I want to search for...

Permit #2025100382

Permit Details

Status: COED

Parcel Id: 04-11-30-5571-00000-1740
CONDITIONED SPACE: 2003 sqft
GARAGE: 477 sqft
OPENED PORCH (WITH ROOF) : 78 sqft
OPENED PORCH (WITH ROOF) : 112 sqft
Total Square Footage: 2670 sqft
Subdivision: 2366 - SOMERSET SUBDIVISION PH 2
Job Phone: 904-596-6645
Location Address: 94 TEA OLIVE DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/08/2025
NOC: RECORDED
Applicant name: MICHAEL T HOLDER
Owner: KB HOME JACKSONVILLE LLC

Address

10475 FORTUNE PARKWAY

JACKSONVILLE, FL 32256

Address

SUITE 100

JACKSONVILLE, FL 32256

Lot: 174
Contracted Stated Job Value: ¤140,000.00
Job Description: SINGLE FAMILY DWELLING
Type: CN

Contractor

KB HOME JACKSONVILLE, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

10475 FORTUNE PKWY

JACKSONVILLE, FL 32256

SUITE 100

JACKSONVILLE, FL 32256

CGC1509034 (Exp: 08/31/2026) 904-596-6645

Sub Contractors

BOBBY WAYNE CAMPBELL
Status Location Address State License Number Phone
ACTIVE

117 GUTHRIE ROAD

GREEN COVE SPRINGS, FL 32043

CCC1326752 (Exp: 08/31/2026) 904-200-1600
LARRY WILLIAMS
Status Location Address State License Number Phone
ACTIVE

1750 EMERSON ST

JACKSONVILLE, FL 32207

LI45034 (Exp: 08/31/2026) 904-721-5431
COREY MICHAEL TENNANT
Status Location Address State License Number Phone
ACTIVE

3370 AGRICULTURAL CNETER DR

ST AUGUSTINE, FL 32092

CAC1819063 (Exp: 08/31/2026) 904-829-8898
BENJAMIN MICHAEL RAY
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

6310 MABLETON PKWY

JACKSONVILLE, FL 32216

SUITE 1000

MABLETON, GA 30126

CFC1428415 (Exp: 08/31/2026) 904-861-5421 904-861-5426
JAMES E LINTON
Status Location Address State License Number Phone
ACTIVE

200 COLLEGE DR

ORANGE PARK, FL 32065

EC0001152 (Exp: 08/31/2026) 904-272-0272

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 03/06/2026 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - FINAL INSPECTION 03/06/2026 Disapproved -FEE REQUIRED TPOLACEK
Note: 03-06-26 TPOLACEK*** AS STATED IN FIELD SURVEY NOTES FINAL INSPECTION WILL NOT BE APPROVED UNTIL AREA BEHIND WATER METER IS FILLED IN AND STABILIZED. nOTE TO INSPECTOR ** BEFORE ROW STORMWATER FINAL BUILDER IS REQUIRED TO SOD EXPOSED ALL EXPOSED EARTH IN REAR BETWEEN POND AND TOP OF BANK EROSION IS ALREADY OCCURING ** NEED TO FILL HOLE AT UTILITY BOX LEFT FRONT LAWN
ROW - FINAL INSPECTION 03/06/2026 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 3/6/2026 - PREVIOUS INSPECTION NOTES 03-06-26 TPOLACEK*** AS STATED IN FIELD SURVEY NOTES FINAL INSPECTION WILL NOT BE APPROVED UNTIL AREA BEHIND WATER METER IS FILLED IN AND STABILIZED. nOTE TO INSPECTOR ** BEFORE ROW STORMWATER FINAL BUILDER IS REQUIRED TO SOD EXPOSED ALL EXPOSED EARTH IN REAR BETWEEN POND AND TOP OF BANK EROSION IS ALREADY OCCURING ** NEED TO FILL HOLE AT UTILITY BOX LEFT FRONT LAWN
U -UTILITY RESIDENTIAL FINAL 03/05/2026 FINAL APPROVED BWRIGHT
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/04/2026 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 03/04/2026 APPROVED EMADISON
Note: ** 03/04/26 BEFORE ROW STORMWATER FINAL BUILDER IS REQUIRED TO SOD EXPOSED ALL EXPOSED EARTH IN REAR BETWEEN POND AND TOP OF BANK EROSION IS ALREADY OCCURING ** NEED TO FILL HOLE AT UTILITY BOX LEFT FRONT LAWN
BLD - BUILDING FINAL 02/25/2026 FINAL APPROVED JSTEWART
Note: 2/24/2026 - PREVIOUS INSPECTION NOTES 1. Master shower drain cover needs secured in place. FBC P2708 2. Need a lockout at breakers for counter top range, and cabinet oven. NEC 422.31(B) 3. No plans. FBC [A]107.3.1 4. No energy calcs.
U-CROSS CONNECTION 02/24/2026 APPROVED BWRIGHT
BLD - BUILDING FINAL 02/24/2026 Disapproved - NO FEE JSTEWART
Note: 1. Master shower drain cover needs secured in place. FBC P2708 2. Need a lockout at breakers for counter top range, and cabinet oven. NEC 422.31(B) 3. No plans. FBC [A]107.3.1 4. No energy calcs.
ELECTRIC - EARLY POWER 02/19/2026 APPROVED JSTEWART
Note: 2/17/2026 - PREVIOUS INSPECTION NOTES 1. front entry coach lights require covers. 2. Porch Lights require covers. NEC 110.27 New inspection due to canceled inspection Inspector Notes from Inspection 2200 Authorize release of email.
LATH/BRICK/ WATER BARRIER 02/18/2026 APPROVED JSTEWART
Note: New inspection due to canceled inspection For stone work, after siding is installed.
ELECTRIC - EARLY POWER 02/17/2026 Disapproved - NO FEE JSTEWART
Note: 1. front entry coach lights require covers. 2. Porch Lights require covers. NEC 110.27 New inspection due to canceled inspection Inspector Notes from Inspection 2200 Authorize release of email.
ROW- PRE-APRON (PRE-POUR) 02/10/2026 APPROVED - AS NOTED TPOLACEK
Note: 02-10-26 TPOLACEK*** CONTRACTOR WAS PARKED ON FORMBOARDS. CM HAD THEM MOVE TRUCK AND A BOARD WAS KNOCKED OFF. I SPOKE WITH CM ON SITE AND WILL APPROVE AS NOTED THAT BOARD WILL BE FIXED AND 6" THROUGHOUT THE ROW WILL BE ACHIEVED. AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. . TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, IN THE UPCOMING MONTHS THE DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS WILL BE REQUIRED TO BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. YOU WILL RECEIVE A NEWS BLAST WHEN THIS BECOMES NECESSARY
U-CROSS CONNECTION 01/30/2026 CANCELLED BY APPLICANT WEB
ELECTRIC - EARLY POWER 01/30/2026 CANCELLED BY APPLICANT WEB
Note: Inspector Notes from Inspection 2200 Authorize release of email.
LATH/BRICK/ WATER BARRIER 01/30/2026 CANCELLED BY APPLICANT WEB
Note: For stone work, after siding is installed.
INSULATION 01/28/2026 APPROVED JSTEWART
Note: 1/26/2026 - PREVIOUS INSPECTION NOTES 1. Baffles at Bat insulation need repaired, required a min of 1" clearence for air flow. (completly blocked) FBC R402.2.3 / FBC R806.3 2. Previous Note not rectified.....3. Hood exhaust duct is installed backwards, lap is to be in the direction of flow. M1601.4.2 Inspector Notes from Inspection *** NOTES ADDED BY JSTEWART 1/22/2026 12:50:21 PM *** Added a additional Lath Brick water barrier for stonework. Okay to run siding. Inspector Notes from Inspection 2420 1. No water supply preassure test. FBCR P2503.5 2. No 5ft head test. FBCR P2503.7 3. Hood exhaust duct is installed backwards, lap is to be in the direction of flow. M1601.4.2 4. Please secure gas pipe for Stove at connection point. FBCR G2418.2 5. Gas Bond is not connected. FBCR G2411 6. Please reseal spare bath exhaust duct at roof penetration, and re strap. FBCR M1601.4.1 All Items need corrected prior to Insulation. Inspector Notes from Inspection 2467 Please have all roof to wall flashing sealed prior to Lath/Brick/water barrier.
INSULATION 01/26/2026 Disapproved -FEE REQUIRED JSTEWART
Note: 1. Baffles at Bat insulation need repaired, required a min of 1" clearence for air flow. (completly blocked) FBC R402.2.3 / FBC R806.3 2. Previous Note not rectified.....3. Hood exhaust duct is installed backwards, lap is to be in the direction of flow. M1601.4.2 Inspector Notes from Inspection *** NOTES ADDED BY JSTEWART 1/22/2026 12:50:21 PM *** Added a additional Lath Brick water barrier for stonework. Okay to run siding. Inspector Notes from Inspection 2420 1. No water supply preassure test. FBCR P2503.5 2. No 5ft head test. FBCR P2503.7 3. Hood exhaust duct is installed backwards, lap is to be in the direction of flow. M1601.4.2 4. Please secure gas pipe for Stove at connection point. FBCR G2418.2 5. Gas Bond is not connected. FBCR G2411 6. Please reseal spare bath exhaust duct at roof penetration, and re strap. FBCR M1601.4.1 All Items need corrected prior to Insulation. Inspector Notes from Inspection 2467 Please have all roof to wall flashing sealed prior to Lath/Brick/water barrier.
ELECTRIC-TUG 01/26/2026 APPROVED - AS NOTED JSTEWART
Note: Authorize release of email.
LATH/BRICK/ WATER BARRIER 01/22/2026 APPROVED - AS NOTED JSTEWART
Note: *** NOTES ADDED BY JSTEWART 1/22/2026 12:50:21 PM *** Added a additional Lath Brick water barrier for stonework. Okay to run siding. Inspector Notes from Inspection 2420 1. No water supply preassure test. FBCR P2503.5 2. No 5ft head test. FBCR P2503.7 3. Hood exhaust duct is installed backwards, lap is to be in the direction of flow. M1601.4.2 4. Please secure gas pipe for Stove at connection point. FBCR G2418.2 5. Gas Bond is not connected. FBCR G2411 6. Please reseal spare bath exhaust duct at roof penetration, and re strap. FBCR M1601.4.1 All Items need corrected prior to Insulation. Inspector Notes from Inspection 2467 Please have all roof to wall flashing sealed prior to Lath/Brick/water barrier.
ALL ROUGH 01/21/2026 APPROVED - AS NOTED JSTEWART
Note: 1. No water supply preassure test. FBCR P2503.5 2. No 5ft head test. FBCR P2503.7 3. Hood exhaust duct is installed backwards, lap is to be in the direction of flow. M1601.4.2 4. Please secure gas pipe for Stove at connection point. FBCR G2418.2 5. Gas Bond is not connected. FBCR G2411 6. Please reseal spare bath exhaust duct at roof penetration, and re strap. FBCR M1601.4.1 All Items need corrected prior to Insulation. Inspector Notes from Inspection 2467 Please have all roof to wall flashing sealed prior to Lath/Brick/water barrier.
GRAVITY SEWER TEST 01/20/2026 APPROVED JSTEWART
Note: Live virtual
SEWER TIE IN 01/20/2026 APPROVED JSTEWART
Note: Live virtual
ROOF VALLEY & METAL 01/20/2026 APPROVED - AS NOTED JSTEWART
Note: Please have all roof to wall flashing sealed prior to Lath/Brick/water barrier.
WALL SHEATHING 01/13/2026 APPROVED JSTEWART
Note: Inspector Notes from Inspection 2250 Live virtual Re inspection......corrections made and approved. 12/30/2025 - PREVIOUS INSPECTION NOTES 1. Reinforcement at garage stem wall (both sides) require 1 1/2" clearence from form boards. 2. Missing 1 #4 bar at garage curb change per plan SD1 detail Q. 3. Back reinforcment is displaced in footer, please adjust and fix chairs.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/13/2026 APPROVED JSTEWART
Note: Inspector Notes from Inspection 2250 Live virtual Re inspection......corrections made and approved. 12/30/2025 - PREVIOUS INSPECTION NOTES 1. Reinforcement at garage stem wall (both sides) require 1 1/2" clearence from form boards. 2. Missing 1 #4 bar at garage curb change per plan SD1 detail Q. 3. Back reinforcment is displaced in footer, please adjust and fix chairs.
MONOLITHIC SLAB 12/30/2025 Disapproved - NO FEE JSTEWART
Note: 1. Reinforcement at garage stem wall (both sides) require 1 1/2" clearence from form boards. 2. Missing 1 #4 bar at garage curb change per plan SD1 detail Q. 3. Back reinforcment is displaced in footer, please adjust and fix chairs.
MONOLITHIC SLAB 12/30/2025 APPROVED - AS NOTED JSTEWART
Note: Live virtual Re inspection......corrections made and approved. 12/30/2025 - PREVIOUS INSPECTION NOTES 1. Reinforcement at garage stem wall (both sides) require 1 1/2" clearence from form boards. 2. Missing 1 #4 bar at garage curb change per plan SD1 detail Q. 3. Back reinforcment is displaced in footer, please adjust and fix chairs.
PLUMBING 1ST ROUGH UNDERGROUND 12/18/2025 APPROVED JSTEWART
WATER METER INSTALLATION REQUEST 12/18/2025 APPROVED BVITALE
FORMBOARD SURVEY (OFFICE USE ONLY) 12/15/2025 APPROVED RRICKS

Review History

Department Status Date In Date Out
SW1 COMPLETE 12/15/2025 12/15/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 12/15/2025 12/15/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
URB COMPLETE 11/26/2025 12/03/2025
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM
ZON COMPLETE 11/26/2025 11/26/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
URB HOLD 11/13/2025 11/20/2025
Note: Held By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM (JB) NEED TO ADD ONE 3 GALLON SHRUB TO THE FRONT FOUNDATION FOR A TOTAL OF 8
BADMIN INFORMATION 11/07/2025 11/07/2025
Note: Marked INFORMATION By: JAZMIN ROSARIO - - JROSARIO@PALMCOASTGOV.COM revision form was submitted but without updated documents.
GAS COMPLETE 10/27/2025 10/27/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
URB HOLD 10/27/2025 11/03/2025
Note: Held By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM (JB) NEED TO ADD ONE 3 GALLON SHRUB TO THE FRONT FOUNDATION FOR A TOTAL OF 8
ZON COMPLETE 10/27/2025 10/27/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 10/14/2025 10/20/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
CUSVC COMPLETE 10/14/2025 10/16/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 10/14/2025 10/20/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/14/2025 10/14/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS HOLD 10/14/2025 10/16/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Gas subcontractor needs to be the one to do the gas riser diagram. Subcontractor license does not match
LOCATE COMPLETE 10/14/2025 10/16/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 10/14/2025 10/16/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 10/14/2025 10/20/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 10/14/2025 10/15/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
URB HOLD 10/14/2025 10/17/2025
Note: Held By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM (JB) NEED TO ADD ONE 3 GALLON SHRUB TO THE FRONT FOUNDATION FOR A TOTAL OF 8

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 03/07/2026
RSI REINSPECTION 1 ¤35.00 03/07/2026
RSI ROW FINAL INSPECTION ¤16.25 12/08/2025
SCHOOL BOARD IMPACT FEE RES ¤5,450.00 12/08/2025
SURCHARGE FS 533.721 ¤14.03 12/08/2025
SURCHARGE - FS 468.631 ¤21.05 12/08/2025
TRANSP RES IMPACT FEE 10-25 ¤7,551.31 12/08/2025
WASTEWATER PERM INSPECTION ¤80.00 12/08/2025
WASTEWATER PERM REVIEW ¤25.00 12/08/2025
SEWER CAPITAL FACILITY ¤3,628.86 12/08/2025
WATER CAPITAL FACILITY FEE ¤3,091.14 12/08/2025
WATER PERMIT REVIEW ¤25.00 12/08/2025
SITE PLAN 30 ¤30.00 12/08/2025
FC IMPACT FEE EMS ¤62.00 12/08/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 12/08/2025
FC IMPACT FEE LIBRARY ¤268.00 12/08/2025
FIRE RES IMPACT FEE 10-25 ¤942.00 12/08/2025
WATER METER W/OUT TAP ¤965.03 12/08/2025
PARKS IMPACT FEE 10-25 ¤3,164.00 12/08/2025
RECLAIM WATER PERMIT INSPECTIO ¤40.00 12/08/2025
RSI DRIVEWAY AFTER POUR ¤16.25 12/08/2025
RSE DRIVE PRE POUR INSPECTION ¤32.50 12/08/2025
RSI FIELD SURVEY INSPECTION ¤48.75 12/08/2025
RSI FORMBOARD REVIEW ¤16.25 12/08/2025
RSI PLAN REVIEW NEW ¤48.75 12/08/2025
RSI FNL SURVEY/GRADING CERT ¤48.75 12/08/2025
WATER-METER ¤874.47 12/08/2025
WATER- TURN ON ¤50.00 12/08/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 12/08/2025
INSPECTION - RESIDENTIAL ¤1,069.75 12/08/2025
PLAN REVIEW - RESIDENTIAL ¤303.42 12/08/2025
Fees Total Due: ¤0.00 Total Paid: ¤28,205.56