Permit #2025100895

Permit Details

Status: INSPECT

Parcel Id: 04-11-30-5160-00000-00U0
Block: 00000
Subdivision: 2317 - REVERIE SUBDIVISION PHASE 1
Job Phone: 904-772-1316
Location Address: 1 REVERIE DR N
Type: CAS - COMMERCIAL ACCESSORY STRUCTURE
Issue Date: 11/07/2025
NOC: RECORDED
Applicant name: AARON JAMES GALLEY
Owner: SPRING LAKE ASSET LLC

Address

206 WILD BASIN ROAD

AUSTIN, TX 78746

Lot: 00U0
Contracted Stated Job Value: ¤7,500.00
Job Description: Mail Kiosk Shade Structure
Type: CN

Contractor

K & G CONSTRUCTION CO INC
Status Location Address State License Number Phone
ACTIVE

542 EDGEWOOD AVE S

JACKSONVILLE, FL 32205

CGC1511097 (Exp: 08/31/2026) 904-772-1316

Inspection History

Type Request Date Result Inspector
LDSC- LANDSCAPE FINAL 03/24/2026 Disapproved - NO FEE RPICATAGI
Note: 1. THERE IS A SIGNIFICANT MULCH DEFICEINCY THROUGHOUT THE PROJECT THAT NEEDS TO BE CORRECTED PRIOR TO FINAL APPROVAL. Approved Plan L.04/Landscape Details calls for 3" THICK MULCH LAYER on all tree and shrub plantng details. Examination of mulch beds shows average of 1" of mulch. Contractor shall apply an additional 2" of mulch througout beds (AN ADDITIONAL 200% of existing mulch volume and thickness). The next inspection will include a mulch depth check in all areas. 2. THERE IS ALSO A PROBLEM OF MULCH ADJACENT TO PAVED SURFACES THAT MUST BE CORRECTED PRIOR TO FINAL APPROVAL. Where mulch beds are adjacent to pavers or concrete walks, a 6 inch wide area from edge of pavement must include the removal of soil and mulch to a depth the 3". After those areas have been raked back, the full 3 inch mulch layer shall be applied so that the top of the 3" thick Layer of mulch is flush with pavement. 3. Comments 1 and 2 above pertain to all areas within the amenity center, but especially to the FRONT MAIN ENTRY WAY, THE NORTH BERM AND THE BEDS ADJACENT TO POOL AND HOT TUB. 4. Several tall palm trees are leaning and are "out of plumb". All palm trees shall be re-staked to make all such trees perpendicular the the earth's surface 5. Many/all Dwarf Date Palms have had fronds die back due to recent cold snap. It is anticipated , with the onset of warmer weather, that these palms wiill recover and regrow fronds. It is the responsibility of the landscape contractor to monitor all such palms through the revovery period and replance those that do not recover.
MONOLITHIC SLAB 03/03/2026 Approval - Private Provider PPROVIDER
ACCESSORY FINAL 03/03/2026 Approval - Private Provider PPROVIDER
FOOTER 12/02/2025 Approval - Private Provider PPROVIDER
LDSC- LANDSCAPE FINAL
Note: 3/24/2026 4:15:18 PM- PREVIOUS INSPECTION NOTES 1. THERE IS A SIGNIFICANT MULCH DEFICEINCY THROUGHOUT THE PROJECT THAT NEEDS TO BE CORRECTED PRIOR TO FINAL APPROVAL. Approved Plan L.04/Landscape Details calls for 3" THICK MULCH LAYER on all tree and shrub plantng details. Examination of mulch beds shows average of 1" of mulch. Contractor shall apply an additional 2" of mulch througout beds (AN ADDITIONAL 200% of existing mulch volume and thickness). The next inspection will include a mulch depth check in all areas. 2. THERE IS ALSO A PROBLEM OF MULCH ADJACENT TO PAVED SURFACES THAT MUST BE CORRECTED PRIOR TO FINAL APPROVAL. Where mulch beds are adjacent to pavers or concrete walks, a 6 inch wide area from edge of pavement must include the removal of soil and mulch to a depth the 3". After those areas have been raked back, the full 3 inch mulch layer shall be applies so that the top of the 3" thick Layer of mulch is flush with pavement. 3. Comments 1 and 2 above pertain to all areas withing the amenity center, but especially to the FRONT MAIN ENTRYWAY, THE NORTH BERM AND THE BEDS ADJAENT TO POOL AND HOT TUB. 4. Several tall palm trees are leaning and are "out of plumb". All palm trees shall be re-staked to make all such trees perpendicular the the earth's center. 5. Many/all Dwarf Date Palms have had fronds die back due to recent cold snap. It is anticipated , with the onset of warmer weather, that these palms wiill recover and regrow fronds. It is the responsibility of the landscape contractor to monitor all such palms through the revovery period and replance those that do not recover.

Review History

Department Status Date In Date Out
ARCHR COMPLETE 10/23/2025 11/06/2025
Note: Released By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM
BFLOOD CANCEL 10/23/2025 10/30/2025
BLD COMPLETE 10/23/2025 10/31/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
DSD COMPLETE 10/23/2025 10/28/2025
Note: Released By: JACQUELINE GONZALEZ - (386)986-3751 - JGONZALEZ@PALMCOASTGOV.COM
ELEC COMPLETE 10/23/2025 11/04/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
FI1 COMPLETE 10/23/2025 11/04/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
PLENG COMPLETE 10/23/2025 10/23/2025
Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM
UD1 COMPLETE 10/23/2025 11/03/2025
Note: Released By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMINISTRATIVE - COMMERCIAL PP ¤450.00 11/07/2025
ADMINISTRATIVE - COMMERCIAL ¤75.00 11/07/2025
INSPECTION - FIRE COMMERCIAL ¤2.00 11/07/2025
PLAN REVIEW - COMMERCIAL ¤67.00 11/07/2025
SURCHARGE FS 533.721 ¤5.94 11/07/2025
SURCHARGE - FS 468.631 ¤8.91 11/07/2025
SITE PLAN 30 ¤30.00 11/07/2025
Fees Total Due: ¤0.00 Total Paid: ¤638.85