I want to search for...
Permit #2025100466
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7013-00240-0510 |
| Total Square Footage: 627 sqft |
| Block: 00240 |
| Subdivision: - |
| Job Phone: 410-984-6789 |
| Location Address: 80 BRONSON LN |
| Type: PO - POOL |
| Issue Date: 10/20/2025 |
| NOC: RECORDED |
| Applicant name: MICHAEL JON HOWES |
| Owner: SCHEFFLER REBECCA PRZEKOPSKI |
|
Address 80 BRONSON LANE PALM COAST, FL 32137 |
| Lot: 0510 |
| Contracted Stated Job Value: ¤52,000.00 |
| Job Description: POOL W/EXISTING FENCE |
| Type: CN |
Contractor
JIFFY SERVICES LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
29 MALACOMPRA ROAD BUNNELL, FL 32137 |
RP252555617 (Exp: 08/31/2027) | 410-984-6789 |
Sub Contractors
MICHAEL JON HOWES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
29 MALACOMPRA ROAD BUNNELL, FL 32137 |
RP252555617 (Exp: 08/31/2027) | 410-984-6789 |
MARK E SMITH
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 351482 PALM COAST, FL 32164 |
EC0002128 (Exp: 08/31/2026) | (386) 437-8496 | 386-586-3612 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL INSPECTION | 04/03/2026 | APPROVED | PBUCKLEY |
| Note: 4/1/2026 - PREVIOUS INSPECTION NOTES ** 04/01/26 NEED TO REMOVE THE PILE OF MATERIAL ALONG THE LEFT SIDE OUTSIDE OF THE FENCE ** BARE EARTH BEHIND FENCE NEEDS STABILIZATION TO PREVENT EROSION _________________________________________________________________________________________________________________________ 1/13/2026 - PREVIOUS INSPECTION NOTES ** 01/13/26 AS INDICATED BY HOMEOWNER TO MYSELF AND RSI SUPERVISOR G. BERTOLA ONE PREVIOUS PROJECT STATUS WITH HOMEOWNER HE WOULD BE FINISHING THE STONE WORK IN REAR YARD AREA WHERE BARE EARTH IS EXPOSED. THIS WORK MUST BE COMPLETED BEFORE THE ROW STORMWATER FINAL CAN BE APPROVED. ____________________________________________________________________________________________________________________________ 1/12/2026 - PREVIOUS INSPECTION NOTES ** 01/12/26 BUILDER CANCELLED TODAYS INSPECTION CITING THAT THE HOMEOWNER IS REQUESTING A 24 HOUR NOTIFICATION BEFORE INSPECTION IS CONDUCTED INSPECTION WILL BE RE-SCHEDULED BY THE BUILDER FOR 01/13/25 | |||
| ROW - FINAL INSPECTION | 04/01/2026 | Disapproved - NO FEE | EMADISON |
| Note: ** 04/01/26 NEED TO REMOVE THE PILE OF MATERIAL ALONG THE LEFT SIDE OUTSIDE OF THE FENCE ** BARE EARTH BEHIND FENCE NEEDS STABILIZATION TO PREVENT EROSION _________________________________________________________________________________________________________________________ 1/13/2026 - PREVIOUS INSPECTION NOTES ** 01/13/26 AS INDICATED BY HOMEOWNER TO MYSELF AND RSI SUPERVISOR G. BERTOLA ONE PREVIOUS PROJECT STATUS WITH HOMEOWNER HE WOULD BE FINISHING THE STONE WORK IN REAR YARD AREA WHERE BARE EARTH IS EXPOSED. THIS WORK MUST BE COMPLETED BEFORE THE ROW STORMWATER FINAL CAN BE APPROVED. ____________________________________________________________________________________________________________________________ 1/12/2026 - PREVIOUS INSPECTION NOTES ** 01/12/26 BUILDER CANCELLED TODAYS INSPECTION CITING THAT THE HOMEOWNER IS REQUESTING A 24 HOUR NOTIFICATION BEFORE INSPECTION IS CONDUCTED INSPECTION WILL BE RE-SCHEDULED BY THE BUILDER FOR 01/13/25 | |||
| POOL FINAL | 03/30/2026 | APPROVED | PBUCKLEY |
| Note: 3/26/2026 - PREVIOUS INSPECTION NOTES 1/16/2026 4:27:26 PM- PREVIOUS INSPECTION NOTES 1. PREVIOUS POOL FINAL INSPECTION APPROVAL ON 01/13/26 OVERRIDDEN BY CHIEF BUILDING OFFICIAL. INSPECTION IS NOT APPROVED PER 2023 FLORIDA BUILDING CODE SECTION R318.7 BELOW. POOL DECK IS A PATIO. POOL DECK / PATIO EXCEEDS ELEVATION OF INTERIOR FINISH FLOOR ELEVATION OF HOME. PER EXCEPTION NO. 4. PATIOS ADJACENT TO MASONRY CONSTRUCTION, IF TREATED FOR TERMITES, MAY MATCH, BUT NOT EXCEED, THE FINISHED FLOOR ELEVATION OF THE HOME. THE POOL DECK / PATIO EXCEEDS THE FINISHED FLOOR ELEVATION OF THE HOME. R318.7 Inspection for termites. In order to provide for inspection for termite infestation, clearance between exterior wall coverings and final earth grade on the exterior of a building shall not be less than 6 inches (152 mm). Exceptions: l. Paint or decorative cementitious finish less than 5/8 inch (17.1 mm) thick adhered directly to the masonry foundation sidewall. 2. Access or vehicle ramps which rise to the interior finish floor elevation for the width of such ramps only. 3. A 4-inch (102 mm) inspection space above patio and garage slabs and entry areas. 4. If the patio has been soil treated for termites, the finish elevation may match the building interior finish floor elevations on masonry construction only. 5. Masonry veneers constructed in accordance with Section R318.4. 2. POOL DECK / PATIO EXCEEDS ELEVATION OF DOOR THRESHOLDS AT BATHROOM DOOR AND ENCLOSED LANAI DOOR AND IS A VIOLATION OF 2023 FLORIDA BUILDING CODE-RESIDENTIAL SECTION R311.3..2. THIS SECTION ALLOWS LANDINGS OR FLOORS UP TO 7-3/4 INCHES BELOW TOP OF DOOR THRESHOLD BUT DOES NOT PROVIDE ANY PROVISION ALLOWING FLOORS OR LANDINGS TO BE ABOVE THE TOP OF THE DOOR THRESHOLD. R311.3.2 Floor elevations for other exterior doors. Doors other than the required egress door shall be provided with landings or floors not more than 73/4 inches (196 mm) below the top of the threshold. Exception: A top landing is not required where a stairway of not more than two risers is located on the exterior side of the door. | |||
| POOL FINAL | 03/26/2026 | CANCELLED BY APPLICANT | JSTEWART |
| Note: 1/16/2026 4:27:26 PM- PREVIOUS INSPECTION NOTES 1. PREVIOUS POOL FINAL INSPECTION APPROVAL ON 01/13/26 OVERRIDDEN BY CHIEF BUILDING OFFICIAL. INSPECTION IS NOT APPROVED PER 2023 FLORIDA BUILDING CODE SECTION R318.7 BELOW. POOL DECK IS A PATIO. POOL DECK / PATIO EXCEEDS ELEVATION OF INTERIOR FINISH FLOOR ELEVATION OF HOME. PER EXCEPTION NO. 4. PATIOS ADJACENT TO MASONRY CONSTRUCTION, IF TREATED FOR TERMITES, MAY MATCH, BUT NOT EXCEED, THE FINISHED FLOOR ELEVATION OF THE HOME. THE POOL DECK / PATIO EXCEEDS THE FINISHED FLOOR ELEVATION OF THE HOME. R318.7 Inspection for termites. In order to provide for inspection for termite infestation, clearance between exterior wall coverings and final earth grade on the exterior of a building shall not be less than 6 inches (152 mm). Exceptions: l. Paint or decorative cementitious finish less than 5/8 inch (17.1 mm) thick adhered directly to the masonry foundation sidewall. 2. Access or vehicle ramps which rise to the interior finish floor elevation for the width of such ramps only. 3. A 4-inch (102 mm) inspection space above patio and garage slabs and entry areas. 4. If the patio has been soil treated for termites, the finish elevation may match the building interior finish floor elevations on masonry construction only. 5. Masonry veneers constructed in accordance with Section R318.4. 2. POOL DECK / PATIO EXCEEDS ELEVATION OF DOOR THRESHOLDS AT BATHROOM DOOR AND ENCLOSED LANAI DOOR AND IS A VIOLATION OF 2023 FLORIDA BUILDING CODE-RESIDENTIAL SECTION R311.3..2. THIS SECTION ALLOWS LANDINGS OR FLOORS UP TO 7-3/4 INCHES BELOW TOP OF DOOR THRESHOLD BUT DOES NOT PROVIDE ANY PROVISION ALLOWING FLOORS OR LANDINGS TO BE ABOVE THE TOP OF THE DOOR THRESHOLD. R311.3.2 Floor elevations for other exterior doors. Doors other than the required egress door shall be provided with landings or floors not more than 73/4 inches (196 mm) below the top of the threshold. Exception: A top landing is not required where a stairway of not more than two risers is located on the exterior side of the door. | |||
| POOL FINAL | 01/16/2026 | Disapproved - NO FEE | PBUCKLEY |
| Note: 1. PREVIOUS POOL FINAL INSPECTION APPROVAL ON 01/13/26 OVERRIDDEN BY CHIEF BUILDING OFFICIAL. INSPECTION IS NOT APPROVED PER 2023 FLORIDA BUILDING CODE SECTION R318.7 BELOW. POOL DECK IS A PATIO. POOL DECK / PATIO EXCEEDS ELEVATION OF INTERIOR FINISH FLOOR ELEVATION OF HOME. PER EXCEPTION NO. 4. PATIOS ADJACENT TO MASONRY CONSTRUCTION, IF TREATED FOR TERMITES, MAY MATCH, BUT NOT EXCEED, THE FINISHED FLOOR ELEVATION OF THE HOME. THE POOL DECK / PATIO EXCEEDS THE FINISHED FLOOR ELEVATION OF THE HOME. R318.7 Inspection for termites. In order to provide for inspection for termite infestation, clearance between exterior wall coverings and final earth grade on the exterior of a building shall not be less than 6 inches (152 mm). Exceptions: l. Paint or decorative cementitious finish less than 5/8 inch (17.1 mm) thick adhered directly to the masonry foundation sidewall. 2. Access or vehicle ramps which rise to the interior finish floor elevation for the width of such ramps only. 3. A 4-inch (102 mm) inspection space above patio and garage slabs and entry areas. 4. If the patio has been soil treated for termites, the finish elevation may match the building interior finish floor elevations on masonry construction only. 5. Masonry veneers constructed in accordance with Section R318.4. 2. POOL DECK / PATIO EXCEEDS ELEVATION OF DOOR THRESHOLDS AT BATHROOM DOOR AND ENCLOSED LANAI DOOR AND IS A VIOLATION OF 2023 FLORIDA BUILDING CODE-RESIDENTIAL SECTION R311.3..2. THIS SECTION ALLOWS LANDINGS OR FLOORS UP TO 7-3/4 INCHES BELOW TOP OF DOOR THRESHOLD BUT DOES NOT PROVIDE ANY PROVISION ALLOWING FLOORS OR LANDINGS TO BE ABOVE THE TOP OF THE DOOR THRESHOLD. R311.3.2 Floor elevations for other exterior doors. Doors other than the required egress door shall be provided with landings or floors not more than 73/4 inches (196 mm) below the top of the threshold. Exception: A top landing is not required where a stairway of not more than two risers is located on the exterior side of the door. | |||
| POOL FINAL | 01/13/2026 | FINAL APPROVED | MCONTRYMAN |
| ROW - FINAL INSPECTION | 01/13/2026 | Disapproved - NO FEE | EMADISON |
| Note: ** 01/13/26 AS INDICATED BY HOMEOWNER TO MYSELF AND RSI SUPERVISOR G. BERTOLA ONE PREVIOUS PROJECT STATUS WITH HOMEOWNER HE WOULD BE FINISHING THE STONE WORK IN REAR YARD AREA WHERE BARE EARTH IS EXPOSED. THIS WORK MUST BE COMPLETED BEFORE THE ROW STORMWATER FINAL CAN BE APPROVED. ____________________________________________________________________________________________________________________________ 1/12/2026 - PREVIOUS INSPECTION NOTES ** 01/12/26 BUILDER CANCELLED TODAYS INSPECTION CITING THAT THE HOMEOWNER IS REQUESTING A 24 HOUR NOTIFICATION BEFORE INSPECTION IS CONDUCTED INSPECTION WILL BE RE-SCHEDULED BY THE BUILDER FOR 01/13/25 | |||
| ROW - FINAL INSPECTION | 01/12/2026 | CANCELLED BY APPLICANT | EMADISON |
| Note: ** 01/12/26 BUILDER CANCELLED TODAYS INSPECTION CITING THAT THE HOMEOWNER IS REQUESTING A 24 HOUR NOTIFICATION BEFORE INSPECTION IS CONDUCTED INSPECTION WILL BE RE-SCHEDULED BY THE BUILDER FOR 01/13/25 | |||
| U -UTILITY RESIDENTIAL FINAL | 01/12/2026 | FINAL APPROVED | BWRIGHT |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/08/2026 | APPROVED | EMADISON |
| Note: ** 01/08/25 MET HOMEOWNER ON SITE WITH RSI SUPERVISOR G. BERTOLA CHECK DRAINAGE BEFORE APPROVING. ** THE FINAL SURVEY DOES NOT MATCH THE FIELD CONDITIONS ** THE DRAINAGE WILL WORK AND NOT HAVE A NEGATIVE IMPACT ON ANY ADJACENT IMPROVED PROPERTY. ____________________________________________________________________________________________________________________________ 12-19-25 TPOLACEK*** IN ADDITION TO BUILDING OFFICIALS NOTES PLEASE CALL BUILDER BEFORE FIELD SURVEY IS CONDUCTED AS HOME OWNER REQUESTS 24 HOUR NOTICE FOR INSPECTION 12/19/2025 - PREVIOUS INSPECTION NOTES 12-19-25 TPOLACEK*** SPOKE WITH BUILDER ABOUT FINAL SURVEY AND THEY REQUESTED I CANCEL INSPECTION FOR TODAY . 11/21/2025 - PREVIOUS INSPECTION NOTES 11-21-25 TPOLACEK*** FINAL SURVEY IS REQUIRED TO SHOW ALL DRAINAGE CONVEYANCES, THERE NEEDS TO BE MORE SHOTS ACROSS THE REAR TO SHOW DRAINAGE WILL NOT IMPACT ADJOINING PROPERTY IN THE REAR. RIGHT SIDE PROPERTY DOES NOT HAVE POSITIVE FALL OUOT TO THE FRONT SWALE AS APPROVED SITE PLAN INDICATES, LEFT SIDE PROPERTY IN THE FRONT IS FLAT AND DRAINAGE WILL NOT FLOW. PLEASE SEE ATTACHED PHOTO WITH EXPLANATIONS 11/20/2025 - PREVIOUS INSPECTION NOTES ** 11/20/25 BUILDER IS REQUIRED TO SUBMIT A NEW FINAL SURVEY THAT IS LEGIBLE MANY OF YOUR ELEVATION SHOTS ARE OBSCURED MAKING IT DIFFICULT TO ASSERTAIN YOUR DRAINAGE PATTERN | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/08/2026 | APPROVED | EMADISON |
| Note: ** 01/08/25 MET HOMEOWNER ON SITE WITH RSI SUPERVISOR G. BERTOLA CHECK DRAINAGE BEFORE APPROVING. ** THE FINAL SURVEY DOES NOT MATCH THE FIELD CONDITIONS ** THE DRAINAGE WILL WORK AND NOT HAVE A NEGATIVE IMPACT ON ANY ADJACENT IMPROVED PROPERTY. ____________________________________________________________________________________________________________________________ 12-19-25 TPOLACEK*** IN ADDITION TO BUILDING OFFICIALS NOTES PLEASE CALL BUILDER BEFORE FIELD SURVEY IS CONDUCTED AS HOME OWNER REQUESTS 24 HOUR NOTICE FOR INSPECTION | |||
| ROW- PROJECT STATUS | 01/08/2026 | Status Check | EMADISON |
| Note: Note to the Inspectors. Please Contatc the homeowner at 860-383-3006 Carl and coordinate the meeting with him ** 01/08/25 MET HOMEOWNER ON SITE WITH RSI SUPERVISOR G. BERTOLA CHECK DRAINAGE | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/19/2025 | CANCELLED BY APPLICANT | TPOLACEK |
| Note: 12-19-25 TPOLACEK*** SPOKE WITH BUILDER ABOUT FINAL SURVEY AND THEY REQUESTED I CANCEL INSPECTION FOR TODAY . 11/21/2025 - PREVIOUS INSPECTION NOTES 11-21-25 TPOLACEK*** FINAL SURVEY IS REQUIRED TO SHOW ALL DRAINAGE CONVEYANCES, THERE NEEDS TO BE MORE SHOTS ACROSS THE REAR TO SHOW DRAINAGE WILL NOT IMPACT ADJOINING PROPERTY IN THE REAR. RIGHT SIDE PROPERTY DOES NOT HAVE POSITIVE FALL OUOT TO THE FRONT SWALE AS APPROVED SITE PLAN INDICATES, LEFT SIDE PROPERTY IN THE FRONT IS FLAT AND DRAINAGE WILL NOT FLOW. PLEASE SEE ATTACHED PHOTO WITH EXPLANATIONS 11/20/2025 - PREVIOUS INSPECTION NOTES ** 11/20/25 BUILDER IS REQUIRED TO SUBMIT A NEW FINAL SURVEY THAT IS LEGIBLE MANY OF YOUR ELEVATION SHOTS ARE OBSCURED MAKING IT DIFFICULT TO ASSERTAIN YOUR DRAINAGE PATTERN | |||
| STEEL AND GROUND | 12/18/2025 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 12/18/25 Ground wire was seen properly bonded to the pool/water feature, which was fed up through under the pool deck pavers. It was trenched around the side and back of the pool and properly bonded to pool equipment and pool ground, for a continuous ground Inspector Notes from Inspection 2600 This inspection was for the bonding and continuity test for the equipment and metal parts of the pool/water feature. I Met the Pool Contractor and licensed Electrical Contractor on site to conduct the test. The Continuity test passed inspection. | |||
| ROW- PROJECT STATUS | 12/08/2025 | Status Check | TPOLACEK |
| Note: 12-8-25 TPOLACEK*** AT THE TIME OF THIS PROJECT STATUS INSOECTION THE HOT PATCH IS GOOD. THERE DSI A SMALL AMOUNT OF LOOSE STONES ON TOP BUT PATCH IS COMPACTED. SOD IS CUT IN TO GRADE AND MEETS COPC REQUIREMENTS AT THIS TIME. PLEASE CHECK STATUS OF HOT PATCH AND SOD IN ROW | |||
| STEEL AND GROUND | 12/03/2025 | APPROVED - AS NOTED | RMARTIN |
| Note: This inspection was for the bonding and continuity test for the equipment and metal parts of the pool/water feature. I Met the Pool Contractor and licensed Electrical Contractor on site to conduct the test. The Continuity test passed inspection. | |||
| STEEL AND GROUND | 12/01/2025 | CANCELLED BY APPLICANT | RMARTIN |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/21/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: 11-21-25 TPOLACEK*** FINAL SURVEY IS REQUIRED TO SHOW ALL DRAINAGE CONVEYANCES, THERE NEEDS TO BE MORE SHOTS ACROSS THE REAR TO SHOW DRAINAGE WILL NOT IMPACT ADJOINING PROPERTY IN THE REAR. RIGHT SIDE PROPERTY DOES NOT HAVE POSITIVE FALL OUOT TO THE FRONT SWALE AS APPROVED SITE PLAN INDICATES, LEFT SIDE PROPERTY IN THE FRONT IS FLAT AND DRAINAGE WILL NOT FLOW. PLEASE SEE ATTACHED PHOTO WITH EXPLANATIONS 11/20/2025 - PREVIOUS INSPECTION NOTES ** 11/20/25 BUILDER IS REQUIRED TO SUBMIT A NEW FINAL SURVEY THAT IS LEGIBLE MANY OF YOUR ELEVATION SHOTS ARE OBSCURED MAKING IT DIFFICULT TO ASSERTAIN YOUR DRAINAGE PATTERN | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/20/2025 | Disapproved - NO FEE | EMADISON |
| Note: ** 11/20/25 BUILDER IS REQUIRED TO SUBMIT A NEW FINAL SURVEY THAT IS LEGIBLE MANY OF YOUR ELEVATION SHOTS ARE OBSCURED MAKING IT DIFFICULT TO ASSERTAIN YOUR DRAINAGE PATTERN | |||
| POOL DECK | 11/19/2025 | APPROVED | MCONTRYMAN |
| ELECTRIC AND ALARM | 11/19/2025 | APPROVED | MCONTRYMAN |
| STEEL AND GROUND | 10/29/2025 | APPROVED | FWILLIS |
| SUBGRADE - FIBERGLASS POOL | 10/23/2025 | CANCELLED BY APPLICANT | WEB |
| Note: 10/21/2025 - PREVIOUS INSPECTION NOTES Still digging. Subgrade to be installed by 10/22/25 in the afternoon | |||
| SUBGRADE - FIBERGLASS POOL | 10/22/2025 | APPROVED | FWILLIS |
| Note: New inspection due to canceled inspection 10/21/2025 - PREVIOUS INSPECTION NOTES Still digging. Subgrade to be installed by 10/22/25 in the afternoon | |||
| SUBGRADE - FIBERGLASS POOL | 10/21/2025 | CANCELLED BY APPLICANT | MCONTRYMAN |
| Note: Still digging. Subgrade to be installed by 10/22/25 in the afternoon |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 12/16/2025 | 12/16/2025 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Not able to process final survey there is a inspection scheduled 12/18. | |||
| BADMIN | INFORMATION | 11/19/2025 | 11/19/2025 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Unable to result final survey because the one of the inspections today is not resulted yet. Please wait until that inspection is resulted to upload final survey. | |||
| BADMIN | INFORMATION | 11/18/2025 | 11/18/2025 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Unable to process final survey because there are prior inspections needed. Please resubmit final survey after prior inspections are passed. | |||
| BFLOOD | CANCEL | 10/15/2025 | 10/16/2025 |
| BLD | COMPLETE | 10/15/2025 | 10/20/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 10/15/2025 | 10/20/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/15/2025 | 10/16/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| RSI | COMPLETE | 10/15/2025 | 10/16/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM DRAINAGE MUST MEET ALL CITY OF PALM COAST STANDARDS | |||
| ZON | COMPLETE | 10/15/2025 | 10/15/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 10/27/2025 |
| RSI FIELD SURVEY INSPECTION | ¤48.75 | 10/20/2025 |
| RSI PLAN REVIEW NEW | ¤48.75 | 10/20/2025 |
| RSI FNL SURVEY/GRADING CERT | ¤48.75 | 10/20/2025 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 10/20/2025 |
| SURCHARGE FS 533.721 | ¤2.55 | 10/20/2025 |
| SURCHARGE - FS 468.631 | ¤3.83 | 10/20/2025 |
| SITE PLAN 30 | ¤30.00 | 10/20/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/20/2025 |
| INSPECTION- POOL | ¤160.00 | 10/20/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤65.00 | 10/20/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤473.88 |