I want to search for...
Permit #2025100384
Permit Details
Status: INSPECT
| Parcel Id: 07-11-31-7065-00180-0210 |
| OPENED PORCH (WITH ROOF) : 249 sqft |
| GARAGE: 759 sqft |
| CONDITIONED SPACE: 1873 sqft |
| Total Square Footage: 2881 sqft |
| Block: 00180 |
| Subdivision: 7065 - |
| Job Phone: 352-433-8382 |
| Location Address: 91 KASHMIR TRL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/04/2025 |
| NOC: RECORDED |
| Applicant name: ALFREDO E SCHEER |
| Owner: GONZALEZ WILLIAM & LAURA LY |
|
Address 52 LU MANOR DRIVE FAIRFIELD, CT 06432 |
| Lot: 0210 |
| Contracted Stated Job Value: ¤165,000.00 |
| Job Description: Single Family |
| Type: CN |
Contractor
ESTELA LIVING LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
237 S. DIXIE HWY, 4TH FLOOR CORAL GABLES, FL 33133 |
CGC1534535 (Exp: 08/31/2026) | 352-433-8382 |
Sub Contractors
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
CAC043953 (Exp: 08/31/2026) | 877-906-1113 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW- PRE-APRON (PRE-POUR) | 06/08/2026 | APPROVED - AS NOTED | FSLADISH |
| Note: 6/8/26 MINOR CORRECTION REQUIRED TO BRING FRONT FORM CLOSER TO ROAD EDGE OF LEFT SIDE. SPOKE TO JIM CM AND HIS FRAMERS ARE CLOSEBY. BECAUSE THIS IS THE ONLY ISSUE I AM GOING TO APPROVE IT AS NOTED IT WILL BE CORRECTED TODAY. PHOTO FOR REFERENCE. PIPE INVERT IS GOOD AT TIME OF THIS INSPECTION. BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED. DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER AND VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. 6/4/2026 - PREVIOUS INSPECTION NOTES 6/4/26 RECEIVED MESSAGE FROM JIM CM TO PLEASE CANCEL THIS PREPOUR INSPECTION FOR TODAY. CANCELLING AS A COURTESY DUE TO COMMUNICATION WITH INSPECTOR. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/04/2026 | CANCELLED BY APPLICANT | FSLADISH |
| Note: 6/4/26 RECEIVED MESSAGE FROM JIM CM TO PLEASE CANCEL THIS PREPOUR INSPECTION FOR TODAY. CANCELLING AS A COURTESY DUE TO COMMUNICATION WITH INSPECTOR. | |||
| GRAVITY SEWER TEST | 05/27/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/27/2026 11:55:21 AM *** Approved | |||
| SEWER TIE IN | 05/27/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/27/2026 11:55:44 AM *** Approved | |||
| ELECTRIC - EARLY POWER | 05/26/2026 | APPROVED | RMARTIN |
| Note: 5/22/2026 - PREVIOUS INSPECTION NOTES Electrical panel in garage is the wrong size, only holding on by 2 top screws, large opening at the bottom.... also drywall and insulation is removed from guest bathroom block wall. Please contact me at 386-986-7848 | |||
| ELECTRIC - EARLY POWER | 05/22/2026 | Disapproved - NO FEE | RMARTIN |
| Note: Electrical panel in garage is the wrong size, only holding on by 2 top screws, large opening at the bottom.... also drywall and insulation is removed from guest bathroom block wall. Please contact me at 386-986-7848 | |||
| PEP TANK INSTALLATION REQUEST | 05/05/2026 | APPROVED | ISANDERSON |
| INSULATION | 04/09/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/9/2026 2:11:31 PM *** Approved 4/6/2026 - PREVIOUS INSPECTION NOTES 4/6/26: Cancelled by Applicant via phone call at @ 0953. Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 3/31/2026 12:29:30 PM *** 3/31/26: Check at Insulation Inspection. 1). 5ft head pressure is not holding. FBC-P2503.5.1 2). Guest bathroom > slab at tub needs excess dirt removed from opening for tub waste and floor needs to be repaired with concrete to meet slab / termite requirements. FBC R506.1/ FBCR 318 | |||
| LATH/BRICK/ WATER BARRIER | 04/07/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/7/2026 2:44:20 PM *** Approved | |||
| INSULATION | 04/06/2026 | CANCELLED BY APPLICANT | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/6/2026 9:59:56 AM *** 4/6/26: Cancelled by Applicant via phone call at @ 0953. Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 3/31/2026 12:29:30 PM *** 3/31/26: Check at Insulation Inspection. 1). 5ft head pressure is not holding. FBC-P2503.5.1 2). Guest bathroom > slab at tub needs excess dirt removed from opening for tub waste and floor needs to be repaired with concrete to meet slab / termite requirements. FBC R506.1/ FBCR 318 | |||
| ALL ROUGH | 03/31/2026 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 3/31/2026 12:29:30 PM *** 3/31/26: Check at Insulation Inspection. 1). 5ft head pressure is not holding. FBC-P2503.5.1 2). Guest bathroom > slab at tub needs excess dirt removed from opening for tub waste and floor needs to be repaired with concrete to meet slab / termite requirements. FBC R506.1/ FBCR 318 | |||
| ROOF VALLEY & METAL | 03/30/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 3/27/2026 12:23:27 PM *** 3/27/26: Virtually approved via FaceTime video/audio phone app at @ 1220. 3/26/2026 - PREVIOUS INSPECTION NOTES 3/26/26: This inspection was for underlayment, etc. review due to installation prior to approved inspection. A minimum of a Live Virtual inspection will be performed to view the inspection areas prior to re-shingling the areas. __________________________________________________________________________________________________________________________ 3/25/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2430 3/25/26: Cancelled by Applicant via phone call at @ 0848. Roofer not available at timeframe. CM will reschedule. *** NOTES ADDED BY RSIMS 3/19/2026 1:43:40 PM *** 3/19/26: Please have portable toilet uprighted as required. FBC-P311.1 3/17/2026 - PREVIOUS INSPECTION NOTES 3/17/26: 1). B1 repair does not meet Alpine repair requirements provided by the engineer. The plywood squares are not installed to the correct orientation shown on the repair plan. 3/12/2026 - PREVIOUS INSPECTION NOTES 3/12/26: Cancelled by Applicant via phone call at @ 12:23 Inspector Notes from Inspection 2465 *** NOTES ADDED BY RSIMS 3/11/2026 12:35:51 PM *** 3/11/26: THIS INSPECTION WAS ALREADY APPROVED. ADDED A FRAMING INSPECTION TO CHECK TRUSS REPAIR FOR THE MISPLACED TRUSSES. TRUSSES ARE NOT REPAIRED AS PER THE ENGINEERING REQUIREMENTS. ALSO PLEASE ASSURE THAT THE ENGINEER'S REPAIR LETTER IS WITH PLANS IN PERMIT BOX. Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 2/25/2026 11:09:26 AM *** 2/25/26: Check at All Rough. Ok to dry-in. 1). Revision required for the B1 / B3 trusses that are not placed as shown on the MiTek truss layout. FBC [A]107.4 2). The B02 truss previously mentioned has a strap at the front of the house that is not fastened to the truss as required. Engineer's revision required. FBC [A]107.4 3). B02/B03 truss that are missing a splice plate will need Engineer's detail submitted to and Approved by the City. FBC [A]107.4 2/18/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- Trusses #1 and #2 are switch placement , please fix or have new trusses layout summit for revision and approval #2- straps on B02 not secured by factory installation #3-FBC [A]107.4-REMOVE SHINERS - EXCEPT ZIP BOARD ( mark on roof deck with red sharpie market #4-FBC 3303.5-SWALE CLEAR ( dumpters was drop on swale ) | |||
| ROOF VALLEY & METAL | 03/26/2026 | PARTIALLY APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 3/26/2026 10:51:03 AM *** 3/26/26: This inspection was for underlayment, etc. review due to installation prior to approved inspection. A minimum of a Live Virtual inspection will be performed to view the inspection areas prior to re-shingling the areas. __________________________________________________________________________________________________________________________ 3/25/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2430 3/25/26: Cancelled by Applicant via phone call at @ 0848. Roofer not available at timeframe. CM will reschedule. *** NOTES ADDED BY RSIMS 3/19/2026 1:43:40 PM *** 3/19/26: Please have portable toilet uprighted as required. FBC-P311.1 3/17/2026 - PREVIOUS INSPECTION NOTES 3/17/26: 1). B1 repair does not meet Alpine repair requirements provided by the engineer. The plywood squares are not installed to the correct orientation shown on the repair plan. 3/12/2026 - PREVIOUS INSPECTION NOTES 3/12/26: Cancelled by Applicant via phone call at @ 12:23 Inspector Notes from Inspection 2465 *** NOTES ADDED BY RSIMS 3/11/2026 12:35:51 PM *** 3/11/26: THIS INSPECTION WAS ALREADY APPROVED. ADDED A FRAMING INSPECTION TO CHECK TRUSS REPAIR FOR THE MISPLACED TRUSSES. TRUSSES ARE NOT REPAIRED AS PER THE ENGINEERING REQUIREMENTS. ALSO PLEASE ASSURE THAT THE ENGINEER'S REPAIR LETTER IS WITH PLANS IN PERMIT BOX. Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 2/25/2026 11:09:26 AM *** 2/25/26: Check at All Rough. Ok to dry-in. 1). Revision required for the B1 / B3 trusses that are not placed as shown on the MiTek truss layout. FBC [A]107.4 2). The B02 truss previously mentioned has a strap at the front of the house that is not fastened to the truss as required. Engineer's revision required. FBC [A]107.4 3). B02/B03 truss that are missing a splice plate will need Engineer's detail submitted to and Approved by the City. FBC [A]107.4 2/18/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- Trusses #1 and #2 are switch placement , please fix or have new trusses layout summit for revision and approval #2- straps on B02 not secured by factory installation #3-FBC [A]107.4-REMOVE SHINERS - EXCEPT ZIP BOARD ( mark on roof deck with red sharpie market #4-FBC 3303.5-SWALE CLEAR ( dumpters was drop on swale ) | |||
| ROOF VALLEY & METAL | 03/25/2026 | CANCELLED BY APPLICANT | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 3/25/2026 8:49:55 AM *** Inspector Notes from Inspection 2430 3/25/26: Cancelled by Applicant via phone call at @ 0848. Roofer not available at timeframe. CM will reschedule. *** NOTES ADDED BY RSIMS 3/19/2026 1:43:40 PM *** 3/19/26: Please have portable toilet uprighted as required. FBC-P311.1 3/17/2026 - PREVIOUS INSPECTION NOTES 3/17/26: 1). B1 repair does not meet Alpine repair requirements provided by the engineer. The plywood squares are not installed to the correct orientation shown on the repair plan. 3/12/2026 - PREVIOUS INSPECTION NOTES 3/12/26: Cancelled by Applicant via phone call at @ 12:23 Inspector Notes from Inspection 2465 *** NOTES ADDED BY RSIMS 3/11/2026 12:35:51 PM *** 3/11/26: THIS INSPECTION WAS ALREADY APPROVED. ADDED A FRAMING INSPECTION TO CHECK TRUSS REPAIR FOR THE MISPLACED TRUSSES. TRUSSES ARE NOT REPAIRED AS PER THE ENGINEERING REQUIREMENTS. ALSO PLEASE ASSURE THAT THE ENGINEER'S REPAIR LETTER IS WITH PLANS IN PERMIT BOX. Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 2/25/2026 11:09:26 AM *** 2/25/26: Check at All Rough. Ok to dry-in. 1). Revision required for the B1 / B3 trusses that are not placed as shown on the MiTek truss layout. FBC [A]107.4 2). The B02 truss previously mentioned has a strap at the front of the house that is not fastened to the truss as required. Engineer's revision required. FBC [A]107.4 3). B02/B03 truss that are missing a splice plate will need Engineer's detail submitted to and Approved by the City. FBC [A]107.4 2/18/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- Trusses #1 and #2 are switch placement , please fix or have new trusses layout summit for revision and approval #2- straps on B02 not secured by factory installation #3-FBC [A]107.4-REMOVE SHINERS - EXCEPT ZIP BOARD ( mark on roof deck with red sharpie market #4-FBC 3303.5-SWALE CLEAR ( dumpters was drop on swale ) | |||
| FRAMING | 03/19/2026 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 3/19/2026 1:43:40 PM *** 3/19/26: Please have portable toilet uprighted as required. FBC-P311.1 3/17/2026 - PREVIOUS INSPECTION NOTES 3/17/26: 1). B1 repair does not meet Alpine repair requirements provided by the engineer. The plywood squares are not installed to the correct orientation shown on the repair plan. 3/12/2026 - PREVIOUS INSPECTION NOTES 3/12/26: Cancelled by Applicant via phone call at @ 12:23 Inspector Notes from Inspection 2465 *** NOTES ADDED BY RSIMS 3/11/2026 12:35:51 PM *** 3/11/26: THIS INSPECTION WAS ALREADY APPROVED. ADDED A FRAMING INSPECTION TO CHECK TRUSS REPAIR FOR THE MISPLACED TRUSSES. TRUSSES ARE NOT REPAIRED AS PER THE ENGINEERING REQUIREMENTS. ALSO PLEASE ASSURE THAT THE ENGINEER'S REPAIR LETTER IS WITH PLANS IN PERMIT BOX. Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 2/25/2026 11:09:26 AM *** 2/25/26: Check at All Rough. Ok to dry-in. 1). Revision required for the B1 / B3 trusses that are not placed as shown on the MiTek truss layout. FBC [A]107.4 2). The B02 truss previously mentioned has a strap at the front of the house that is not fastened to the truss as required. Engineer's revision required. FBC [A]107.4 3). B02/B03 truss that are missing a splice plate will need Engineer's detail submitted to and Approved by the City. FBC [A]107.4 2/18/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- Trusses #1 and #2 are switch placement , please fix or have new trusses layout summit for revision and approval #2- straps on B02 not secured by factory installation #3-FBC [A]107.4-REMOVE SHINERS - EXCEPT ZIP BOARD ( mark on roof deck with red sharpie market #4-FBC 3303.5-SWALE CLEAR ( dumpters was drop on swale ) | |||
| FRAMING | 03/17/2026 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 3/17/2026 10:13:04 AM *** 3/17/26: 1). B1 repair does not meet Alpine repair requirements provided by the engineer. The plywood squares are not installed to the correct orientation shown on the repair plan. 3/12/2026 - PREVIOUS INSPECTION NOTES 3/12/26: Cancelled by Applicant via phone call at @ 12:23 Inspector Notes from Inspection 2465 *** NOTES ADDED BY RSIMS 3/11/2026 12:35:51 PM *** 3/11/26: THIS INSPECTION WAS ALREADY APPROVED. ADDED A FRAMING INSPECTION TO CHECK TRUSS REPAIR FOR THE MISPLACED TRUSSES. TRUSSES ARE NOT REPAIRED AS PER THE ENGINEERING REQUIREMENTS. ALSO PLEASE ASSURE THAT THE ENGINEER'S REPAIR LETTER IS WITH PLANS IN PERMIT BOX. Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 2/25/2026 11:09:26 AM *** 2/25/26: Check at All Rough. Ok to dry-in. 1). Revision required for the B1 / B3 trusses that are not placed as shown on the MiTek truss layout. FBC [A]107.4 2). The B02 truss previously mentioned has a strap at the front of the house that is not fastened to the truss as required. Engineer's revision required. FBC [A]107.4 3). B02/B03 truss that are missing a splice plate will need Engineer's detail submitted to and Approved by the City. FBC [A]107.4 2/18/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- Trusses #1 and #2 are switch placement , please fix or have new trusses layout summit for revision and approval #2- straps on B02 not secured by factory installation #3-FBC [A]107.4-REMOVE SHINERS - EXCEPT ZIP BOARD ( mark on roof deck with red sharpie market #4-FBC 3303.5-SWALE CLEAR ( dumpters was drop on swale ) | |||
| ROOF VALLEY & METAL | 03/12/2026 | CANCELLED BY APPLICANT | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 3/12/2026 3:07:08 PM *** 3/12/26: Cancelled by Applicant via phone call at @ 12:23 Inspector Notes from Inspection 2465 *** NOTES ADDED BY RSIMS 3/11/2026 12:35:51 PM *** 3/11/26: THIS INSPECTION WAS ALREADY APPROVED. ADDED A FRAMING INSPECTION TO CHECK TRUSS REPAIR FOR THE MISPLACED TRUSSES. TRUSSES ARE NOT REPAIRED AS PER THE ENGINEERING REQUIREMENTS. ALSO PLEASE ASSURE THAT THE ENGINEER'S REPAIR LETTER IS WITH PLANS IN PERMIT BOX. Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 2/25/2026 11:09:26 AM *** 2/25/26: Check at All Rough. Ok to dry-in. 1). Revision required for the B1 / B3 trusses that are not placed as shown on the MiTek truss layout. FBC [A]107.4 2). The B02 truss previously mentioned has a strap at the front of the house that is not fastened to the truss as required. Engineer's revision required. FBC [A]107.4 3). B02/B03 truss that are missing a splice plate will need Engineer's detail submitted to and Approved by the City. FBC [A]107.4 2/18/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- Trusses #1 and #2 are switch placement , please fix or have new trusses layout summit for revision and approval #2- straps on B02 not secured by factory installation #3-FBC [A]107.4-REMOVE SHINERS - EXCEPT ZIP BOARD ( mark on roof deck with red sharpie market #4-FBC 3303.5-SWALE CLEAR ( dumpters was drop on swale ) | |||
| FRAMING | 03/12/2026 | CANCELLED BY APPLICANT | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 3/12/2026 3:07:36 PM *** 3/12/26: Cancelled by Applicant via phone call at @ 12:23 Inspector Notes from Inspection 2465 *** NOTES ADDED BY RSIMS 3/11/2026 12:35:51 PM *** 3/11/26: THIS INSPECTION WAS ALREADY APPROVED. ADDED A FRAMING INSPECTION TO CHECK TRUSS REPAIR FOR THE MISPLACED TRUSSES. TRUSSES ARE NOT REPAIRED AS PER THE ENGINEERING REQUIREMENTS. ALSO PLEASE ASSURE THAT THE ENGINEER'S REPAIR LETTER IS WITH PLANS IN PERMIT BOX. Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 2/25/2026 11:09:26 AM *** 2/25/26: Check at All Rough. Ok to dry-in. 1). Revision required for the B1 / B3 trusses that are not placed as shown on the MiTek truss layout. FBC [A]107.4 2). The B02 truss previously mentioned has a strap at the front of the house that is not fastened to the truss as required. Engineer's revision required. FBC [A]107.4 3). B02/B03 truss that are missing a splice plate will need Engineer's detail submitted to and Approved by the City. FBC [A]107.4 2/18/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- Trusses #1 and #2 are switch placement , please fix or have new trusses layout summit for revision and approval #2- straps on B02 not secured by factory installation #3-FBC [A]107.4-REMOVE SHINERS - EXCEPT ZIP BOARD ( mark on roof deck with red sharpie market #4-FBC 3303.5-SWALE CLEAR ( dumpters was drop on swale ) | |||
| WALL SHEATHING | 03/11/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 3/11/2026 12:31:00 PM *** Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 2/25/2026 11:09:26 AM *** 2/25/26: Check at All Rough. Ok to dry-in. 1). Revision required for the B1 / B3 trusses that are not placed as shown on the MiTek truss layout. FBC [A]107.4 2). The B02 truss previously mentioned has a strap at the front of the house that is not fastened to the truss as required. Engineer's revision required. FBC [A]107.4 3). B02/B03 truss that are missing a splice plate will need Engineer's detail submitted to and Approved by the City. FBC [A]107.4 2/18/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- Trusses #1 and #2 are switch placement , please fix or have new trusses layout summit for revision and approval #2- straps on B02 not secured by factory installation #3-FBC [A]107.4-REMOVE SHINERS - EXCEPT ZIP BOARD ( mark on roof deck with red sharpie market #4-FBC 3303.5-SWALE CLEAR ( dumpters was drop on swale ) | |||
| ROOF SHEATHING | 03/11/2026 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 3/11/2026 12:35:51 PM *** 3/11/26: THIS INSPECTION WAS ALREADY APPROVED. ADDED A FRAMING INSPECTION TO CHECK TRUSS REPAIR FOR THE MISPLACED TRUSSES. TRUSSES ARE NOT REPAIRED AS PER THE ENGINEERING REQUIREMENTS. ALSO PLEASE ASSURE THAT THE ENGINEER'S REPAIR LETTER IS WITH PLANS IN PERMIT BOX. Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 2/25/2026 11:09:26 AM *** 2/25/26: Check at All Rough. Ok to dry-in. 1). Revision required for the B1 / B3 trusses that are not placed as shown on the MiTek truss layout. FBC [A]107.4 2). The B02 truss previously mentioned has a strap at the front of the house that is not fastened to the truss as required. Engineer's revision required. FBC [A]107.4 3). B02/B03 truss that are missing a splice plate will need Engineer's detail submitted to and Approved by the City. FBC [A]107.4 2/18/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- Trusses #1 and #2 are switch placement , please fix or have new trusses layout summit for revision and approval #2- straps on B02 not secured by factory installation #3-FBC [A]107.4-REMOVE SHINERS - EXCEPT ZIP BOARD ( mark on roof deck with red sharpie market #4-FBC 3303.5-SWALE CLEAR ( dumpters was drop on swale ) | |||
| ROOF VALLEY & METAL | 03/11/2026 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 2/25/2026 11:09:26 AM *** 2/25/26: Check at All Rough. Ok to dry-in. 1). Revision required for the B1 / B3 trusses that are not placed as shown on the MiTek truss layout. FBC [A]107.4 2). The B02 truss previously mentioned has a strap at the front of the house that is not fastened to the truss as required. Engineer's revision required. FBC [A]107.4 3). B02/B03 truss that are missing a splice plate will need Engineer's detail submitted to and Approved by the City. FBC [A]107.4 2/18/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- Trusses #1 and #2 are switch placement , please fix or have new trusses layout summit for revision and approval #2- straps on B02 not secured by factory installation #3-FBC [A]107.4-REMOVE SHINERS - EXCEPT ZIP BOARD ( mark on roof deck with red sharpie market #4-FBC 3303.5-SWALE CLEAR ( dumpters was drop on swale ) | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/25/2026 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 2/25/2026 11:09:26 AM *** 2/25/26: Check at All Rough. Ok to dry-in. 1). Revision required for the B1 / B3 trusses that are not placed as shown on the MiTek truss layout. FBC [A]107.4 2). The B02 truss previously mentioned has a strap at the front of the house that is not fastened to the truss as required. Engineer's revision required. FBC [A]107.4 3). B02/B03 truss that are missing a splice plate will need Engineer's detail submitted to and Approved by the City. FBC [A]107.4 2/18/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- Trusses #1 and #2 are switch placement , please fix or have new trusses layout summit for revision and approval #2- straps on B02 not secured by factory installation #3-FBC [A]107.4-REMOVE SHINERS - EXCEPT ZIP BOARD ( mark on roof deck with red sharpie market #4-FBC 3303.5-SWALE CLEAR ( dumpters was drop on swale ) | |||
| ROOF SHEATHING | 02/18/2026 | Disapproved - NO FEE | CVANSTRAHLEN |
| Note: Notes are on roof sheathing bracing and tie downs inspection | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/18/2026 | Disapproved - NO FEE | CVANSTRAHLEN |
| Note: Please fix items before next inspection #1- Trusses #1 and #2 are switch placement , please fix or have new trusses layout summit for revision and approval #2- straps on B02 not secured by factory installation #3-FBC [A]107.4-REMOVE SHINERS - EXCEPT ZIP BOARD ( mark on roof deck with red sharpie market #4-FBC 3303.5-SWALE CLEAR ( dumpters was drop on swale ) | |||
| WALL SHEATHING | 02/18/2026 | CANCELLED BY APPLICANT | WEB |
| TIE BEAM / LINTEL | 02/06/2026 | APPROVED | BTAYLOR |
| MONOLITHIC SLAB | 01/30/2026 | APPROVED | MCONTRYMAN |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/28/2026 | APPROVED | BTAYLOR |
| ELECTRIC UNDERGROUND | 01/28/2026 | CANCELLED BY INSPECTOR | BTAYLOR |
| Note: 1-28-26 1. This inspection is not needed. | |||
| FORMBOARD SURVEY (OFFICE USE ONLY) | 01/27/2026 | APPROVED | RRICKS |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 01/20/2026 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 11/13/2025 | APPROVED | CBOWERMASTER |
| U-CROSS CONNECTION | |||
| BLD - BUILDING FINAL | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 03/13/2026 | 03/18/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/27/2026 | 03/04/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/27/2026 | 01/27/2026 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/27/2026 | 01/27/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/16/2026 | 01/20/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 11/12/2025 | 11/12/2025 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM for future NOC's, please be sure to complete the document with the owner address/contractor address completely and in the correct fields. | |||
| BLD | COMPLETE | 10/14/2025 | 10/20/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 10/14/2025 | 10/16/2025 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 10/14/2025 | 10/20/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/14/2025 | 10/14/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 10/14/2025 | 10/16/2025 |
| LOCATE | COMPLETE | 10/14/2025 | 10/16/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/14/2025 | 10/16/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/14/2025 | 10/20/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/14/2025 | 10/15/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 10/14/2025 | 10/24/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER- TURN ON | ¤50.00 | 11/04/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/04/2025 |
| INSPECTION - RESIDENTIAL | ¤1,075.25 | 11/04/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤304.98 | 11/04/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 11/04/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 11/04/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 11/04/2025 |
| FIRE RES IMPACT FEE 10-25 | ¤942.00 | 11/04/2025 |
| PEP TANK INSTALL | ¤756.74 | 11/04/2025 |
| PARKS IMPACT FEE 10-25 | ¤3,164.00 | 11/04/2025 |
| RSI DRIVEWAY AFTER POUR | ¤16.25 | 11/04/2025 |
| RSE DRIVE PRE POUR INSPECTION | ¤32.50 | 11/04/2025 |
| RSI FIELD SURVEY INSPECTION | ¤48.75 | 11/04/2025 |
| RSI FORMBOARD REVIEW | ¤16.25 | 11/04/2025 |
| RSI PLAN REVIEW NEW | ¤48.75 | 11/04/2025 |
| RSI FNL SURVEY/GRADING CERT | ¤48.75 | 11/04/2025 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 11/04/2025 |
| SCHOOL BOARD IMPACT FEE RES | ¤5,450.00 | 11/04/2025 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,385.00 | 11/04/2025 |
| SURCHARGE FS 533.721 | ¤14.10 | 11/04/2025 |
| SURCHARGE - FS 468.631 | ¤21.15 | 11/04/2025 |
| SW ENG RES REVIEW 240 | ¤240.00 | 11/04/2025 |
| WATER METER W/ TAP | ¤2,326.93 | 11/04/2025 |
| TRANSP RES IMPACT FEE 10-25 | ¤7,061.21 | 11/04/2025 |
| SEWER CREDIT | (¤2,465.75) | 11/04/2025 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 11/04/2025 |
| WASTEWATER PERM REVIEW | ¤25.00 | 11/04/2025 |
| SEWER CAPITAL FACILITY | ¤4,415.00 | 11/04/2025 |
| WATER CAPITAL FACILITY FEE | ¤3,790.49 | 11/04/2025 |
| WATER PERMIT REVIEW | ¤25.00 | 11/04/2025 |
| WATER MAIN EXTENSION IMPACT | ¤917.27 | 11/04/2025 |
| SITE PLAN 30 | ¤30.00 | 11/04/2025 |
| SITE PLAN 30 | ¤30.00 | 10/27/2025 |
| SITE PLAN 30 | (¤30.00) | 10/27/2025 |
| WATER MAIN EXTENSION IMPACT | ¤917.27 | 10/27/2025 |
| WATER MAIN EXTENSION IMPACT | (¤917.27) | 10/27/2025 |
| WATER PERMIT REVIEW | ¤25.00 | 10/27/2025 |
| WATER PERMIT REVIEW | (¤25.00) | 10/27/2025 |
| WATER CAPITAL FACILITY FEE | ¤3,790.49 | 10/27/2025 |
| WATER CAPITAL FACILITY FEE | (¤3,790.49) | 10/27/2025 |
| SEWER CAPITAL FACILITY | ¤4,415.00 | 10/27/2025 |
| WASTEWATER PERM INSPECTION | (¤80.00) | 10/27/2025 |
| WASTEWATER PERM REVIEW | ¤25.00 | 10/27/2025 |
| SEWER CAPITAL FACILITY | (¤4,415.00) | 10/27/2025 |
| WASTEWATER PERM REVIEW | (¤25.00) | 10/27/2025 |
| TRANSP RES IMPACT FEE 10-25 | (¤7,061.21) | 10/27/2025 |
| SEWER CREDIT | (¤2,465.75) | 10/27/2025 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 10/27/2025 |
| SEWER CREDIT | ¤2,465.75 | 10/27/2025 |
| WATER METER W/ TAP | (¤2,326.93) | 10/27/2025 |
| WATER METER W/ TAP | ¤2,326.93 | 10/27/2025 |
| TRANSP RES IMPACT FEE 10-25 | ¤7,061.21 | 10/27/2025 |
| SW ENG RES REVIEW 240 | (¤240.00) | 10/27/2025 |
| SURCHARGE - FS 468.631 | ¤21.15 | 10/27/2025 |
| SW ENG RES REVIEW 240 | ¤240.00 | 10/27/2025 |
| SURCHARGE - FS 468.631 | (¤21.15) | 10/27/2025 |
| SURCHARGE FS 533.721 | (¤14.10) | 10/27/2025 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,385.00 | 10/27/2025 |
| WASTEWATER MAIN EXTENSION IMPA | (¤2,385.00) | 10/27/2025 |
| SURCHARGE FS 533.721 | ¤14.10 | 10/27/2025 |
| SCHOOL BOARD IMPACT FEE RES | (¤5,450.00) | 10/27/2025 |
| SCHOOL BOARD IMPACT FEE RES | ¤5,450.00 | 10/27/2025 |
| RSI ROW FINAL INSPECTION | (¤16.25) | 10/27/2025 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 10/27/2025 |
| RSI FORMBOARD REVIEW | (¤16.25) | 10/27/2025 |
| RSI PLAN REVIEW NEW | ¤48.75 | 10/27/2025 |
| RSI FNL SURVEY/GRADING CERT | ¤48.75 | 10/27/2025 |
| RSI FNL SURVEY/GRADING CERT | (¤48.75) | 10/27/2025 |
| RSI PLAN REVIEW NEW | (¤48.75) | 10/27/2025 |
| RSI FIELD SURVEY INSPECTION | ¤48.75 | 10/27/2025 |
| RSI FORMBOARD REVIEW | ¤16.25 | 10/27/2025 |
| RSI FIELD SURVEY INSPECTION | (¤48.75) | 10/27/2025 |
| RSE DRIVE PRE POUR INSPECTION | (¤32.50) | 10/27/2025 |
| RSI DRIVEWAY AFTER POUR | ¤16.25 | 10/27/2025 |
| RSE DRIVE PRE POUR INSPECTION | ¤32.50 | 10/27/2025 |
| RSI DRIVEWAY AFTER POUR | (¤16.25) | 10/27/2025 |
| PARKS IMPACT FEE 10-25 | (¤3,164.00) | 10/27/2025 |
| PEP TANK INSTALL | (¤756.74) | 10/27/2025 |
| FIRE RES IMPACT FEE 10-25 | ¤942.00 | 10/27/2025 |
| FIRE RES IMPACT FEE 10-25 | (¤942.00) | 10/27/2025 |
| PEP TANK INSTALL | ¤756.74 | 10/27/2025 |
| PARKS IMPACT FEE 10-25 | ¤3,164.00 | 10/27/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | (¤218.00) | 10/27/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 10/27/2025 |
| FC IMPACT FEE LIBRARY | (¤268.00) | 10/27/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 10/27/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 10/27/2025 |
| FC IMPACT FEE EMS | (¤62.00) | 10/27/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤304.98 | 10/27/2025 |
| PLAN REVIEW - RESIDENTIAL | (¤304.98) | 10/27/2025 |
| INSPECTION - RESIDENTIAL | ¤1,075.25 | 10/27/2025 |
| INSPECTION - RESIDENTIAL | (¤1,075.25) | 10/27/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/27/2025 |
| ADMINISTRATIVE RESIDENTIAL | (¤30.00) | 10/27/2025 |
| WATER- TURN ON | ¤50.00 | 10/27/2025 |
| WATER- TURN ON | (¤50.00) | 10/27/2025 |
| WATER- TURN ON | ¤50.00 | 10/22/2025 |
| WATER- TURN ON | (¤50.00) | 10/22/2025 |
| ADMINISTRATIVE RESIDENTIAL | (¤30.00) | 10/22/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/22/2025 |
| INSPECTION - RESIDENTIAL | ¤1,075.25 | 10/22/2025 |
| PLAN REVIEW - RESIDENTIAL | (¤304.98) | 10/22/2025 |
| INSPECTION - RESIDENTIAL | (¤1,075.25) | 10/22/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤304.98 | 10/22/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 10/22/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | (¤218.00) | 10/22/2025 |
| FC IMPACT FEE EMS | (¤62.00) | 10/22/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 10/22/2025 |
| FIRE RES IMPACT FEE 10-25 | (¤942.00) | 10/22/2025 |
| FC IMPACT FEE LIBRARY | (¤268.00) | 10/22/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 10/22/2025 |
| PEP TANK INSTALL | (¤756.74) | 10/22/2025 |
| PARKS IMPACT FEE 10-25 | ¤3,164.00 | 10/22/2025 |
| PEP TANK INSTALL | ¤756.74 | 10/22/2025 |
| PARKS IMPACT FEE 10-25 | (¤3,164.00) | 10/22/2025 |
| FIRE RES IMPACT FEE 10-25 | ¤942.00 | 10/22/2025 |
| RSI DRIVEWAY AFTER POUR | (¤16.25) | 10/22/2025 |
| RSI DRIVEWAY AFTER POUR | ¤16.25 | 10/22/2025 |
| RSE DRIVE PRE POUR INSPECTION | (¤32.50) | 10/22/2025 |
| RSE DRIVE PRE POUR INSPECTION | ¤32.50 | 10/22/2025 |
| RSI FORMBOARD REVIEW | (¤16.25) | 10/22/2025 |
| RSI FIELD SURVEY INSPECTION | ¤48.75 | 10/22/2025 |
| RSI FIELD SURVEY INSPECTION | (¤48.75) | 10/22/2025 |
| RSI FORMBOARD REVIEW | ¤16.25 | 10/22/2025 |
| RSI PLAN REVIEW NEW | ¤48.75 | 10/22/2025 |
| RSI FNL SURVEY/GRADING CERT | ¤48.75 | 10/22/2025 |
| RSI FNL SURVEY/GRADING CERT | (¤48.75) | 10/22/2025 |
| RSI PLAN REVIEW NEW | (¤48.75) | 10/22/2025 |
| SCHOOL BOARD IMPACT FEE RES | (¤5,450.00) | 10/22/2025 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 10/22/2025 |
| RSI ROW FINAL INSPECTION | (¤16.25) | 10/22/2025 |
| SCHOOL BOARD IMPACT FEE RES | ¤5,450.00 | 10/22/2025 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,385.00 | 10/22/2025 |
| WASTEWATER MAIN EXTENSION IMPA | (¤2,385.00) | 10/22/2025 |
| SURCHARGE FS 533.721 | ¤14.10 | 10/22/2025 |
| SURCHARGE FS 533.721 | (¤14.10) | 10/22/2025 |
| SURCHARGE - FS 468.631 | (¤21.15) | 10/22/2025 |
| SURCHARGE - FS 468.631 | ¤21.15 | 10/22/2025 |
| SW ENG RES REVIEW 240 | (¤240.00) | 10/22/2025 |
| SW ENG RES REVIEW 240 | ¤240.00 | 10/22/2025 |
| TRANSP RES IMPACT FEE 10-25 | (¤7,061.21) | 10/22/2025 |
| WATER METER W/ TAP | (¤2,326.93) | 10/22/2025 |
| WATER METER W/ TAP | ¤2,326.93 | 10/22/2025 |
| TRANSP RES IMPACT FEE 10-25 | ¤7,061.21 | 10/22/2025 |
| SEWER CREDIT | (¤2,465.75) | 10/22/2025 |
| SEWER CREDIT | ¤2,465.75 | 10/22/2025 |
| WASTEWATER PERM INSPECTION | (¤80.00) | 10/22/2025 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 10/22/2025 |
| WASTEWATER PERM REVIEW | (¤25.00) | 10/22/2025 |
| WASTEWATER PERM REVIEW | ¤25.00 | 10/22/2025 |
| SEWER CAPITAL FACILITY | (¤4,415.00) | 10/22/2025 |
| SEWER CAPITAL FACILITY | ¤4,415.00 | 10/22/2025 |
| WATER CAPITAL FACILITY FEE | ¤3,790.49 | 10/22/2025 |
| WATER CAPITAL FACILITY FEE | (¤3,790.49) | 10/22/2025 |
| WATER PERMIT REVIEW | (¤25.00) | 10/22/2025 |
| WATER MAIN EXTENSION IMPACT | ¤917.27 | 10/22/2025 |
| WATER PERMIT REVIEW | ¤25.00 | 10/22/2025 |
| SITE PLAN 30 | (¤30.00) | 10/22/2025 |
| WATER MAIN EXTENSION IMPACT | (¤917.27) | 10/22/2025 |
| SITE PLAN 30 | ¤30.00 | 10/22/2025 |
| SITE PLAN 30 | ¤30.00 | 10/20/2025 |
| SITE PLAN 30 | (¤30.00) | 10/20/2025 |
| WATER MAIN EXTENSION IMPACT | ¤917.27 | 10/20/2025 |
| WATER MAIN EXTENSION IMPACT | (¤917.27) | 10/20/2025 |
| WATER PERMIT REVIEW | ¤25.00 | 10/20/2025 |
| WATER PERMIT REVIEW | (¤25.00) | 10/20/2025 |
| WATER CAPITAL FACILITY FEE | ¤3,790.49 | 10/20/2025 |
| WATER CAPITAL FACILITY FEE | (¤3,790.49) | 10/20/2025 |
| SEWER CAPITAL FACILITY | ¤4,415.00 | 10/20/2025 |
| SEWER CAPITAL FACILITY | (¤4,415.00) | 10/20/2025 |
| WASTEWATER PERM REVIEW | ¤25.00 | 10/20/2025 |
| WASTEWATER PERM REVIEW | (¤25.00) | 10/20/2025 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 10/20/2025 |
| WASTEWATER PERM INSPECTION | (¤80.00) | 10/20/2025 |
| SEWER CREDIT | (¤2,465.75) | 10/20/2025 |
| SEWER CREDIT | ¤2,465.75 | 10/20/2025 |
| WATER METER W/ TAP | ¤2,326.93 | 10/20/2025 |
| TRANSP RES IMPACT FEE 10-25 | ¤7,061.21 | 10/20/2025 |
| TRANSP RES IMPACT FEE 10-25 | (¤7,061.21) | 10/20/2025 |
| WATER METER W/ TAP | (¤2,326.93) | 10/20/2025 |
| SW ENG RES REVIEW 240 | ¤240.00 | 10/20/2025 |
| SW ENG RES REVIEW 240 | (¤240.00) | 10/20/2025 |
| SURCHARGE - FS 468.631 | ¤21.15 | 10/20/2025 |
| SURCHARGE - FS 468.631 | (¤21.15) | 10/20/2025 |
| SURCHARGE FS 533.721 | ¤14.10 | 10/20/2025 |
| SURCHARGE FS 533.721 | (¤14.10) | 10/20/2025 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,385.00 | 10/20/2025 |
| WASTEWATER MAIN EXTENSION IMPA | (¤2,385.00) | 10/20/2025 |
| SCHOOL BOARD IMPACT FEE RES | ¤5,450.00 | 10/20/2025 |
| SCHOOL BOARD IMPACT FEE RES | (¤5,450.00) | 10/20/2025 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 10/20/2025 |
| RSI ROW FINAL INSPECTION | (¤16.25) | 10/20/2025 |
| RSI FNL SURVEY/GRADING CERT | ¤48.75 | 10/20/2025 |
| RSI FNL SURVEY/GRADING CERT | (¤48.75) | 10/20/2025 |
| RSI PLAN REVIEW NEW | ¤48.75 | 10/20/2025 |
| RSI PLAN REVIEW NEW | (¤48.75) | 10/20/2025 |
| RSI FIELD SURVEY INSPECTION | ¤48.75 | 10/20/2025 |
| RSI FIELD SURVEY INSPECTION | (¤48.75) | 10/20/2025 |
| RSI FORMBOARD REVIEW | ¤16.25 | 10/20/2025 |
| RSI FORMBOARD REVIEW | (¤16.25) | 10/20/2025 |
| RSE DRIVE PRE POUR INSPECTION | ¤32.50 | 10/20/2025 |
| RSE DRIVE PRE POUR INSPECTION | (¤32.50) | 10/20/2025 |
| RSI DRIVEWAY AFTER POUR | ¤16.25 | 10/20/2025 |
| RSI DRIVEWAY AFTER POUR | (¤16.25) | 10/20/2025 |
| FIRE RES IMPACT FEE 10-25 | ¤942.00 | 10/20/2025 |
| FIRE RES IMPACT FEE 10-25 | (¤942.00) | 10/20/2025 |
| PEP TANK INSTALL | ¤756.74 | 10/20/2025 |
| PEP TANK INSTALL | (¤756.74) | 10/20/2025 |
| PARKS IMPACT FEE 10-25 | ¤3,164.00 | 10/20/2025 |
| PARKS IMPACT FEE 10-25 | (¤3,164.00) | 10/20/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 10/20/2025 |
| FC IMPACT FEE LIBRARY | (¤268.00) | 10/20/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 10/20/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | (¤218.00) | 10/20/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 10/20/2025 |
| FC IMPACT FEE EMS | (¤62.00) | 10/20/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤304.98 | 10/20/2025 |
| PLAN REVIEW - RESIDENTIAL | (¤304.98) | 10/20/2025 |
| INSPECTION - RESIDENTIAL | ¤1,075.25 | 10/20/2025 |
| INSPECTION - RESIDENTIAL | (¤1,075.25) | 10/20/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/20/2025 |
| ADMINISTRATIVE RESIDENTIAL | (¤30.00) | 10/20/2025 |
| WATER- TURN ON | ¤50.00 | 10/20/2025 |
| WATER- TURN ON | (¤50.00) | 10/20/2025 |
| PLAN REVIEW - REVISION | ¤32.50 | |
| Fees | Total Due: ¤32.50 | Total Paid: ¤31,413.87 |