I want to search for...
Permit #2025100861
Permit Details
Status: INSPECT
| Parcel Id: 07-11-31-7037-00260-0010 |
| CONDITIONED SPACE: 2400 sqft |
| GARAGE: 566 sqft |
| OPENED PORCH (WITH ROOF) : 350 sqft |
| Total Square Footage: 3316 sqft |
| Block: 00260 |
| Subdivision: - |
| Job Phone: 386-283-2035 |
| Location Address: 12 LYONS PL |
| Type: DU - DUPLEX |
| Issue Date: 11/12/2025 |
| NOC: RECORDED |
| Applicant name: OLEG BELINSKIY |
| Owner: SELIC TONY |
|
Address 2540 SOUTHEAST 2ND STREET POMPANO BEACH, FL 33062 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤350,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
FLORIDAS BEST BUILDERS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE PALM COAST, FL 32164 |
CBC1264760 (Exp: 08/31/2026) | 386-283-2035 |
Sub Contractors
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
TIMUR ISPARYAN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
3665 SPRINK PARK ROAD JACKSONVILLE , FL 32207 |
CMC1249968 (Exp: 08/31/2026) | 904-245-1818 | 904-337-1910 |
SERGEY A VORONIN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
7631 SEVERN JACKSONVILLE, FL 32224 |
EC13011326 (Exp: 08/31/2026) | 360-798-2819 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW- PRE-APRON (PRE-POUR) | 06/09/2026 | APPROVED | TPOLACEK |
| Note: READY FOR PAVERS AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 6/4/2026 - PREVIOUS INSPECTION NOTES ** 06/04/26 READY TO POUR APRON AND PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300, E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED _________________________________________________________________________________________________________________________ | |||
| ROW- PRE-APRON (PRE-POUR) | 06/04/2026 | PARTIALLY APPROVED | EMADISON |
| Note: ** 06/04/26 READY TO POUR APRON AND PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300, E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED _________________________________________________________________________________________________________________________ | |||
| ROW- PAVER RESTRAINTS | 06/04/2026 | APPROVED | EMADISON |
| Note: ** 06/04/26 READY TO POUR APRON AND PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300, E RESIDENTIAL CULVERT DETAIL | |||
| ELECTRIC - EARLY POWER | 04/06/2026 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 4/6/26 Email sent to FPL | |||
| GRAVITY SEWER TEST | 03/31/2026 | APPROVED | KSANDOE |
| SEWER TIE IN | 03/31/2026 | APPROVED | KSANDOE |
| PEP TANK INSTALLATION REQUEST | 03/10/2026 | APPROVED | ISANDERSON |
| INSULATION | 02/19/2026 | APPROVED | CVANSTRAHLEN |
| LATH/BRICK/ WATER BARRIER | 02/18/2026 | APPROVED | MCONTRYMAN |
| ALL ROUGH | 02/11/2026 | APPROVED | MCONTRYMAN |
| FIREWALL FINAL | 02/02/2026 | APPROVED | JSTEWART |
| Note: Inspector Notes from Inspection 2467 1/29/26 Please have dumpster onsite by next inspection | |||
| ROOF VALLEY & METAL | 01/29/2026 | APPROVED - AS NOTED | MKRASKI |
| Note: 1/29/26 Please have dumpster onsite by next inspection | |||
| FIREWALL DRYWALL NAILING | 01/28/2026 | APPROVED | MCONTRYMAN |
| WALL SHEATHING | 01/23/2026 | APPROVED | JSTEWART |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/23/2026 | APPROVED | JSTEWART |
| FIREWALL FRAMING | 01/23/2026 | APPROVED | JSTEWART |
| TIE BEAM / LINTEL | 01/08/2026 | APPROVED | MCONTRYMAN |
| MONOLITHIC SLAB | 12/11/2025 | APPROVED | MCONTRYMAN |
| Note: 12/10/2025 - PREVIOUS INSPECTION NOTES 12/10/25 1. Missing several areas of rebar 2. Missing form boards in several areas 3. Have a root on left side that needs to be cut away --Please reschedule only when job site is ready for inspection | |||
| MONOLITHIC SLAB | 12/10/2025 | Disapproved -FEE REQUIRED | MCONTRYMAN |
| Note: 12/10/25 1. Missing several areas of rebar 2. Missing form boards in several areas 3. Have a root on left side that needs to be cut away --Please reschedule only when job site is ready for inspection | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 12/05/2025 | APPROVED | MGIBSON |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 12/02/2025 | APPROVED | RRICKS |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 12/01/2025 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 11/19/2025 | APPROVED | CBOWERMASTER |
| ROW- PRE-APRON (PRE-POUR) | |||
| Note: THIS PRE POUR IS DUE TO UTILITY DEPT NEEDING TO MOVE PEP TANK AND THEY WILL BE DMAGING PAVER RESTRAINTS WHILE MAKING CORRECTIONS. ONCE PEP TANK IS RELOCATED AND WORK IS DONE BUILDER WILL NEED TO HAVE A NEW PRE POUR INSPECTION FOR PAVER RESTRAINTS. | |||
| BLD - BUILDING FINAL | |||
| U-CROSS CONNECTION | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 01/22/2026 | 01/26/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 01/22/2026 | 01/26/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 01/19/2026 | 01/20/2026 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Changes on revisions need to be bubbled. no changes indicated on plans. | |||
| ELEC | HOLD | 01/19/2026 | 01/20/2026 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Bubble or highlight changes. | |||
| SW1 | COMPLETE | 12/18/2025 | 12/18/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/18/2025 | 12/18/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/02/2025 | 12/02/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/02/2025 | 12/02/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/01/2025 | 12/01/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/05/2025 | 11/05/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 10/24/2025 | 10/30/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/23/2025 | 10/28/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 10/23/2025 | 11/04/2025 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 10/23/2025 | 10/27/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/23/2025 | 10/24/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 10/23/2025 | 10/27/2025 |
| LOCATE | COMPLETE | 10/23/2025 | 10/30/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/23/2025 | 10/27/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/23/2025 | 10/27/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 10/23/2025 | 10/24/2025 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Floor plan: provide the depth of garage on the floor plan. Landscape plan: One tree for every 2500 square ft. All calculations are rounded to the nearest whole number. This property requires 6 trees. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| FC IMPACT FEE EMS | ¤124.00 | 11/12/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤436.00 | 11/12/2025 |
| FC IMPACT FEE LIBRARY | ¤536.00 | 11/12/2025 |
| FIRE RES IMPACT FEE 10-25 | ¤1,884.00 | 11/12/2025 |
| PEP TANK INSTALL | ¤1,513.48 | 11/12/2025 |
| PARKS IMPACT FEE 10-25 | ¤6,328.00 | 11/12/2025 |
| RSI DRIVEWAY AFTER POUR | ¤16.25 | 11/12/2025 |
| RSE DRIVE PRE POUR INSPECTION | ¤32.50 | 11/12/2025 |
| RSI FIELD SURVEY INSPECTION | ¤48.75 | 11/12/2025 |
| RSI FORMBOARD REVIEW | ¤16.25 | 11/12/2025 |
| RSI PLAN REVIEW NEW | ¤48.75 | 11/12/2025 |
| RSI FNL SURVEY/GRADING CERT | ¤48.75 | 11/12/2025 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 11/12/2025 |
| SCHOOL BOARD IMPACT FEE RES | ¤10,900.00 | 11/12/2025 |
| WASTEWATER MAIN EXTENSION IMPA | ¤4,770.00 | 11/12/2025 |
| SURCHARGE FS 533.721 | ¤17.03 | 11/12/2025 |
| SURCHARGE - FS 468.631 | ¤25.55 | 11/12/2025 |
| SW ENG RES REVIEW 240 | ¤240.00 | 11/12/2025 |
| WATER METER W/ TAP | ¤4,653.86 | 11/12/2025 |
| TRANS DUPLEX 10-25 | ¤9,177.60 | 11/12/2025 |
| SEWER CREDIT | (¤1,700.00) | 11/12/2025 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 11/12/2025 |
| WASTEWATER PERM REVIEW | ¤100.00 | 11/12/2025 |
| SEWER CAPITAL FACILITY | ¤8,830.00 | 11/12/2025 |
| WATER CAPITAL FACILITY FEE | ¤7,580.98 | 11/12/2025 |
| WATER PERMIT INSPECTION | ¤80.00 | 11/12/2025 |
| WATER MAIN EXTENSION IMPACT | ¤1,834.54 | 11/12/2025 |
| SITE PLAN 30 | ¤30.00 | 11/12/2025 |
| WATER- TURN ON | ¤100.00 | 11/12/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/12/2025 |
| INSPECTION - RESIDENTIAL | ¤1,303.50 | 11/12/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤369.72 | 11/12/2025 |
| PLAN REVIEW - REVISION | ¤32.50 | |
| REINSPECTION RESIDENTIAL | ¤40.00 | |
| Fees | Total Due: ¤72.50 | Total Paid: ¤59,471.76 |