I want to search for...
Permit #2025100494
Permit Details
Status: INSPECT
| Parcel Id: 07-11-31-7002-00040-0100 |
| Block: 00040 |
| Subdivision: 2218 - SECTION 2-FLORIDA PARK |
| Job Phone: 407-448-8644 |
| Location Address: 14 FANWOOD CT |
| Type: SW - SEAWALL |
| Issue Date: 10/20/2025 |
| NOC: RECORDED |
| Applicant name: LARRY BRUCE SCHNAPPER |
| Owner: WHALEN ANGELA TRUSTEE |
|
Address 14 FANWOOD COURT PALM COAST, FL 32137 |
| Lot: 0100 |
| Contracted Stated Job Value: ¤33,388.00 |
| Job Description: SEAWALL REF # 2021020646 |
| Type: CN |
| Original Permit #: 2021020646 |
Contractor
LBS CONSTRUCTION SERVICES INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
410 EAST PACKWOOD AVE MAITLAND, FL 32751 |
CGCA27951 (Exp: 08/31/2026) | 407-448-8644 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW- PROJECT STATUS | 02/17/2026 | APPROVED | GBERTOLA |
| Note: We perform an inspection on site 14 Fanwood Ct, looking for erosion on the canal. From the bulkhead to the bottom 4ft according to the City standards, Drawing#1100. (J) Bulkhead | |||
| ROW - FINAL INSPECTION | 12/29/2021 | CANCELLED BY APPLICANT | WEB |
| Note: Applicant will need to provide a survey of the canal bottom to show a continuous profile one lot over in both directions | |||
| ROW - FINAL INSPECTION | 12/29/2021 | Disapproved - NO FEE | KRUTH |
| Note: New inspection due to canceled inspection Applicant will need to provide a survey of the canal bottom to show a continuous profile one lot over in both directions failed pending open code case for survey of canal bottom | |||
| ROW ILLICIT DISCHARGE | 09/17/2021 | Disapproved - NO FEE | KRUTH |
| Note: THIS IS A REINSPECTION ADDED ON 8/10/2021 11:46:05 AM I met with Code Enforcement on site. The contractor was actively jetting the sediment into the channel of the canal. The applicant must remove all sediment that washed into the canal. waiting on a durvey to show the contour of the bottom of canal | |||
| ROW ILLICIT DISCHARGE | 08/10/2021 | Disapproved -FEE REQUIRED | CTROHA |
| Note: I met with Code Enforcement on site. The contractor was actively jetting the sediment into the channel of the canal. The applicant must remove all sediment that washed into the canal. Before final ROW can be approved the applicant will need to provide a survey of the canal bottom to show a continuous profile one lot over in both directions | |||
| ROW - DRAINAGE | 07/06/2021 | APPROVED - AS NOTED | KRUTH |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Photo's Attached. Major sediment washout into the waterway. Builder notified that a Turbidity barrier needs to first be installed. Then all sediment washout must be removed from the canal. Then a silt fence needs to be installed along the newly constructed seawall. NOTE: An immediate $40.00 fee is being added to an initial drainage inspection due to the agregeous violation of city codes and ordanences. A follow up inspection will be done on 6/24/21 to ensure that builder has followed through on the above mentioned violoation corrections needed. 6/24/21 corrections made but there is still alot of sediment along the edge of the seawall that will need to be removed it needs to be 4 foot deep along the seawall all corrections have been made | |||
| ROW - DRAINAGE | 06/24/2021 | Disapproved -FEE REQUIRED | KRUTH |
| Note: THIS IS A REINSPECTION Photo's Attached. Major sediment washout into the waterway. Builder notified that a Turbidity barrier needs to first be installed. Then all sediment washout must be removed from the canal. Then a silt fence needs to be installed along the newly constructed seawall. NOTE: An immediate $40.00 fee is being added to an initial drainage inspection due to the agregeous violation of city codes and ordanences. A follow up inspection will be done on 6/24/21 to ensure that builder has followed through on the above mentioned violoation corrections needed. 6/24/21 corrections made but there is still alot of sediment along the edge of the seawall that will need to be removed it needs to be 4 foot deep along the seawall | |||
| ROW - DRAINAGE | 06/21/2021 | Disapproved -FEE REQUIRED | RGROSS |
| Note: Photo's Attached. Major sediment washout into the waterway. Builder notified that a Turbidity barrier needs to first be installed. Then all sediment washout must be removed from the canal. Then a silt fence needs to be installed along the newly constructed seawall. NOTE: An immediate $40.00 fee is being added to an initial drainage inspection due to the agregeous violation of city codes and ordanences. A follow up inspection will be done on 6/24/21 to ensure that builder has followed through on the above mentioned violoation corrections needed. | |||
| SEAWALL DEADMAN CAP | 04/08/2021 | APPROVED | BGREVE |
| TURBIDITY BARRIER | 03/05/2021 | APPROVED | MMESSER |
| Note: THIS IS A REINSPECTION TURBIDITY BARRIER not properly placed (does not encompass complete area of work) | |||
| TURBIDITY BARRIER | 03/01/2021 | Disapproved - NO FEE | WMILLER |
| Note: TURBIDITY BARRIER not properly placed (does not encompass complete area of work) | |||
| SEAWALL FINAL | |||
| ROW - DRAINAGE | |||
| ROW - FINAL INSPECTION | |||
| Note: 2/17/26= Please refrain from approving this inspection until you have spoken with Patrick Buckley and Gabriel Bertola. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ New inspection due to canceled inspection Applicant will need to provide a survey of the canal bottom to show a continuous profile one lot over in both directions failed pending open code case for survey of canal bottom |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 02/13/2026 | 02/17/2026 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/15/2025 | 10/20/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 08/02/2022 | 08/02/2022 |
| Note: Marked INFORMATION By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM PERMITS HAS EXPIRED NO EXTENSION GRANTED NEEDS APPLY FOR A NEW PERMIT | |||
| ZON | COMPLETE | 02/16/2021 | 02/16/2021 |
| Note: Released By: TDOAK | |||
| ENGIN1 | COMPLETE | 02/11/2021 | 02/11/2021 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 02/11/2021 | 02/16/2021 |
| Note: Released By: KRUTH | |||
| ZON | HOLD | 02/11/2021 | 02/11/2021 |
| Note: Held By: TDOAK Plans must always state color of proposed seawall. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| RSI ROW FINAL INSPECTION | ¤16.25 | 10/20/2025 |
| SURCHARGE FS 533.721 | ¤2.00 | 10/20/2025 |
| SURCHARGE - FS 468.631 | ¤2.34 | 10/20/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 10/20/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 10/20/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 10/20/2025 |
| STORMWATER REINSPECTION FEE | ¤40.00 | 10/20/2025 |
| STORMWATER REINSPECTION FEE | ¤40.00 | 10/20/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/20/2025 |
| EXTENSION | ¤40.00 | 10/20/2025 |
| EXTENSION | ¤40.00 | 10/20/2025 |
| INSPECTION - RESIDENTIAL | ¤93.50 | 10/20/2025 |
| PLAN REVIEW - MISC 32.50 | ¤32.50 | 10/20/2025 |
| RSI REINSPECTION 1 | ¤35.00 | |
| Fees | Total Due: ¤35.00 | Total Paid: ¤396.59 |