUGH | 04/21/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/21/2026 2:59:37 PM *** Approved 4/14/2026 - PREVIOUS INSPECTION NOTES 4/14/26: Previously listed deficiency remains unresolved. 1). Missing H10A ties at trusses T10 and T11 as required on plan page S4.0. Additional from All Rough: 2). Neutral Wires in breaker panel are not phased out. NEC 200.6(B) Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 4/1/2026 10:25:34 AM *** 4/1/26: Check at next inspection. 1). Missing H10A ties at trusses T10 and T11 as required on plan page S4.0. | |||
| LATH/BRICK/ WATER BARRIER | 04/15/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/15/2026 12:40:32 PM *** Approved | |||
| ELECTRIC-TUG | 04/14/2026 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/14/2026 11:39:21 AM *** 4/14/26: FPL emailed approved for TUG. 4/10/2026 - PREVIOUS INSPECTION NOTES 4/10/26: 1). TUG outlet box needs to be secured to the wall. NEC-334.30 / NEC 350.30(A) 4/8/2026 - PREVIOUS INSPECTION NOTES 4/8/26: NOT READY! There is no TUG outlet, raceway, etc. installed at the time of today's inspection. | |||
| ALL ROUGH | 04/14/2026 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/14/2026 11:51:19 AM *** Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 4/1/2026 10:25:34 AM *** 4/1/26: Check at next inspection. 1). Missing H10A ties at trusses T10 and T11 as required on plan page S4.0. 4/14/26: Previously listed deficiency remains unresolved. 1). Missing H10A ties at trusses T10 and T11 as required on plan page S4.0. Additional from All Rough: 2). Neutral Wires in breaker panel are not phased out. NEC 200.6(B) Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 4/1/2026 10:25:34 AM *** 4/1/26: Check at next inspection. 1). Missing H10A ties at trusses T10 and T11 as required on plan page S4.0. | |||
| ELECTRIC-TUG | 04/10/2026 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/10/2026 1:41:39 PM *** 4/10/26: 1). TUG outlet box needs to be secured to the wall. NEC-334.30 / NEC 350.30(A) 4/8/2026 - PREVIOUS INSPECTION NOTES 4/8/26: NOT READY! There is no TUG outlet, raceway, etc. installed at the time of today's inspection. | |||
| ELECTRIC-TUG | 04/08/2026 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/8/2026 2:16:18 PM *** 4/8/26: NOT READY! There is no TUG outlet, raceway, etc. installed at the time of today's inspection. | |||
| ROOF VALLEY & METAL | 04/01/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/1/2026 10:22:32 AM *** Approved | |||
| WALL SHEATHING | 04/01/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/1/2026 10:22:50 AM *** Approved | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/01/2026 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/1/2026 10:25:34 AM *** 4/1/26: Check at next inspection. 1). Missing H10A ties at trusses T10 and T11 as required on plan page S4.0. | |||
| ROOF SHEATHING | 03/27/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 3/27/2026 11:00:56 AM *** Approved | |||
| TIE BEAM / LINTEL | 03/18/2026 | APPROVED | JSTEWART |
| MONOLITHIC SLAB | 03/10/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 3/10/2026 3:50:39 PM *** | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/05/2026 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 3/5/2026 12:37:01 PM *** 3/5/26: Main underground water service piping is installed from house to meter location. Inspected and approved. 3/3/2026 - PREVIOUS INSPECTION NOTES 3/3/26: Pipes still need to be seperated or have insulation at cross over. 2/26/2026 - PREVIOUS INSPECTION NOTES 2/26/26: 1). Hot and cold water piping needs to be seperated by 6" or have insulation installed where they are together or cross over each other as required by the Manufacturer. FBC [A]107.4 "FBC-P2906.10 Cross-linked polyethylene plastic (PEX). Joints between cross-linked polyethylene plastic tubing or fittings shall comply with Section P2906.10.1 or Section P2906.10.2. Bundling Parallel runs of Uponor PEX may be bundled together, when approved by local code, given the following: • Bundle hot and cold water pipes separately at least 6"" apart (15.2cm), unless piping is insulated. • Support the bundle at the required on-center distance. • Use cable ties to group a bundle.* *Cable ties are not approved for supporting pipe. PEX Piping Systems Installation Guide | 45" | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/03/2026 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 3/3/2026 1:52:56 PM *** 3/3/26: Pipes still need to be seperated or have insulation at cross over. 2/26/2026 - PREVIOUS INSPECTION NOTES 2/26/26: 1). Hot and cold water piping needs to be seperated by 6" or have insulation installed where they are together or cross over each other as required by the Manufacturer. FBC [A]107.4 "FBC-P2906.10 Cross-linked polyethylene plastic (PEX). Joints between cross-linked polyethylene plastic tubing or fittings shall comply with Section P2906.10.1 or Section P2906.10.2. Bundling Parallel runs of Uponor PEX may be bundled together, when approved by local code, given the following: • Bundle hot and cold water pipes separately at least 6"" apart (15.2cm), unless piping is insulated. • Support the bundle at the required on-center distance. • Use cable ties to group a bundle.* *Cable ties are not approved for supporting pipe. PEX Piping Systems Installation Guide | 45" | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 02/26/2026 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 2/26/2026 9:14:44 AM *** 2/26/26: 1). Hot and cold water piping needs to be seperated by 6" or have insulation installed where they are together or cross over each other as required by the Manufacturer. FBC [A]107.4 "FBC-P2906.10 Cross-linked polyethylene plastic (PEX). Joints between cross-linked polyethylene plastic tubing or fittings shall comply with Section P2906.10.1 or Section P2906.10.2. Bundling Parallel runs of Uponor PEX may be bundled together, when approved by local code, given the following: • Bundle hot and cold water pipes separately at least 6"" apart (15.2cm), unless piping is insulated. • Support the bundle at the required on-center distance. • Use cable ties to group a bundle.* *Cable ties are not approved for supporting pipe. PEX Piping Systems Installation Guide | 45" | |||
| ROW - DRAINAGE | 02/23/2026 | APPROVED | FSLADISH |
| Note: 2/23/26 REQUIRED CORRECTIONS COMPLETED AT THE TIME OF THIS INSPECTION. WILL MONITOR SITE FOR CONTINUED COMPLIANCE. ______________________________________________________________________________________________________________________________ 2/20/2026 - PREVIOUS INSPECTION NOTES 2/20/26 PLEASE REMOVE PORTA JOHN FROM COPC ROW AND ONTO YOUR CONSTRUCTION SITE. WILL BE BACK FOR COMPLIANCE REINSPECTION ON 2/23/26 ____________________________________________________________________________________________________________________________ 2/2/2026 - PREVIOUS INSPECTION NOTES 2/2/26 YOU HAVE MADE NO CHANGES SINCE LAST INSPECTION. A PERMIT INSPECTION HOLD HAS BEEN PLACED ON THIS PERMIT. YUO STILL HAVE NOT INSTALLED SILT FENCE WHERE REQUIRED AND YOUR PORTA POTTY IS STILL IN COPC ROW. PHOTO FOR REFERENCE. 1/30/2026 - PREVIOUS INSPECTION NOTES 1/30/26 SILT FENCE AND CONSTRUCTION ENTRANCE STILL NOT COMPLETED AS REQUIRED. WILL BE BACK FOR COMPLIANCE REINSPECTION 2/2/26. SEE PHOTO FOR REFERENCE. ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 5 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf 1/27/2026 - PREVIOUS INSPECTION NOTES 01-27-26 TPOLACEK*** SILT FENCE AND CONSTRUCTION ENTRANCE STILL NOT COMPLETED BUILDER HAS 3 DAYS TO COMPLY BEFORE PERMIT IS PLACED ON HOLD +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/22/2026 - PREVIOUS INSPECTION NOTES TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 5 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. | |||
| ROW - DRAINAGE | 02/20/2026 | PARTIALLY APPROVED | FSLADISH |
| Note: 2/20/26 PLEASE REMOVE PORTA JOHN FROM COPC ROW AND ONTO YOUR CONSTRUCTION SITE. WILL BE BACK FOR COMPLIANCE REINSPECTION ON 2/23/26 ____________________________________________________________________________________________________________________________ 2/2/2026 - PREVIOUS INSPECTION NOTES 2/2/26 YOU HAVE MADE NO CHANGES SINCE LAST INSPECTION. A PERMIT INSPECTION HOLD HAS BEEN PLACED ON THIS PERMIT. YUO STILL HAVE NOT INSTALLED SILT FENCE WHERE REQUIRED AND YOUR PORTA POTTY IS STILL IN COPC ROW. PHOTO FOR REFERENCE. 1/30/2026 - PREVIOUS INSPECTION NOTES 1/30/26 SILT FENCE AND CONSTRUCTION ENTRANCE STILL NOT COMPLETED AS REQUIRED. WILL BE BACK FOR COMPLIANCE REINSPECTION 2/2/26. SEE PHOTO FOR REFERENCE. ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 5 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf 1/27/2026 - PREVIOUS INSPECTION NOTES 01-27-26 TPOLACEK*** SILT FENCE AND CONSTRUCTION ENTRANCE STILL NOT COMPLETED BUILDER HAS 3 DAYS TO COMPLY BEFORE PERMIT IS PLACED ON HOLD +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/22/2026 - PREVIOUS INSPECTION NOTES TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 5 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. | |||
| FORMBOARD SURVEY (OFFICE USE ONLY) | 02/17/2026 | APPROVED | RRICKS |
| ROW - DRAINAGE | 02/02/2026 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 2/2/26 YOU HAVE MADE NO CHANGES SINCE LAST INSPECTION. A PERMIT INSPECTION HOLD HAS BEEN PLACED ON THIS PERMIT. YUO STILL HAVE NOT INSTALLED SILT FENCE WHERE REQUIRED AND YOUR PORTA POTTY IS STILL IN COPC ROW. PHOTO FOR REFERENCE. 1/30/2026 - PREVIOUS INSPECTION NOTES 1/30/26 SILT FENCE AND CONSTRUCTION ENTRANCE STILL NOT COMPLETED AS REQUIRED. WILL BE BACK FOR COMPLIANCE REINSPECTION 2/2/26. SEE PHOTO FOR REFERENCE. ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 5 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf 1/27/2026 - PREVIOUS INSPECTION NOTES 01-27-26 TPOLACEK*** SILT FENCE AND CONSTRUCTION ENTRANCE STILL NOT COMPLETED BUILDER HAS 3 DAYS TO COMPLY BEFORE PERMIT IS PLACED ON HOLD +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/22/2026 - PREVIOUS INSPECTION NOTES TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 5 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. | |||
| ROW - DRAINAGE | 01/30/2026 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 1/30/26 SILT FENCE AND CONSTRUCTION ENTRANCE STILL NOT COMPLETED AS REQUIRED. WILL BE BACK FOR COMPLIANCE REINSPECTION 2/2/26. SEE PHOTO FOR REFERENCE. ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 5 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf 1/27/2026 - PREVIOUS INSPECTION NOTES 01-27-26 TPOLACEK*** SILT FENCE AND CONSTRUCTION ENTRANCE STILL NOT COMPLETED BUILDER HAS 3 DAYS TO COMPLY BEFORE PERMIT IS PLACED ON HOLD +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/22/2026 - PREVIOUS INSPECTION NOTES TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 5 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 01/29/2026 | APPROVED | PKNAPIK |
| ROW - DRAINAGE | 01/27/2026 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 01-27-26 TPOLACEK*** SILT FENCE AND CONSTRUCTION ENTRANCE STILL NOT COMPLETED BUILDER HAS 3 DAYS TO COMPLY BEFORE PERMIT IS PLACED ON HOLD +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/22/2026 - PREVIOUS INSPECTION NOTES TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 5 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. | |||
| ROW - DRAINAGE | 01/22/2026 | Disapproved - NO FEE | TPOLACEK |
| Note: TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 5 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. | |||
| WATER METER INSTALLATION REQUEST | 01/12/2026 | APPROVED | CBOWERMASTER |
| U-CROSS CONNECTION | |||
| ROW- PRE-APRON (PRE-POUR) | |||
| Note: 6/11/2026 - PREVIOUS INSPECTION NOTES 6/11/26 AS OF THIS INSPECTION NOTHING HAS CHANGED. YOU CULVERT PIPE IS OUT OF TOLERANCE WITH THE COPC SWALE PLAN DIAGRAM. ROADSIDE SWALE AND CULVERT SET WITHIN 0.10 Section 300.01 C(3) V-17 3) The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow, nor shall it be sloped more than 0.10 of a foot in thedirection of the drainage flow. 6/9/2026 - PREVIOUS INSPECTION NOTES 6/9/26 YOUR CULVERT PIPE IS OUT OF TOLERANCE TO THE COPC SWALE PLAN DIAGRAM AT THE TIME OF THIS INSPECTION. | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | |||
| BLD - BUILDING FINAL | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 04/15/2026 | 04/17/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/31/2026 | 04/01/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/17/2026 | 02/17/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/17/2026 | 02/17/2026 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 02/06/2026 | 02/06/2026 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Formboard demension on the left side of the home is off by 4' compared to approved grading plan. | |||
| ZON | COMPLETE | 02/06/2026 | 02/06/2026 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/29/2026 | 01/29/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 12/18/2025 | 12/18/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/11/2025 | 12/11/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Disregard previous hold comments. Benchmark is fine. | |||
| ENGIN1 | COMPLETE | 12/04/2025 | 12/05/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/04/2025 | 12/05/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 12/04/2025 | 12/11/2025 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Please provide a closer benchmark. Based on google maps there are several power poles across the street. | |||
| MECH | COMPLETE | 10/23/2025 | 10/27/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/17/2025 | 10/20/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/17/2025 | 10/17/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| MECH | HOLD | 10/17/2025 | 10/20/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Design location on heatload needs to be Daytona Beach (Second Request) | |||
| SW1 | COMPLETE | 10/17/2025 | 10/20/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/17/2025 | 10/23/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/10/2025 | 10/17/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 10/10/2025 | 10/16/2025 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 10/10/2025 | 10/16/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 10/10/2025 | 10/14/2025 |
| Note: Held By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM Benchmark needs to be set in a power pole. on top of a manhole, etc. Nails in the centerline can only be used in the absence of other options. | |||
| GAS | CANCEL | 10/10/2025 | 10/15/2025 |
| LOCATE | COMPLETE | 10/10/2025 | 10/16/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 10/10/2025 | 10/15/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Design location on heatload needs to be Daytona Beach | |||
| SW1 | HOLD | 10/10/2025 | 10/15/2025 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Grading comments: Please place benchmark in PP, manhole cover, or hydrant. | |||
| ZON | HOLD | 10/10/2025 | 10/14/2025 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Elevation sheet: Banding on windows needs to be all around as it faces a ROW Front door does not indicate that it will have banding all atound please show it |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| RSI REINSPECTION 1 | ¤35.00 | 06/10/2026 |
| RSI REINSPECTION 1 | ¤35.00 | 06/05/2026 |
| RSI REINSPECTION 1 | ¤35.00 | 06/05/2026 |
| RSI REINSPECTION 1 | ¤35.00 | 06/05/2026 |
| RSI REINSPECTION 1 | ¤35.00 | 06/05/2026 |
| PLAN REVIEW - REVISION | ¤32.50 | 06/05/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/05/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/05/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/05/2026 |
| CONTRACTOR CHANGE | ¤20.00 | 06/05/2026 |
| CONTRACTOR CHANGE | ¤20.00 | 06/05/2026 |
| RSI REINSPECTION 1 | ¤35.00 | 06/05/2026 |
| RSI REINSPECTION 2 | ¤75.00 | 06/05/2026 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 12/03/2025 |
| SCHOOL BOARD IMPACT FEE RES | ¤5,450.00 | 12/03/2025 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,385.00 | 12/03/2025 |
| SURCHARGE FS 533.721 | ¤12.37 | 12/03/2025 |
| SURCHARGE - FS 468.631 | ¤18.56 | 12/03/2025 |
| SW ENG RES REVIEW 240 | ¤240.00 | 12/03/2025 |
| WATER METER W/ TAP | ¤2,326.93 | 12/03/2025 |
| TRANSP RES IMPACT FEE 10-25 | ¤6,789.77 | 12/03/2025 |
| SEWER CREDIT | (¤2,455.04) | 12/03/2025 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 12/03/2025 |
| WASTEWATER PERM REVIEW | ¤25.00 | 12/03/2025 |
| SEWER CAPITAL FACILITY | ¤4,415.00 | 12/03/2025 |
| WATER CREDIT | (¤10.71) | 12/03/2025 |
| WATER CAPITAL FACILITY FEE | ¤3,790.49 | 12/03/2025 |
| WATER PERMIT REVIEW | ¤25.00 | 12/03/2025 |
| WATER MAIN EXTENSION IMPACT | ¤917.27 | 12/03/2025 |
| SITE PLAN 30 | ¤30.00 | 12/03/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 12/03/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 12/03/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 12/03/2025 |
| FIRE RES IMPACT FEE 10-25 | ¤942.00 | 12/03/2025 |
| PEP TANK INSTALL | ¤756.74 | 12/03/2025 |
| PARKS IMPACT FEE 10-25 | ¤3,164.00 | 12/03/2025 |
| RSI DRIVEWAY AFTER POUR | ¤16.25 | 12/03/2025 |
| RSE DRIVE PRE POUR INSPECTION | ¤32.50 | 12/03/2025 |
| RSI FIELD SURVEY INSPECTION | ¤48.75 | 12/03/2025 |
| RSI FORMBOARD REVIEW | ¤16.25 | 12/03/2025 |
| RSI PLAN REVIEW NEW | ¤48.75 | 12/03/2025 |
| RSI FNL SURVEY/GRADING CERT | ¤48.75 | 12/03/2025 |
| WATER- TURN ON | ¤50.00 | 12/03/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 12/03/2025 |
| INSPECTION - RESIDENTIAL | ¤940.50 | 12/03/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤266.76 | 12/03/2025 |
| RSI REINSPECTION 1 | ¤35.00 | |
| Fees | Total Due: ¤35.00 | Total Paid: ¤31,442.64 |