I want to search for...
Permit #2025110222
Permit Details
Status: INSPECT
| Parcel Id: 07-11-31-7031-00270-0040 |
| OPENED PORCH (WITH ROOF) : 249 sqft |
| GARAGE: 524 sqft |
| CONDITIONED SPACE: 1873 sqft |
| Total Square Footage: 2646 sqft |
| Block: 00270 |
| Subdivision: - |
| Job Phone: 352-433-8382 |
| Location Address: 8 RICKER PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/03/2025 |
| NOC: RECORDED |
| Applicant name: ALFREDO E SCHEER |
| Owner: ACEVEDO LARA CRISTINA SANTOS & ET AL |
|
Address 428 E SHORELINE DR N AUGUSTA, SC 29841 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤165,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
ESTELA LIVING LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
237 S. DIXIE HWY, 4TH FLOOR CORAL GABLES, FL 33133 |
CGC1534535 (Exp: 08/31/2026) | 352-433-8382 |
Sub Contractors
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
CAC043953 (Exp: 08/31/2026) | 877-906-1113 |
Inspection History
| Type | Request Date | Result | Inspector |
| GRAVITY SEWER TEST | 05/28/2026 | APPROVED | CVANSTRAHLEN |
| SEWER TIE IN | 05/28/2026 | APPROVED | CVANSTRAHLEN |
| ROW- PRE-APRON (PRE-POUR) | 05/27/2026 | APPROVED | FSLADISH |
| Note: 5/27/26 WITH RAIN IN THE FORECAST IT IS THE BUILDERS RESPONSIBILITY TO ENSURE THAT ALL WATER IS OUT OF POUR AREA, IT IS PROPERLY COMPACTED AND THE PIPE ELEVATION HAS NOT CHANGED SINCE THIS INSPECTION. PIPE INVERT IS GOOD AT TIME OF THIS INSPECTION. BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED. DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER AND VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. 5/11/2026 - PREVIOUS INSPECTION NOTES 5/11/26 RECEIVED A CALL FROM JIM CM ASKING TO PLEASE CANCEL PREPOUR INSPECTION FOR TODAY. CANCELLING AS A COURTESY. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/11/2026 | CANCELLED BY APPLICANT | FSLADISH |
| Note: 5/11/26 RECEIVED A CALL FROM JIM CM ASKING TO PLEASE CANCEL PREPOUR INSPECTION FOR TODAY. CANCELLING AS A COURTESY. | |||
| ELECTRIC - EARLY POWER | 05/06/2026 | APPROVED | CVANSTRAHLEN |
| PEP TANK INSTALLATION REQUEST | 03/30/2026 | APPROVED | ISANDERSON |
| DRYWALL NAILING | 03/25/2026 | APPROVED | CVANSTRAHLEN |
| Note: 3/24/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1-NEC-200.6 (B)-Side 4 AWG or large an isulated grounded conductor shall be identified ( electrical main panel) do not covert electrical panel in garage untill fix item and is inspected | |||
| DRYWALL NAILING | 03/24/2026 | PARTIALLY APPROVED | CVANSTRAHLEN |
| Note: Please fix items before next inspection #1-NEC-200.6 (B)-Side 4 AWG or large an isulated grounded conductor shall be identified ( electrical main panel) do not covert electrical panel in garage untill fix item and is inspected | |||
| ELECTRIC UNDERGROUND | 03/19/2026 | CANCELLED BY INSPECTOR | RMARTIN |
| Note: 3/19/26 Only schedule inspections that is loaded on your permit, If you are wanting power you need to wait until you are ready for your "early power" inspection... Drywall installed and all conductors and panel safed off. If you are wanting power prior to that, then you would need to have an underground service and schedule a "TUG" inspection when you have that ready. For any questions you can call me Robert Martin 386-986-7848 3/9/2026 - PREVIOUS INSPECTION NOTES | |||
| INSULATION | 03/18/2026 | APPROVED | HCAMACHO |
| Note: 3/17/2026 - PREVIOUS INSPECTION NOTES 5ft Head still failed. Inspector Notes from Inspection 2420 5ft head test failed. 3/11/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection all rough inspection need to be approved first | |||
| INSULATION | 03/17/2026 | Disapproved -FEE REQUIRED | PKNAPIK |
| Note: 5ft Head still failed. Inspector Notes from Inspection 2420 5ft head test failed. 3/11/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection all rough inspection need to be approved first | |||
| LATH/BRICK/ WATER BARRIER | 03/16/2026 | APPROVED | KSANDOE |
| ALL ROUGH | 03/16/2026 | APPROVED - AS NOTED | KSANDOE |
| Note: 5ft head test failed. 3/11/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection all rough inspection need to be approved first | |||
| ALL ROUGH | 03/11/2026 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: Please fix items before next inspection all rough inspection need to be approved first | |||
| WALL SHEATHING | 03/09/2026 | APPROVED | CVANSTRAHLEN |
| ELECTRIC UNDERGROUND | 03/09/2026 | CANCELLED BY APPLICANT | CVANSTRAHLEN |
| ROOF VALLEY & METAL | 03/02/2026 | APPROVED | CVANSTRAHLEN |
| Note: 2/27/2026 - PREVIOUS INSPECTION NOTES 2-27-26 1. Missing drip edge on front entry way. | |||
| ROOF VALLEY & METAL | 02/27/2026 | Disapproved - NO FEE | BTAYLOR |
| Note: 2-27-26 1. Missing drip edge on front entry way. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/24/2026 | APPROVED | CVANSTRAHLEN |
| Note: Inspector Notes from Inspection 2340 Please removed lumber next to contruction side , cant not place lumber in the swale FBC 3303.5-SWALE CLEAR | |||
| TIE BEAM / LINTEL | 02/10/2026 | APPROVED - AS NOTED | CVANSTRAHLEN |
| Note: Please removed lumber next to contruction side , cant not place lumber in the swale FBC 3303.5-SWALE CLEAR | |||
| MONOLITHIC SLAB | 02/02/2026 | Disapproved - NO FEE | CVANSTRAHLEN |
| Note: FBCR 506.2.1-TERMITE TREATMENT OR NOTICE OF INTENT FOR BORACARE | |||
| MONOLITHIC SLAB | 02/02/2026 | APPROVED | CVANSTRAHLEN |
| Note: E | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 01/29/2026 | APPROVED | JSTEWART |
| ELECTRIC UNDERGROUND | 01/29/2026 | CANCELLED BY APPLICANT | WEB |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 01/28/2026 | APPROVED | TDOAK |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 01/26/2026 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 12/29/2025 | APPROVED | CBOWERMASTER |
| U-CROSS CONNECTION | |||
| BLD - BUILDING FINAL | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 03/13/2026 | 03/18/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/28/2026 | 01/28/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/28/2026 | 01/28/2026 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/23/2026 | 01/26/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 01/22/2026 | 01/22/2026 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM PLEASE RENAME YOUR FILE CORRECTLY. SEE THE DOCUMENT SUBMITTAL REQUIREMENTS ON THE PERMIT PORTAL PAGE FOR ADDITIONAL INFORMATION. | |||
| SW1 | COMPLETE | 11/25/2025 | 12/03/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/25/2025 | 12/01/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 11/19/2025 | 11/24/2025 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM THE ELEVATIONS IN THE LOT TO THE RIGHT OF THE PROPOSED LOT NEED TO HAVE EXISTING ELEVATIONS NOT ESTIMATED | |||
| MECH | COMPLETE | 11/19/2025 | 11/20/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/19/2025 | 11/25/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 11/07/2025 | 12/03/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| BLD | HOLD | 11/06/2025 | 11/14/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Truss plan packet cover sheet or first page needs include the design professional of record (building design engineer or architect) approval stamp indicating acceptance and approval of truss design (Not wet seal) | |||
| CUSVC | COMPLETE | 11/06/2025 | 11/12/2025 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 11/06/2025 | 11/10/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/06/2025 | 11/07/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 11/06/2025 | 11/07/2025 |
| LOCATE | COMPLETE | 11/06/2025 | 11/10/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 11/06/2025 | 11/10/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Indoor design temp on heatload must be a minimum of 75 degrees per R302.1 FBC Energy Conservation 2023 8Th edition | |||
| SW1 | HOLD | 11/06/2025 | 11/06/2025 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Grading Plan Comments: - Estimated elevations are not allowed. Please submit actual elevations - this will clearly depict what is needed to move the water to front of the home and ensure that no lot is negatively impacted. | |||
| ZON | COMPLETE | 11/06/2025 | 11/07/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| FC IMPACT FEE EMS | ¤62.00 | 12/03/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 12/03/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 12/03/2025 |
| FIRE RES IMPACT FEE 10-25 | ¤942.00 | 12/03/2025 |
| PEP TANK INSTALL | ¤756.74 | 12/03/2025 |
| PARKS IMPACT FEE 10-25 | ¤3,164.00 | 12/03/2025 |
| RSI DRIVEWAY AFTER POUR | ¤16.25 | 12/03/2025 |
| RSE DRIVE PRE POUR INSPECTION | ¤32.50 | 12/03/2025 |
| RSI FIELD SURVEY INSPECTION | ¤48.75 | 12/03/2025 |
| RSI FORMBOARD REVIEW | ¤16.25 | 12/03/2025 |
| RSI PLAN REVIEW NEW | ¤48.75 | 12/03/2025 |
| RSI FNL SURVEY/GRADING CERT | ¤48.75 | 12/03/2025 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 12/03/2025 |
| SCHOOL BOARD IMPACT FEE RES | ¤5,450.00 | 12/03/2025 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,385.00 | 12/03/2025 |
| SURCHARGE FS 533.721 | ¤13.50 | 12/03/2025 |
| SURCHARGE - FS 468.631 | ¤20.25 | 12/03/2025 |
| SW ENG RES REVIEW 240 | ¤240.00 | 12/03/2025 |
| WATER METER W/ TAP | ¤2,326.93 | 12/03/2025 |
| TRANSP RES IMPACT FEE 10-25 | ¤7,061.21 | 12/03/2025 |
| SEWER CREDIT | (¤1,466.00) | 12/03/2025 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 12/03/2025 |
| WASTEWATER PERM REVIEW | ¤25.00 | 12/03/2025 |
| SEWER CAPITAL FACILITY | ¤4,415.00 | 12/03/2025 |
| WATER CAPITAL FACILITY FEE | ¤3,790.49 | 12/03/2025 |
| WATER PERMIT REVIEW | ¤25.00 | 12/03/2025 |
| WATER MAIN EXTENSION IMPACT | ¤917.27 | 12/03/2025 |
| SITE PLAN 30 | ¤30.00 | 12/03/2025 |
| WATER- TURN ON | ¤50.00 | 12/03/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 12/03/2025 |
| INSPECTION - RESIDENTIAL | ¤1,028.50 | 12/03/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤291.72 | 12/03/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | |
| REINSPECTION RESIDENTIAL | ¤40.00 | |
| Fees | Total Due: ¤80.00 | Total Paid: ¤32,352.11 |