I want to search for...

Permit #2025110306

Permit Details

Status: COED

Parcel Id: 21-12-31-5560-00000-0810
CONDITIONED SPACE: 1815 sqft
GARAGE: 432 sqft
OPENED PORCH (WITH ROOF) : 112 sqft
OPENED PORCH (WITH ROOF) : 57 sqft
Total Square Footage: 2416 sqft
Subdivision: 2336 - SEMINOLE PALMS SUBDIVISION PHASE 1
Job Phone: 407-717-5418
Location Address: 282 MONTGOMERY CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/11/2025
NOC: RECORDED
Applicant name: CARLOS ANTONIO SERRANO
Owner: CRE-KL SEMINOLE WOODS OWNER LLC

Address

14025 RIVEREDGE DRIVE

TAMPA, FL 33637

Address

SUITE 175

TAMPA, FL 33637

Lot: 81
Contracted Stated Job Value: ¤91,740.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

RYAN HOMES
Status Location Address Mailing Address State License Number Phone
ACTIVE

8649 BAYPINE RD

JACKSONVILLE, FL 32256

BLDG 7, STE 202

JACKSONVILLE, FL 32256

CBC1256450 (Exp: 08/31/2026) 407-717-5418

Sub Contractors

JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
JOSEPH H STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PKWY

SANFORD, FL 32771

CAC043953 (Exp: 08/31/2026) 877-906-1113
JACK DOUGLAS LANIER
Status Location Address State License Number Phone Fax
ACTIVE

485 COMMERCE WAY

LONGWOOD , FL 32750

CCC058022 (Exp: 08/31/2026) (321)441-2300 (321)441-2313
BRITT MICHAEL JENKINS
Status Location Address State License Number Phone
ACTIVE

86 COLUMBIA DR

POOLER, GA 31322

CFC1430770 (Exp: 08/31/2026) 912-330-8151

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 03/19/2026 FINAL APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 3/19/2026 3:32:43 PM *** Final Approved 3/16/2026 - PREVIOUS INSPECTION NOTES 3/16/26: Cancelled in person by Applicant due to epoxy coating still drying at entry along with some work in progress. Items checked and approved > smokes, exterior (except roof and goosenecks, etc., bathrooms, GFCI outlets, range anti-tip.
U-CROSS CONNECTION 03/17/2026 APPROVED BWRIGHT
ROW - FINAL INSPECTION 03/17/2026 APPROVED FSLADISH
Note: 3/17/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ________________________________________________________________________________________________________________________________ *** INSPECTORS NOTE. BUILDER IS REQUIRED TO SOD AREA BETWEEN END OF RIGHT SIDE SIDEWALK AND SILT FENCE BEFORE ROW FINAL PASSAGE. ***
U -UTILITY RESIDENTIAL FINAL 03/17/2026 FINAL APPROVED BWRIGHT
BLD - BUILDING FINAL 03/16/2026 CANCELLED BY APPLICANT RSIMS
Note: *** NOTES ADDED BY RSIMS 3/16/2026 2:43:29 PM *** 3/16/26: Cancelled in person by Applicant due to epoxy coating still drying at entry along with some work in progress. Items checked and approved > smokes, exterior (except roof and goosenecks, etc., bathrooms, GFCI outlets, range anti-tip.
ROW - FINAL APRON (AFTER POUR) 03/16/2026 APPROVED FSLADISH
Note: 3/16/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/16/2026 APPROVED FSLADISH
ROW FIELD SURVEY /GRADING CERTIFICATION 03/16/2026 APPROVED FSLADISH
Note: 3/16/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ELECTRIC - EARLY POWER 02/12/2026 APPROVED - AS NOTED BTAYLOR
Note: 2-12-26 1. Emailed FPL at 12:08. Inspector Notes from Inspection 2200 1-6-26 1. Emailed FPL at 12:39.
ROW- PRE-APRON (PRE-POUR) 02/02/2026 APPROVED FSLADISH
Note: 2/2/26 PIPE INVERT IS GOOD AT THIS INSPECTION. BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE AT THE TIME OF THE INSPECTION READY TO POUR,IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER. ALSO VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
DRYWALL NAILING 01/20/2026 CANCELLED BY APPLICANT WEB
DRYWALL NAILING 01/20/2026 APPROVED BTAYLOR
INSULATION 01/15/2026 APPROVED KSANDOE
Note: Inspector Notes from Inspection 2420 Rear slider has not been installed UG for kitchen island has not been run
LATH/BRICK/ WATER BARRIER 01/13/2026 APPROVED KSANDOE
ALL ROUGH 01/13/2026 APPROVED - AS NOTED KSANDOE
Note: Rear slider has not been installed UG for kitchen island has not been run
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/08/2026 APPROVED BTAYLOR
Note: 1/6/2026 - PREVIOUS INSPECTION NOTES
ROOF VALLEY & METAL 01/06/2026 APPROVED BTAYLOR
WALL SHEATHING 01/06/2026 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/06/2026 CANCELLED BY APPLICANT BTAYLOR
ELECTRIC-TUG 01/06/2026 APPROVED - AS NOTED BTAYLOR
Note: 1-6-26 1. Emailed FPL at 12:39.
WALL SHEATHING 01/05/2026 CANCELLED BY INSPECTOR BTAYLOR
Note: 1-6-26 1. This is a duplicate inspection.
ELECTRIC-TUG 01/05/2026 CANCELLED BY INSPECTOR BTAYLOR
Note: 1-6-26 1. This is a duplicate inspection.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/05/2026 CANCELLED BY INSPECTOR BTAYLOR
Note: 1-6-26 1. This is a duplicate inspection.
ROOF VALLEY & METAL 01/05/2026 CANCELLED BY INSPECTOR BTAYLOR
Note: 1-6-26 1. This is a duplicate inspection.
MONOLITHIC SLAB 12/22/2025 APPROVED BTAYLOR
WATER METER INSTALLATION REQUEST 12/22/2025 APPROVED BVITALE
PLUMBING 1ST ROUGH UNDERGROUND 12/17/2025 APPROVED BTAYLOR
GRAVITY SEWER TEST 12/17/2025 APPROVED BTAYLOR
SEWER TIE IN 12/17/2025 APPROVED BTAYLOR
FORMBOARD SURVEY (OFFICE USE ONLY) 12/16/2025 APPROVED RRICKS

Review History

Department Status Date In Date Out
BADMIN INFORMATION 03/04/2026 03/04/2026
Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Inspection report for incorrect address.
SW1 COMPLETE 12/16/2025 12/16/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 12/16/2025 12/16/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SW1 COMPLETE 12/08/2025 12/11/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Approved as noted. - Grading plan from 11/10 will be used. - After conversations we've agreed to accept foundation plans.
BLD COMPLETE 12/08/2025 12/09/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 12/05/2025 12/05/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD HOLD 12/01/2025 12/05/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. Still need the letter from PE for foundation reinforcement. 2. Need plan sheet FC-1b to have the metal tie plate and corner framing details.
SW1 HOLD 12/01/2025 12/03/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM The "Footing Detail at low grade" shall have a detail referencing the foundation plan. Please call to mitigate any further delays if there are any questions or confusion.
SW1 HOLD 11/19/2025 11/26/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Grading Plan Comments: - After conversations with Patrick the building official. We will accept a structural plan with a min AND max range that agrees with the grading plan. Please structural plans as needed. There shall be no slopes greater than 25% (4/1). Please feel free to call or email if there are any questions.
BLD HOLD 11/19/2025 11/20/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Detail does not correspond to the foundation plan
SW1 COMPLETE 11/18/2025 11/18/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Approved as noted: I've spoke with Eric the project manager and he confirmed that the footers will be thickened to allow for the grade drop adjacent to foundation where needed.
BLD HOLD 11/18/2025 11/18/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Plan sheet needs to be digitally signed, sealed, and verifiable.
ZON COMPLETE 11/18/2025 11/18/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
SW1 HOLD 11/18/2025 11/18/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM After further review the structural drawing are not signed and sealed by an engineer.
BLD COMPLETE 11/10/2025 11/17/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 11/10/2025 11/18/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 11/10/2025 11/17/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/10/2025 11/12/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 11/10/2025 11/12/2025
LOCATE COMPLETE 11/10/2025 11/12/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 11/10/2025 11/12/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 11/10/2025 11/13/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM General Comments: Based on the proposed elevations adjacent to the foundation, several areas show grade drops exceeding the 6" minimum shown on the structural foundation plans. To avoid the slab being poured at the minimum and resulting in slopes steeper than 4:1, please revise or add a foundation detail consistent with the proposed grade drops adjacent to the foundation.
ZON COMPLETE 11/10/2025 11/12/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
URB COMPLETE 11/10/2025 11/14/2025
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
WATER-METER ¤874.47 12/11/2025
WATER- TURN ON ¤50.00 12/11/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 12/11/2025
INSPECTION - RESIDENTIAL ¤968.00 12/11/2025
PLAN REVIEW - RESIDENTIAL ¤274.56 12/11/2025
FC IMPACT FEE EMS ¤62.00 12/11/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 12/11/2025
FC IMPACT FEE LIBRARY ¤268.00 12/11/2025
FIRE RES IMPACT FEE 10-25 ¤942.00 12/11/2025
WATER METER W/OUT TAP ¤965.03 12/11/2025
PARKS IMPACT FEE 10-25 ¤3,164.00 12/11/2025
RECLAIM WATER PERMIT INSPECTIO ¤40.00 12/11/2025
RSI DRIVEWAY AFTER POUR ¤16.25 12/11/2025
RSE DRIVE PRE POUR INSPECTION ¤32.50 12/11/2025
RSI FIELD SURVEY INSPECTION ¤48.75 12/11/2025
RSI FORMBOARD REVIEW ¤16.25 12/11/2025
RSI PLAN REVIEW NEW ¤48.75 12/11/2025
RSI FNL SURVEY/GRADING CERT ¤48.75 12/11/2025
RSI ROW FINAL INSPECTION ¤16.25 12/11/2025
SURCHARGE FS 533.721 ¤12.73 12/11/2025
SURCHARGE - FS 468.631 ¤19.09 12/11/2025
TRANSP RES IMPACT FEE 10-25 ¤6,842.55 12/11/2025
TRANSP RES IMPACT FEE 10-25 (¤6,842.55) 12/11/2025
WASTEWATER PERM INSPECTION ¤80.00 12/11/2025
WASTEWATER PERM REVIEW ¤25.00 12/11/2025
SEWER CAPITAL FACILITY ¤2,368.69 12/11/2025
WATER CAPITAL FACILITY FEE ¤1,744.18 12/11/2025
WATER PERMIT REVIEW ¤25.00 12/11/2025
SITE PLAN 30 ¤30.00 12/11/2025
Fees Total Due: ¤0.00 Total Paid: ¤12,388.25