I want to search for...

Permit #2025100384

Permit Details

Status: INSPECT

Parcel Id: 07-11-31-7065-00180-0210
OPENED PORCH (WITH ROOF) : 249 sqft
GARAGE: 759 sqft
CONDITIONED SPACE: 1873 sqft
Total Square Footage: 2881 sqft
Block: 00180
Subdivision: 7065 -
Job Phone: 352-433-8382
Location Address: 91 KASHMIR TRL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 11/04/2025
NOC: RECORDED
Applicant name: ALFREDO E SCHEER
Owner: GONZALEZ WILLIAM & LAURA LY

Address

52 LU MANOR DRIVE

FAIRFIELD, CT 06432

Lot: 0210
Contracted Stated Job Value: ¤165,000.00
Job Description: Single Family
Type: CN

Contractor

ESTELA LIVING LLC
Status Location Address State License Number Phone
ACTIVE

237 S. DIXIE HWY, 4TH FLOOR

CORAL GABLES, FL 33133

CGC1534535 (Exp: 08/31/2026) 352-433-8382

Sub Contractors

JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
JOSEPH H STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PKWY

SANFORD, FL 32771

CAC043953 (Exp: 08/31/2026) 877-906-1113
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629

Inspection History

Type Request Date Result Inspector
ROW- PRE-APRON (PRE-POUR) 06/08/2026 APPROVED - AS NOTED FSLADISH
Note: 6/8/26 MINOR CORRECTION REQUIRED TO BRING FRONT FORM CLOSER TO ROAD EDGE OF LEFT SIDE. SPOKE TO JIM CM AND HIS FRAMERS ARE CLOSEBY. BECAUSE THIS IS THE ONLY ISSUE I AM GOING TO APPROVE IT AS NOTED IT WILL BE CORRECTED TODAY. PHOTO FOR REFERENCE. PIPE INVERT IS GOOD AT TIME OF THIS INSPECTION. BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED. DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER AND VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. 6/4/2026 - PREVIOUS INSPECTION NOTES 6/4/26 RECEIVED MESSAGE FROM JIM CM TO PLEASE CANCEL THIS PREPOUR INSPECTION FOR TODAY. CANCELLING AS A COURTESY DUE TO COMMUNICATION WITH INSPECTOR.
ROW- PRE-APRON (PRE-POUR) 06/04/2026 CANCELLED BY APPLICANT FSLADISH
Note: 6/4/26 RECEIVED MESSAGE FROM JIM CM TO PLEASE CANCEL THIS PREPOUR INSPECTION FOR TODAY. CANCELLING AS A COURTESY DUE TO COMMUNICATION WITH INSPECTOR.
GRAVITY SEWER TEST 05/27/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 5/27/2026 11:55:21 AM *** Approved
SEWER TIE IN 05/27/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 5/27/2026 11:55:44 AM *** Approved
ELECTRIC - EARLY POWER 05/26/2026 APPROVED RMARTIN
Note: 5/22/2026 - PREVIOUS INSPECTION NOTES Electrical panel in garage is the wrong size, only holding on by 2 top screws, large opening at the bottom.... also drywall and insulation is removed from guest bathroom block wall. Please contact me at 386-986-7848
ELECTRIC - EARLY POWER 05/22/2026 Disapproved - NO FEE RMARTIN
Note: Electrical panel in garage is the wrong size, only holding on by 2 top screws, large opening at the bottom.... also drywall and insulation is removed from guest bathroom block wall. Please contact me at 386-986-7848
PEP TANK INSTALLATION REQUEST 05/05/2026 APPROVED ISANDERSON
INSULATION 04/09/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 4/9/2026 2:11:31 PM *** Approved 4/6/2026 - PREVIOUS INSPECTION NOTES 4/6/26: Cancelled by Applicant via phone call at @ 0953. Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 3/31/2026 12:29:30 PM *** 3/31/26: Check at Insulation Inspection. 1). 5ft head pressure is not holding. FBC-P2503.5.1 2). Guest bathroom > slab at tub needs excess dirt removed from opening for tub waste and floor needs to be repaired with concrete to meet slab / termite requirements. FBC R506.1/ FBCR 318
LATH/BRICK/ WATER BARRIER 04/07/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 4/7/2026 2:44:20 PM *** Approved
INSULATION 04/06/2026 CANCELLED BY APPLICANT RSIMS
Note: *** NOTES ADDED BY RSIMS 4/6/2026 9:59:56 AM *** 4/6/26: Cancelled by Applicant via phone call at @ 0953. Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 3/31/2026 12:29:30 PM *** 3/31/26: Check at Insulation Inspection. 1). 5ft head pressure is not holding. FBC-P2503.5.1 2). Guest bathroom > slab at tub needs excess dirt removed from opening for tub waste and floor needs to be repaired with concrete to meet slab / termite requirements. FBC R506.1/ FBCR 318
ALL ROUGH 03/31/2026 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 3/31/2026 12:29:30 PM *** 3/31/26: Check at Insulation Inspection. 1). 5ft head pressure is not holding. FBC-P2503.5.1 2). Guest bathroom > slab at tub needs excess dirt removed from opening for tub waste and floor needs to be repaired with concrete to meet slab / termite requirements. FBC R506.1/ FBCR 318
ROOF VALLEY & METAL 03/30/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 3/27/2026 12:23:27 PM *** 3/27/26: Virtually approved via FaceTime video/audio phone app at @ 1220. 3/26/2026 - PREVIOUS INSPECTION NOTES 3/26/26: This inspection was for underlayment, etc. review due to installation prior to approved inspection. A minimum of a Live Virtual inspection will be performed to view the inspection areas prior to re-shingling the areas. __________________________________________________________________________________________________________________________ 3/25/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2430 3/25/26: Cancelled by Applicant via phone call at @ 0848. Roofer not available at timeframe. CM will reschedule. *** NOTES ADDED BY RSIMS 3/19/2026 1:43:40 PM *** 3/19/26: Please have portable toilet uprighted as required. FBC-P311.1 3/17/2026 - PREVIOUS INSPECTION NOTES 3/17/26: 1). B1 repair does not meet Alpine repair requirements provided by the engineer. The plywood squares are not installed to the correct orientation shown on the repair plan. 3/12/2026 - PREVIOUS INSPECTION NOTES 3/12/26: Cancelled by Applicant via phone call at @ 12:23 Inspector Notes from Inspection 2465 *** NOTES ADDED BY RSIMS 3/11/2026 12:35:51 PM *** 3/11/26: THIS INSPECTION WAS ALREADY APPROVED. ADDED A FRAMING INSPECTION TO CHECK TRUSS REPAIR FOR THE MISPLACED TRUSSES. TRUSSES ARE NOT REPAIRED AS PER THE ENGINEERING REQUIREMENTS. ALSO PLEASE ASSURE THAT THE ENGINEER'S REPAIR LETTER IS WITH PLANS IN PERMIT BOX. Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 2/25/2026 11:09:26 AM *** 2/25/26: Check at All Rough. Ok to dry-in. 1). Revision required for the B1 / B3 trusses that are not placed as shown on the MiTek truss layout. FBC [A]107.4 2). The B02 truss previously mentioned has a strap at the front of the house that is not fastened to the truss as required. Engineer's revision required. FBC [A]107.4 3). B02/B03 truss that are missing a splice plate will need Engineer's detail submitted to and Approved by the City. FBC [A]107.4 2/18/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- Trusses #1 and #2 are switch placement , please fix or have new trusses layout summit for revision and approval #2- straps on B02 not secured by factory installation #3-FBC [A]107.4-REMOVE SHINERS - EXCEPT ZIP BOARD ( mark on roof deck with red sharpie market #4-FBC 3303.5-SWALE CLEAR ( dumpters was drop on swale )
ROOF VALLEY & METAL 03/26/2026 PARTIALLY APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 3/26/2026 10:51:03 AM *** 3/26/26: This inspection was for underlayment, etc. review due to installation prior to approved inspection. A minimum of a Live Virtual inspection will be performed to view the inspection areas prior to re-shingling the areas. __________________________________________________________________________________________________________________________ 3/25/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2430 3/25/26: Cancelled by Applicant via phone call at @ 0848. Roofer not available at timeframe. CM will reschedule. *** NOTES ADDED BY RSIMS 3/19/2026 1:43:40 PM *** 3/19/26: Please have portable toilet uprighted as required. FBC-P311.1 3/17/2026 - PREVIOUS INSPECTION NOTES 3/17/26: 1). B1 repair does not meet Alpine repair requirements provided by the engineer. The plywood squares are not installed to the correct orientation shown on the repair plan. 3/12/2026 - PREVIOUS INSPECTION NOTES 3/12/26: Cancelled by Applicant via phone call at @ 12:23 Inspector Notes from Inspection 2465 *** NOTES ADDED BY RSIMS 3/11/2026 12:35:51 PM *** 3/11/26: THIS INSPECTION WAS ALREADY APPROVED. ADDED A FRAMING INSPECTION TO CHECK TRUSS REPAIR FOR THE MISPLACED TRUSSES. TRUSSES ARE NOT REPAIRED AS PER THE ENGINEERING REQUIREMENTS. ALSO PLEASE ASSURE THAT THE ENGINEER'S REPAIR LETTER IS WITH PLANS IN PERMIT BOX. Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 2/25/2026 11:09:26 AM *** 2/25/26: Check at All Rough. Ok to dry-in. 1). Revision required for the B1 / B3 trusses that are not placed as shown on the MiTek truss layout. FBC [A]107.4 2). The B02 truss previously mentioned has a strap at the front of the house that is not fastened to the truss as required. Engineer's revision required. FBC [A]107.4 3). B02/B03 truss that are missing a splice plate will need Engineer's detail submitted to and Approved by the City. FBC [A]107.4 2/18/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- Trusses #1 and #2 are switch placement , please fix or have new trusses layout summit for revision and approval #2- straps on B02 not secured by factory installation #3-FBC [A]107.4-REMOVE SHINERS - EXCEPT ZIP BOARD ( mark on roof deck with red sharpie market #4-FBC 3303.5-SWALE CLEAR ( dumpters was drop on swale )
ROOF VALLEY & METAL 03/25/2026 CANCELLED BY APPLICANT RSIMS
Note: *** NOTES ADDED BY RSIMS 3/25/2026 8:49:55 AM *** Inspector Notes from Inspection 2430 3/25/26: Cancelled by Applicant via phone call at @ 0848. Roofer not available at timeframe. CM will reschedule. *** NOTES ADDED BY RSIMS 3/19/2026 1:43:40 PM *** 3/19/26: Please have portable toilet uprighted as required. FBC-P311.1 3/17/2026 - PREVIOUS INSPECTION NOTES 3/17/26: 1). B1 repair does not meet Alpine repair requirements provided by the engineer. The plywood squares are not installed to the correct orientation shown on the repair plan. 3/12/2026 - PREVIOUS INSPECTION NOTES 3/12/26: Cancelled by Applicant via phone call at @ 12:23 Inspector Notes from Inspection 2465 *** NOTES ADDED BY RSIMS 3/11/2026 12:35:51 PM *** 3/11/26: THIS INSPECTION WAS ALREADY APPROVED. ADDED A FRAMING INSPECTION TO CHECK TRUSS REPAIR FOR THE MISPLACED TRUSSES. TRUSSES ARE NOT REPAIRED AS PER THE ENGINEERING REQUIREMENTS. ALSO PLEASE ASSURE THAT THE ENGINEER'S REPAIR LETTER IS WITH PLANS IN PERMIT BOX. Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 2/25/2026 11:09:26 AM *** 2/25/26: Check at All Rough. Ok to dry-in. 1). Revision required for the B1 / B3 trusses that are not placed as shown on the MiTek truss layout. FBC [A]107.4 2). The B02 truss previously mentioned has a strap at the front of the house that is not fastened to the truss as required. Engineer's revision required. FBC [A]107.4 3). B02/B03 truss that are missing a splice plate will need Engineer's detail submitted to and Approved by the City. FBC [A]107.4 2/18/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- Trusses #1 and #2 are switch placement , please fix or have new trusses layout summit for revision and approval #2- straps on B02 not secured by factory installation #3-FBC [A]107.4-REMOVE SHINERS - EXCEPT ZIP BOARD ( mark on roof deck with red sharpie market #4-FBC 3303.5-SWALE CLEAR ( dumpters was drop on swale )
FRAMING 03/19/2026 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 3/19/2026 1:43:40 PM *** 3/19/26: Please have portable toilet uprighted as required. FBC-P311.1 3/17/2026 - PREVIOUS INSPECTION NOTES 3/17/26: 1). B1 repair does not meet Alpine repair requirements provided by the engineer. The plywood squares are not installed to the correct orientation shown on the repair plan. 3/12/2026 - PREVIOUS INSPECTION NOTES 3/12/26: Cancelled by Applicant via phone call at @ 12:23 Inspector Notes from Inspection 2465 *** NOTES ADDED BY RSIMS 3/11/2026 12:35:51 PM *** 3/11/26: THIS INSPECTION WAS ALREADY APPROVED. ADDED A FRAMING INSPECTION TO CHECK TRUSS REPAIR FOR THE MISPLACED TRUSSES. TRUSSES ARE NOT REPAIRED AS PER THE ENGINEERING REQUIREMENTS. ALSO PLEASE ASSURE THAT THE ENGINEER'S REPAIR LETTER IS WITH PLANS IN PERMIT BOX. Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 2/25/2026 11:09:26 AM *** 2/25/26: Check at All Rough. Ok to dry-in. 1). Revision required for the B1 / B3 trusses that are not placed as shown on the MiTek truss layout. FBC [A]107.4 2). The B02 truss previously mentioned has a strap at the front of the house that is not fastened to the truss as required. Engineer's revision required. FBC [A]107.4 3). B02/B03 truss that are missing a splice plate will need Engineer's detail submitted to and Approved by the City. FBC [A]107.4 2/18/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- Trusses #1 and #2 are switch placement , please fix or have new trusses layout summit for revision and approval #2- straps on B02 not secured by factory installation #3-FBC [A]107.4-REMOVE SHINERS - EXCEPT ZIP BOARD ( mark on roof deck with red sharpie market #4-FBC 3303.5-SWALE CLEAR ( dumpters was drop on swale )
FRAMING 03/17/2026 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 3/17/2026 10:13:04 AM *** 3/17/26: 1). B1 repair does not meet Alpine repair requirements provided by the engineer. The plywood squares are not installed to the correct orientation shown on the repair plan. 3/12/2026 - PREVIOUS INSPECTION NOTES 3/12/26: Cancelled by Applicant via phone call at @ 12:23 Inspector Notes from Inspection 2465 *** NOTES ADDED BY RSIMS 3/11/2026 12:35:51 PM *** 3/11/26: THIS INSPECTION WAS ALREADY APPROVED. ADDED A FRAMING INSPECTION TO CHECK TRUSS REPAIR FOR THE MISPLACED TRUSSES. TRUSSES ARE NOT REPAIRED AS PER THE ENGINEERING REQUIREMENTS. ALSO PLEASE ASSURE THAT THE ENGINEER'S REPAIR LETTER IS WITH PLANS IN PERMIT BOX. Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 2/25/2026 11:09:26 AM *** 2/25/26: Check at All Rough. Ok to dry-in. 1). Revision required for the B1 / B3 trusses that are not placed as shown on the MiTek truss layout. FBC [A]107.4 2). The B02 truss previously mentioned has a strap at the front of the house that is not fastened to the truss as required. Engineer's revision required. FBC [A]107.4 3). B02/B03 truss that are missing a splice plate will need Engineer's detail submitted to and Approved by the City. FBC [A]107.4 2/18/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- Trusses #1 and #2 are switch placement , please fix or have new trusses layout summit for revision and approval #2- straps on B02 not secured by factory installation #3-FBC [A]107.4-REMOVE SHINERS - EXCEPT ZIP BOARD ( mark on roof deck with red sharpie market #4-FBC 3303.5-SWALE CLEAR ( dumpters was drop on swale )
ROOF VALLEY & METAL 03/12/2026 CANCELLED BY APPLICANT RSIMS
Note: *** NOTES ADDED BY RSIMS 3/12/2026 3:07:08 PM *** 3/12/26: Cancelled by Applicant via phone call at @ 12:23 Inspector Notes from Inspection 2465 *** NOTES ADDED BY RSIMS 3/11/2026 12:35:51 PM *** 3/11/26: THIS INSPECTION WAS ALREADY APPROVED. ADDED A FRAMING INSPECTION TO CHECK TRUSS REPAIR FOR THE MISPLACED TRUSSES. TRUSSES ARE NOT REPAIRED AS PER THE ENGINEERING REQUIREMENTS. ALSO PLEASE ASSURE THAT THE ENGINEER'S REPAIR LETTER IS WITH PLANS IN PERMIT BOX. Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 2/25/2026 11:09:26 AM *** 2/25/26: Check at All Rough. Ok to dry-in. 1). Revision required for the B1 / B3 trusses that are not placed as shown on the MiTek truss layout. FBC [A]107.4 2). The B02 truss previously mentioned has a strap at the front of the house that is not fastened to the truss as required. Engineer's revision required. FBC [A]107.4 3). B02/B03 truss that are missing a splice plate will need Engineer's detail submitted to and Approved by the City. FBC [A]107.4 2/18/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- Trusses #1 and #2 are switch placement , please fix or have new trusses layout summit for revision and approval #2- straps on B02 not secured by factory installation #3-FBC [A]107.4-REMOVE SHINERS - EXCEPT ZIP BOARD ( mark on roof deck with red sharpie market #4-FBC 3303.5-SWALE CLEAR ( dumpters was drop on swale )
FRAMING 03/12/2026 CANCELLED BY APPLICANT RSIMS
Note: *** NOTES ADDED BY RSIMS 3/12/2026 3:07:36 PM *** 3/12/26: Cancelled by Applicant via phone call at @ 12:23 Inspector Notes from Inspection 2465 *** NOTES ADDED BY RSIMS 3/11/2026 12:35:51 PM *** 3/11/26: THIS INSPECTION WAS ALREADY APPROVED. ADDED A FRAMING INSPECTION TO CHECK TRUSS REPAIR FOR THE MISPLACED TRUSSES. TRUSSES ARE NOT REPAIRED AS PER THE ENGINEERING REQUIREMENTS. ALSO PLEASE ASSURE THAT THE ENGINEER'S REPAIR LETTER IS WITH PLANS IN PERMIT BOX. Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 2/25/2026 11:09:26 AM *** 2/25/26: Check at All Rough. Ok to dry-in. 1). Revision required for the B1 / B3 trusses that are not placed as shown on the MiTek truss layout. FBC [A]107.4 2). The B02 truss previously mentioned has a strap at the front of the house that is not fastened to the truss as required. Engineer's revision required. FBC [A]107.4 3). B02/B03 truss that are missing a splice plate will need Engineer's detail submitted to and Approved by the City. FBC [A]107.4 2/18/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- Trusses #1 and #2 are switch placement , please fix or have new trusses layout summit for revision and approval #2- straps on B02 not secured by factory installation #3-FBC [A]107.4-REMOVE SHINERS - EXCEPT ZIP BOARD ( mark on roof deck with red sharpie market #4-FBC 3303.5-SWALE CLEAR ( dumpters was drop on swale )
WALL SHEATHING 03/11/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 3/11/2026 12:31:00 PM *** Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 2/25/2026 11:09:26 AM *** 2/25/26: Check at All Rough. Ok to dry-in. 1). Revision required for the B1 / B3 trusses that are not placed as shown on the MiTek truss layout. FBC [A]107.4 2). The B02 truss previously mentioned has a strap at the front of the house that is not fastened to the truss as required. Engineer's revision required. FBC [A]107.4 3). B02/B03 truss that are missing a splice plate will need Engineer's detail submitted to and Approved by the City. FBC [A]107.4 2/18/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- Trusses #1 and #2 are switch placement , please fix or have new trusses layout summit for revision and approval #2- straps on B02 not secured by factory installation #3-FBC [A]107.4-REMOVE SHINERS - EXCEPT ZIP BOARD ( mark on roof deck with red sharpie market #4-FBC 3303.5-SWALE CLEAR ( dumpters was drop on swale )
ROOF SHEATHING 03/11/2026 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 3/11/2026 12:35:51 PM *** 3/11/26: THIS INSPECTION WAS ALREADY APPROVED. ADDED A FRAMING INSPECTION TO CHECK TRUSS REPAIR FOR THE MISPLACED TRUSSES. TRUSSES ARE NOT REPAIRED AS PER THE ENGINEERING REQUIREMENTS. ALSO PLEASE ASSURE THAT THE ENGINEER'S REPAIR LETTER IS WITH PLANS IN PERMIT BOX. Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 2/25/2026 11:09:26 AM *** 2/25/26: Check at All Rough. Ok to dry-in. 1). Revision required for the B1 / B3 trusses that are not placed as shown on the MiTek truss layout. FBC [A]107.4 2). The B02 truss previously mentioned has a strap at the front of the house that is not fastened to the truss as required. Engineer's revision required. FBC [A]107.4 3). B02/B03 truss that are missing a splice plate will need Engineer's detail submitted to and Approved by the City. FBC [A]107.4 2/18/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- Trusses #1 and #2 are switch placement , please fix or have new trusses layout summit for revision and approval #2- straps on B02 not secured by factory installation #3-FBC [A]107.4-REMOVE SHINERS - EXCEPT ZIP BOARD ( mark on roof deck with red sharpie market #4-FBC 3303.5-SWALE CLEAR ( dumpters was drop on swale )
ROOF VALLEY & METAL 03/11/2026 CANCELLED BY APPLICANT WEB
Note: Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 2/25/2026 11:09:26 AM *** 2/25/26: Check at All Rough. Ok to dry-in. 1). Revision required for the B1 / B3 trusses that are not placed as shown on the MiTek truss layout. FBC [A]107.4 2). The B02 truss previously mentioned has a strap at the front of the house that is not fastened to the truss as required. Engineer's revision required. FBC [A]107.4 3). B02/B03 truss that are missing a splice plate will need Engineer's detail submitted to and Approved by the City. FBC [A]107.4 2/18/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- Trusses #1 and #2 are switch placement , please fix or have new trusses layout summit for revision and approval #2- straps on B02 not secured by factory installation #3-FBC [A]107.4-REMOVE SHINERS - EXCEPT ZIP BOARD ( mark on roof deck with red sharpie market #4-FBC 3303.5-SWALE CLEAR ( dumpters was drop on swale )
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/25/2026 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 2/25/2026 11:09:26 AM *** 2/25/26: Check at All Rough. Ok to dry-in. 1). Revision required for the B1 / B3 trusses that are not placed as shown on the MiTek truss layout. FBC [A]107.4 2). The B02 truss previously mentioned has a strap at the front of the house that is not fastened to the truss as required. Engineer's revision required. FBC [A]107.4 3). B02/B03 truss that are missing a splice plate will need Engineer's detail submitted to and Approved by the City. FBC [A]107.4 2/18/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- Trusses #1 and #2 are switch placement , please fix or have new trusses layout summit for revision and approval #2- straps on B02 not secured by factory installation #3-FBC [A]107.4-REMOVE SHINERS - EXCEPT ZIP BOARD ( mark on roof deck with red sharpie market #4-FBC 3303.5-SWALE CLEAR ( dumpters was drop on swale )
ROOF SHEATHING 02/18/2026 Disapproved - NO FEE CVANSTRAHLEN
Note: Notes are on roof sheathing bracing and tie downs inspection
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/18/2026 Disapproved - NO FEE CVANSTRAHLEN
Note: Please fix items before next inspection #1- Trusses #1 and #2 are switch placement , please fix or have new trusses layout summit for revision and approval #2- straps on B02 not secured by factory installation #3-FBC [A]107.4-REMOVE SHINERS - EXCEPT ZIP BOARD ( mark on roof deck with red sharpie market #4-FBC 3303.5-SWALE CLEAR ( dumpters was drop on swale )
WALL SHEATHING 02/18/2026 CANCELLED BY APPLICANT WEB
TIE BEAM / LINTEL 02/06/2026 APPROVED BTAYLOR
MONOLITHIC SLAB 01/30/2026 APPROVED MCONTRYMAN
PLUMBING 1ST ROUGH UNDERGROUND 01/28/2026 APPROVED BTAYLOR
ELECTRIC UNDERGROUND 01/28/2026 CANCELLED BY INSPECTOR BTAYLOR
Note: 1-28-26 1. This inspection is not needed.
FORMBOARD SURVEY (OFFICE USE ONLY) 01/27/2026 APPROVED RRICKS
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 01/20/2026 APPROVED PKNAPIK
WATER METER INSTALLATION REQUEST 11/13/2025 APPROVED CBOWERMASTER
U-CROSS CONNECTION
BLD - BUILDING FINAL
ROW - FINAL APRON (AFTER POUR)
ROW- FINAL SURVEY/GRADING CERTIFICATION
ROW - FINAL INSPECTION
U -UTILITY RESIDENTIAL FINAL

Review History

Department Status Date In Date Out
BLD COMPLETE 03/13/2026 03/18/2026
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 02/27/2026 03/04/2026
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
ZON COMPLETE 01/27/2026 01/27/2026
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
SW1 COMPLETE 01/27/2026 01/27/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
BLD COMPLETE 01/16/2026 01/20/2026
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BADMIN INFORMATION 11/12/2025 11/12/2025
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM for future NOC's, please be sure to complete the document with the owner address/contractor address completely and in the correct fields.
BLD COMPLETE 10/14/2025 10/20/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
CUSVC COMPLETE 10/14/2025 10/16/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 10/14/2025 10/20/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/14/2025 10/14/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 10/14/2025 10/16/2025
LOCATE COMPLETE 10/14/2025 10/16/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 10/14/2025 10/16/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 10/14/2025 10/20/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 10/14/2025 10/15/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
SWALE COMPLETE 10/14/2025 10/24/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
WATER- TURN ON ¤50.00 11/04/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 11/04/2025
INSPECTION - RESIDENTIAL ¤1,075.25 11/04/2025
PLAN REVIEW - RESIDENTIAL ¤304.98 11/04/2025
FC IMPACT FEE EMS ¤62.00 11/04/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 11/04/2025
FC IMPACT FEE LIBRARY ¤268.00 11/04/2025
FIRE RES IMPACT FEE 10-25 ¤942.00 11/04/2025
PEP TANK INSTALL ¤756.74 11/04/2025
PARKS IMPACT FEE 10-25 ¤3,164.00 11/04/2025
RSI DRIVEWAY AFTER POUR ¤16.25 11/04/2025
RSE DRIVE PRE POUR INSPECTION ¤32.50 11/04/2025
RSI FIELD SURVEY INSPECTION ¤48.75 11/04/2025
RSI FORMBOARD REVIEW ¤16.25 11/04/2025
RSI PLAN REVIEW NEW ¤48.75 11/04/2025
RSI FNL SURVEY/GRADING CERT ¤48.75 11/04/2025
RSI ROW FINAL INSPECTION ¤16.25 11/04/2025
SCHOOL BOARD IMPACT FEE RES ¤5,450.00 11/04/2025
WASTEWATER MAIN EXTENSION IMPA ¤2,385.00 11/04/2025
SURCHARGE FS 533.721 ¤14.10 11/04/2025
SURCHARGE - FS 468.631 ¤21.15 11/04/2025
SW ENG RES REVIEW 240 ¤240.00 11/04/2025
WATER METER W/ TAP ¤2,326.93 11/04/2025
TRANSP RES IMPACT FEE 10-25 ¤7,061.21 11/04/2025
SEWER CREDIT (¤2,465.75) 11/04/2025
WASTEWATER PERM INSPECTION ¤80.00 11/04/2025
WASTEWATER PERM REVIEW ¤25.00 11/04/2025
SEWER CAPITAL FACILITY ¤4,415.00 11/04/2025
WATER CAPITAL FACILITY FEE ¤3,790.49 11/04/2025
WATER PERMIT REVIEW ¤25.00 11/04/2025
WATER MAIN EXTENSION IMPACT ¤917.27 11/04/2025
SITE PLAN 30 ¤30.00 11/04/2025
SITE PLAN 30 ¤30.00 10/27/2025
SITE PLAN 30 (¤30.00) 10/27/2025
WATER MAIN EXTENSION IMPACT ¤917.27 10/27/2025
WATER MAIN EXTENSION IMPACT (¤917.27) 10/27/2025
WATER PERMIT REVIEW ¤25.00 10/27/2025
WATER PERMIT REVIEW (¤25.00) 10/27/2025
WATER CAPITAL FACILITY FEE ¤3,790.49 10/27/2025
WATER CAPITAL FACILITY FEE (¤3,790.49) 10/27/2025
SEWER CAPITAL FACILITY ¤4,415.00 10/27/2025
WASTEWATER PERM INSPECTION (¤80.00) 10/27/2025
WASTEWATER PERM REVIEW ¤25.00 10/27/2025
SEWER CAPITAL FACILITY (¤4,415.00) 10/27/2025
WASTEWATER PERM REVIEW (¤25.00) 10/27/2025
TRANSP RES IMPACT FEE 10-25 (¤7,061.21) 10/27/2025
SEWER CREDIT (¤2,465.75) 10/27/2025
WASTEWATER PERM INSPECTION ¤80.00 10/27/2025
SEWER CREDIT ¤2,465.75 10/27/2025
WATER METER W/ TAP (¤2,326.93) 10/27/2025
WATER METER W/ TAP ¤2,326.93 10/27/2025
TRANSP RES IMPACT FEE 10-25 ¤7,061.21 10/27/2025
SW ENG RES REVIEW 240 (¤240.00) 10/27/2025
SURCHARGE - FS 468.631 ¤21.15 10/27/2025
SW ENG RES REVIEW 240 ¤240.00 10/27/2025
SURCHARGE - FS 468.631 (¤21.15) 10/27/2025
SURCHARGE FS 533.721 (¤14.10) 10/27/2025
WASTEWATER MAIN EXTENSION IMPA ¤2,385.00 10/27/2025
WASTEWATER MAIN EXTENSION IMPA (¤2,385.00) 10/27/2025
SURCHARGE FS 533.721 ¤14.10 10/27/2025
SCHOOL BOARD IMPACT FEE RES (¤5,450.00) 10/27/2025
SCHOOL BOARD IMPACT FEE RES ¤5,450.00 10/27/2025
RSI ROW FINAL INSPECTION (¤16.25) 10/27/2025
RSI ROW FINAL INSPECTION ¤16.25 10/27/2025
RSI FORMBOARD REVIEW (¤16.25) 10/27/2025
RSI PLAN REVIEW NEW ¤48.75 10/27/2025
RSI FNL SURVEY/GRADING CERT ¤48.75 10/27/2025
RSI FNL SURVEY/GRADING CERT (¤48.75) 10/27/2025
RSI PLAN REVIEW NEW (¤48.75) 10/27/2025
RSI FIELD SURVEY INSPECTION ¤48.75 10/27/2025
RSI FORMBOARD REVIEW ¤16.25 10/27/2025
RSI FIELD SURVEY INSPECTION (¤48.75) 10/27/2025
RSE DRIVE PRE POUR INSPECTION (¤32.50) 10/27/2025
RSI DRIVEWAY AFTER POUR ¤16.25 10/27/2025
RSE DRIVE PRE POUR INSPECTION ¤32.50 10/27/2025
RSI DRIVEWAY AFTER POUR (¤16.25) 10/27/2025
PARKS IMPACT FEE 10-25 (¤3,164.00) 10/27/2025
PEP TANK INSTALL (¤756.74) 10/27/2025
FIRE RES IMPACT FEE 10-25 ¤942.00 10/27/2025
FIRE RES IMPACT FEE 10-25 (¤942.00) 10/27/2025
PEP TANK INSTALL ¤756.74 10/27/2025
PARKS IMPACT FEE 10-25 ¤3,164.00 10/27/2025
FC IMPACT FEE LAW ENFORCEMENT (¤218.00) 10/27/2025
FC IMPACT FEE LIBRARY ¤268.00 10/27/2025
FC IMPACT FEE LIBRARY (¤268.00) 10/27/2025
FC IMPACT FEE EMS ¤62.00 10/27/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 10/27/2025
FC IMPACT FEE EMS (¤62.00) 10/27/2025
PLAN REVIEW - RESIDENTIAL ¤304.98 10/27/2025
PLAN REVIEW - RESIDENTIAL (¤304.98) 10/27/2025
INSPECTION - RESIDENTIAL ¤1,075.25 10/27/2025
INSPECTION - RESIDENTIAL (¤1,075.25) 10/27/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 10/27/2025
ADMINISTRATIVE RESIDENTIAL (¤30.00) 10/27/2025
WATER- TURN ON ¤50.00 10/27/2025
WATER- TURN ON (¤50.00) 10/27/2025
WATER- TURN ON ¤50.00 10/22/2025
WATER- TURN ON (¤50.00) 10/22/2025
ADMINISTRATIVE RESIDENTIAL (¤30.00) 10/22/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 10/22/2025
INSPECTION - RESIDENTIAL ¤1,075.25 10/22/2025
PLAN REVIEW - RESIDENTIAL (¤304.98) 10/22/2025
INSPECTION - RESIDENTIAL (¤1,075.25) 10/22/2025
PLAN REVIEW - RESIDENTIAL ¤304.98 10/22/2025
FC IMPACT FEE EMS ¤62.00 10/22/2025
FC IMPACT FEE LAW ENFORCEMENT (¤218.00) 10/22/2025
FC IMPACT FEE EMS (¤62.00) 10/22/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 10/22/2025
FIRE RES IMPACT FEE 10-25 (¤942.00) 10/22/2025
FC IMPACT FEE LIBRARY (¤268.00) 10/22/2025
FC IMPACT FEE LIBRARY ¤268.00 10/22/2025
PEP TANK INSTALL (¤756.74) 10/22/2025
PARKS IMPACT FEE 10-25 ¤3,164.00 10/22/2025
PEP TANK INSTALL ¤756.74 10/22/2025
PARKS IMPACT FEE 10-25 (¤3,164.00) 10/22/2025
FIRE RES IMPACT FEE 10-25 ¤942.00 10/22/2025
RSI DRIVEWAY AFTER POUR (¤16.25) 10/22/2025
RSI DRIVEWAY AFTER POUR ¤16.25 10/22/2025
RSE DRIVE PRE POUR INSPECTION (¤32.50) 10/22/2025
RSE DRIVE PRE POUR INSPECTION ¤32.50 10/22/2025
RSI FORMBOARD REVIEW (¤16.25) 10/22/2025
RSI FIELD SURVEY INSPECTION ¤48.75 10/22/2025
RSI FIELD SURVEY INSPECTION (¤48.75) 10/22/2025
RSI FORMBOARD REVIEW ¤16.25 10/22/2025
RSI PLAN REVIEW NEW ¤48.75 10/22/2025
RSI FNL SURVEY/GRADING CERT ¤48.75 10/22/2025
RSI FNL SURVEY/GRADING CERT (¤48.75) 10/22/2025
RSI PLAN REVIEW NEW (¤48.75) 10/22/2025
SCHOOL BOARD IMPACT FEE RES (¤5,450.00) 10/22/2025
RSI ROW FINAL INSPECTION ¤16.25 10/22/2025
RSI ROW FINAL INSPECTION (¤16.25) 10/22/2025
SCHOOL BOARD IMPACT FEE RES ¤5,450.00 10/22/2025
WASTEWATER MAIN EXTENSION IMPA ¤2,385.00 10/22/2025
WASTEWATER MAIN EXTENSION IMPA (¤2,385.00) 10/22/2025
SURCHARGE FS 533.721 ¤14.10 10/22/2025
SURCHARGE FS 533.721 (¤14.10) 10/22/2025
SURCHARGE - FS 468.631 (¤21.15) 10/22/2025
SURCHARGE - FS 468.631 ¤21.15 10/22/2025
SW ENG RES REVIEW 240 (¤240.00) 10/22/2025
SW ENG RES REVIEW 240 ¤240.00 10/22/2025
TRANSP RES IMPACT FEE 10-25 (¤7,061.21) 10/22/2025
WATER METER W/ TAP (¤2,326.93) 10/22/2025
WATER METER W/ TAP ¤2,326.93 10/22/2025
TRANSP RES IMPACT FEE 10-25 ¤7,061.21 10/22/2025
SEWER CREDIT (¤2,465.75) 10/22/2025
SEWER CREDIT ¤2,465.75 10/22/2025
WASTEWATER PERM INSPECTION (¤80.00) 10/22/2025
WASTEWATER PERM INSPECTION ¤80.00 10/22/2025
WASTEWATER PERM REVIEW (¤25.00) 10/22/2025
WASTEWATER PERM REVIEW ¤25.00 10/22/2025
SEWER CAPITAL FACILITY (¤4,415.00) 10/22/2025
SEWER CAPITAL FACILITY ¤4,415.00 10/22/2025
WATER CAPITAL FACILITY FEE ¤3,790.49 10/22/2025
WATER CAPITAL FACILITY FEE (¤3,790.49) 10/22/2025
WATER PERMIT REVIEW (¤25.00) 10/22/2025
WATER MAIN EXTENSION IMPACT ¤917.27 10/22/2025
WATER PERMIT REVIEW ¤25.00 10/22/2025
SITE PLAN 30 (¤30.00) 10/22/2025
WATER MAIN EXTENSION IMPACT (¤917.27) 10/22/2025
SITE PLAN 30 ¤30.00 10/22/2025
SITE PLAN 30 ¤30.00 10/20/2025
SITE PLAN 30 (¤30.00) 10/20/2025
WATER MAIN EXTENSION IMPACT ¤917.27 10/20/2025
WATER MAIN EXTENSION IMPACT (¤917.27) 10/20/2025
WATER PERMIT REVIEW ¤25.00 10/20/2025
WATER PERMIT REVIEW (¤25.00) 10/20/2025
WATER CAPITAL FACILITY FEE ¤3,790.49 10/20/2025
WATER CAPITAL FACILITY FEE (¤3,790.49) 10/20/2025
SEWER CAPITAL FACILITY ¤4,415.00 10/20/2025
SEWER CAPITAL FACILITY (¤4,415.00) 10/20/2025
WASTEWATER PERM REVIEW ¤25.00 10/20/2025
WASTEWATER PERM REVIEW (¤25.00) 10/20/2025
WASTEWATER PERM INSPECTION ¤80.00 10/20/2025
WASTEWATER PERM INSPECTION (¤80.00) 10/20/2025
SEWER CREDIT (¤2,465.75) 10/20/2025
SEWER CREDIT ¤2,465.75 10/20/2025
WATER METER W/ TAP ¤2,326.93 10/20/2025
TRANSP RES IMPACT FEE 10-25 ¤7,061.21 10/20/2025
TRANSP RES IMPACT FEE 10-25 (¤7,061.21) 10/20/2025
WATER METER W/ TAP (¤2,326.93) 10/20/2025
SW ENG RES REVIEW 240 ¤240.00 10/20/2025
SW ENG RES REVIEW 240 (¤240.00) 10/20/2025
SURCHARGE - FS 468.631 ¤21.15 10/20/2025
SURCHARGE - FS 468.631 (¤21.15) 10/20/2025
SURCHARGE FS 533.721 ¤14.10 10/20/2025
SURCHARGE FS 533.721 (¤14.10) 10/20/2025
WASTEWATER MAIN EXTENSION IMPA ¤2,385.00 10/20/2025
WASTEWATER MAIN EXTENSION IMPA (¤2,385.00) 10/20/2025
SCHOOL BOARD IMPACT FEE RES ¤5,450.00 10/20/2025
SCHOOL BOARD IMPACT FEE RES (¤5,450.00) 10/20/2025
RSI ROW FINAL INSPECTION ¤16.25 10/20/2025
RSI ROW FINAL INSPECTION (¤16.25) 10/20/2025
RSI FNL SURVEY/GRADING CERT ¤48.75 10/20/2025
RSI FNL SURVEY/GRADING CERT (¤48.75) 10/20/2025
RSI PLAN REVIEW NEW ¤48.75 10/20/2025
RSI PLAN REVIEW NEW (¤48.75) 10/20/2025
RSI FIELD SURVEY INSPECTION ¤48.75 10/20/2025
RSI FIELD SURVEY INSPECTION (¤48.75) 10/20/2025
RSI FORMBOARD REVIEW ¤16.25 10/20/2025
RSI FORMBOARD REVIEW (¤16.25) 10/20/2025
RSE DRIVE PRE POUR INSPECTION ¤32.50 10/20/2025
RSE DRIVE PRE POUR INSPECTION (¤32.50) 10/20/2025
RSI DRIVEWAY AFTER POUR ¤16.25 10/20/2025
RSI DRIVEWAY AFTER POUR (¤16.25) 10/20/2025
FIRE RES IMPACT FEE 10-25 ¤942.00 10/20/2025
FIRE RES IMPACT FEE 10-25 (¤942.00) 10/20/2025
PEP TANK INSTALL ¤756.74 10/20/2025
PEP TANK INSTALL (¤756.74) 10/20/2025
PARKS IMPACT FEE 10-25 ¤3,164.00 10/20/2025
PARKS IMPACT FEE 10-25 (¤3,164.00) 10/20/2025
FC IMPACT FEE LIBRARY ¤268.00 10/20/2025
FC IMPACT FEE LIBRARY (¤268.00) 10/20/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 10/20/2025
FC IMPACT FEE LAW ENFORCEMENT (¤218.00) 10/20/2025
FC IMPACT FEE EMS ¤62.00 10/20/2025
FC IMPACT FEE EMS (¤62.00) 10/20/2025
PLAN REVIEW - RESIDENTIAL ¤304.98 10/20/2025
PLAN REVIEW - RESIDENTIAL (¤304.98) 10/20/2025
INSPECTION - RESIDENTIAL ¤1,075.25 10/20/2025
INSPECTION - RESIDENTIAL (¤1,075.25) 10/20/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 10/20/2025
ADMINISTRATIVE RESIDENTIAL (¤30.00) 10/20/2025
WATER- TURN ON ¤50.00 10/20/2025
WATER- TURN ON (¤50.00) 10/20/2025
PLAN REVIEW - REVISION ¤32.50
Fees Total Due: ¤32.50 Total Paid: ¤31,413.87