I want to search for...
Permit #2025110378
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7027-00480-0050 |
| Block: 00480 |
| Subdivision: 7027 - |
| Job Phone: 904-382-8852 |
| Location Address: 32 WOOD CEDAR DR |
| Type: PO - POOL |
| Issue Date: 11/19/2025 |
| NOC: RECORDED |
| Applicant name: SCOTT F GRIFFITHS |
| Owner: JACKSON KEITH & RONDAI H&W |
|
Address 915 OCEANSHORE BLVD ORMOND BEACH, FL 32176 |
|
Address UNIT 601 ORMOND BEACH, FL 32176 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤81,000.00 |
| Job Description: Pool w/ Screen |
| Type: CN |
Contractor
PINCH A PENNY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
7 OLD KINGS ROAD PALM COAST, FL 32164 |
CPC1460307 (Exp: 08/31/2026) | 904-382-8852 |
Sub Contractors
CHRISTOPHER I HALL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
60 COOPER LANE PALM COAST, FL 32137 |
EC13008029 (Exp: 08/31/2028) | 386-225-1937 |
JOSEPH DEREK CARTWRIGHT
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
151 RODEO ROAD ORMOND BEACH, FL 32174 |
SCC131150000 (Exp: 08/31/2026) | 386-310-7962 | (386)615-3713 |
Inspection History
| Type | Request Date | Result | Inspector |
| POOL FINAL | 03/31/2026 | FINAL APPROVED | HCAMACHO |
| U -UTILITY RESIDENTIAL FINAL | 03/30/2026 | FINAL APPROVED | BWRIGHT |
| ROW - FINAL INSPECTION | 03/26/2026 | APPROVED | EMADISON |
| Note: ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/26/2026 | APPROVED | EMADISON |
| Note: ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/13/2026 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 03-13-26 TPOLACEK*** SWALE WAS LOWERED HOWEVER ALL DIRT THROWN IN SWALE ACROSS VACANT LOT MUST BE REMOVED AND HOLE AT PROPERTY LINE FILLED. THE AREA IN THE REAR MENTIONED IN LAST INSPECTION HAS NOT BEEN ADDRESSED. THE BARE AREAS IN VACANT MUST BE SEEDED TO MEET STANDARDS 3/10/2026 - PREVIOUS INSPECTION NOTES 3-10-26 TPOLACEK*** APPROVING THE FINAL SURVEY WITH NOTES. ALL DEFICIENCIES MUST BE CORRECTED BEFORE FIELD SURVEY WILL BE APPROVED. SWALE IN FRONT WHERE CONTRACTOR MADE ENTRANCE MUST BE CUT DOWN TO MATCH GRADE ON BOTH SIDE TO PREVENT STANDING WATER IN SWALE. LEFT SIDE OF POOL PATIO BETWEEN THE STOOP AND THE CRAPE MYRTLE NEEDS TO BE RAISED UP TO GUIDE THE DRAINAGE TO THE PROPERTY LINE SWALE . AREA IS TOO LOW AND IS HOLDING WATER. ON THE RIGHT SIDE PROPERTY LINE ALL BARE GROUND MUST BE COVERED WITH SEED AND STRAW TO PREVENT EROSION. 33 All damage in the ROW, including landscaping, must be completely replaced within a reasonable time. LDC Sec.42-52c LDC Sec.42-52c - Where any work disturbs the area outside the roadway, the permittee shall insure that the area is completely restored to a like or better condition than that which existed prior to construction or, in a manner acceptable to the City. Sod that is removed shall be replaced with sod of the same type. Areas not sodded shall be graded and then seeded and mulched or sodded if required by the City Engineer. The permittee is responsible for establishing a dense stand of permanent-type grass within a reasonable time. Shrubbery that is removed or destroyed shall be replaced with plants of equal types and sizes. Sodding and grassing and mulching operations are to begin immediately after construction/installation has been completed. All landscape items damaged or disturbed during construction shall be replaced by the permittee at its expense, as directed by the City. Any plantings on private property damaged or disturbed by the permittee shall be replaced to the satisfaction of the City and property owner unless otherwise directed by the City Engineer. All debris shall be removed by the permittee at its expense. Inspector Notes from Inspection 9463 03-10-26 TPOLACEK*** APPROVING THE FINAL SURVEY WITH NOTES. SWALE IN FRONT WHERE CONTRACTOR MADE ENTRANCE MUST BE CUT DOWN TO MATCH GRADE ON BOTH SIDE TO PREVENT STANDING WATER IN SWALE. LEFT SIDE OF POOL PATIO BETWEEN THE STOOP AND THE CRAPE MYRTLE NEEDS TO BE RAISED UP TO GUIDE THE DRAINAGE TO THE PROPERTY LINE SWALE . AREA IS TOO LOW AND IS HOLDING WATER. ON THE RIGHT SIDE PROPERTY LINE ALL BARE GROUND MUST BE COVERED WITH SEED AND STRAW TO PREVENT EROSION. 33 All damage in the ROW, including landscaping, must be completely replaced within a reasonable time. LDC Sec.42-52c LDC Sec.42-52c - Where any work disturbs the area outside the roadway, the permittee shall insure that the area is completely restored to a like or better condition than that which existed prior to construction or, in a manner acceptable to the City. Sod that is removed shall be replaced with sod of the same type. Areas not sodded shall be graded and then seeded and mulched or sodded if required by the City Engineer. The permittee is responsible for establishing a dense stand of permanent-type grass within a reasonable time. Shrubbery that is removed or destroyed shall be replaced with plants of equal types and sizes. Sodding and grassing and mulching operations are to begin immediately after construction/installation has been completed. All landscape items damaged or disturbed during construction shall be replaced by the permittee at its expense, as directed by the City. Any plantings on private property damaged or disturbed by the permittee shall be replaced to the satisfaction of the City and property owner unless otherwise directed by the City Engineer. All debris shall be removed by the permittee at its expense. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/10/2026 | APPROVED - AS NOTED | TPOLACEK |
| Note: 03-10-26 TPOLACEK*** APPROVING THE FINAL SURVEY WITH NOTES. SWALE IN FRONT WHERE CONTRACTOR MADE ENTRANCE MUST BE CUT DOWN TO MATCH GRADE ON BOTH SIDE TO PREVENT STANDING WATER IN SWALE. LEFT SIDE OF POOL PATIO BETWEEN THE STOOP AND THE CRAPE MYRTLE NEEDS TO BE RAISED UP TO GUIDE THE DRAINAGE TO THE PROPERTY LINE SWALE . AREA IS TOO LOW AND IS HOLDING WATER. ON THE RIGHT SIDE PROPERTY LINE ALL BARE GROUND MUST BE COVERED WITH SEED AND STRAW TO PREVENT EROSION. 33 All damage in the ROW, including landscaping, must be completely replaced within a reasonable time. LDC Sec.42-52c LDC Sec.42-52c - Where any work disturbs the area outside the roadway, the permittee shall insure that the area is completely restored to a like or better condition than that which existed prior to construction or, in a manner acceptable to the City. Sod that is removed shall be replaced with sod of the same type. Areas not sodded shall be graded and then seeded and mulched or sodded if required by the City Engineer. The permittee is responsible for establishing a dense stand of permanent-type grass within a reasonable time. Shrubbery that is removed or destroyed shall be replaced with plants of equal types and sizes. Sodding and grassing and mulching operations are to begin immediately after construction/installation has been completed. All landscape items damaged or disturbed during construction shall be replaced by the permittee at its expense, as directed by the City. Any plantings on private property damaged or disturbed by the permittee shall be replaced to the satisfaction of the City and property owner unless otherwise directed by the City Engineer. All debris shall be removed by the permittee at its expense. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/10/2026 | Disapproved - NO FEE | TPOLACEK |
| Note: 3-10-26 TPOLACEK*** APPROVING THE FINAL SURVEY WITH NOTES. ALL DEFICIENCIES MUST BE CORRECTED BEFORE FIELD SURVEY WILL BE APPROVED. SWALE IN FRONT WHERE CONTRACTOR MADE ENTRANCE MUST BE CUT DOWN TO MATCH GRADE ON BOTH SIDE TO PREVENT STANDING WATER IN SWALE. LEFT SIDE OF POOL PATIO BETWEEN THE STOOP AND THE CRAPE MYRTLE NEEDS TO BE RAISED UP TO GUIDE THE DRAINAGE TO THE PROPERTY LINE SWALE . AREA IS TOO LOW AND IS HOLDING WATER. ON THE RIGHT SIDE PROPERTY LINE ALL BARE GROUND MUST BE COVERED WITH SEED AND STRAW TO PREVENT EROSION. 33 All damage in the ROW, including landscaping, must be completely replaced within a reasonable time. LDC Sec.42-52c LDC Sec.42-52c - Where any work disturbs the area outside the roadway, the permittee shall insure that the area is completely restored to a like or better condition than that which existed prior to construction or, in a manner acceptable to the City. Sod that is removed shall be replaced with sod of the same type. Areas not sodded shall be graded and then seeded and mulched or sodded if required by the City Engineer. The permittee is responsible for establishing a dense stand of permanent-type grass within a reasonable time. Shrubbery that is removed or destroyed shall be replaced with plants of equal types and sizes. Sodding and grassing and mulching operations are to begin immediately after construction/installation has been completed. All landscape items damaged or disturbed during construction shall be replaced by the permittee at its expense, as directed by the City. Any plantings on private property damaged or disturbed by the permittee shall be replaced to the satisfaction of the City and property owner unless otherwise directed by the City Engineer. All debris shall be removed by the permittee at its expense. Inspector Notes from Inspection 9463 03-10-26 TPOLACEK*** APPROVING THE FINAL SURVEY WITH NOTES. SWALE IN FRONT WHERE CONTRACTOR MADE ENTRANCE MUST BE CUT DOWN TO MATCH GRADE ON BOTH SIDE TO PREVENT STANDING WATER IN SWALE. LEFT SIDE OF POOL PATIO BETWEEN THE STOOP AND THE CRAPE MYRTLE NEEDS TO BE RAISED UP TO GUIDE THE DRAINAGE TO THE PROPERTY LINE SWALE . AREA IS TOO LOW AND IS HOLDING WATER. ON THE RIGHT SIDE PROPERTY LINE ALL BARE GROUND MUST BE COVERED WITH SEED AND STRAW TO PREVENT EROSION. 33 All damage in the ROW, including landscaping, must be completely replaced within a reasonable time. LDC Sec.42-52c LDC Sec.42-52c - Where any work disturbs the area outside the roadway, the permittee shall insure that the area is completely restored to a like or better condition than that which existed prior to construction or, in a manner acceptable to the City. Sod that is removed shall be replaced with sod of the same type. Areas not sodded shall be graded and then seeded and mulched or sodded if required by the City Engineer. The permittee is responsible for establishing a dense stand of permanent-type grass within a reasonable time. Shrubbery that is removed or destroyed shall be replaced with plants of equal types and sizes. Sodding and grassing and mulching operations are to begin immediately after construction/installation has been completed. All landscape items damaged or disturbed during construction shall be replaced by the permittee at its expense, as directed by the City. Any plantings on private property damaged or disturbed by the permittee shall be replaced to the satisfaction of the City and property owner unless otherwise directed by the City Engineer. All debris shall be removed by the permittee at its expense. | |||
| ELECTRIC AND ALARM | 02/06/2026 | APPROVED - AS NOTED | MKRASKI |
| Note: 1. Label all breakers in pool panel properly by final inspection | |||
| POOL DECK | 01/09/2026 | APPROVED | MKRASKI |
| ROW - DRAINAGE | 12/22/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 12/17/2025 - PREVIOUS INSPECTION NOTES 12-17-25 TPOLACEK*** POOL BUILDER MUST REMOVE ALL DELETERIOUS FROM ROW. INSTALL A 10' TEMPORARY PIPE SO SWALE WILL FUNCTION AS DESIGNED KEEP SWALW OPEN THROUGHOUT BUILD BUILDER MUST MAKE SURE AT END OF BUILD CULVERT PIPE IS CLEARED OF ALL SEDIMENT PUMPED FROM BACK YARD INTO GFRONT SWALE 5 DAYS TO CORRECT | |||
| ROW - DRAINAGE | 12/17/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: 12-17-25 TPOLACEK*** POOL BUILDER MUST REMOVE ALL DELETERIOUS FROM ROW. INSTALL A 10' TEMPORARY PIPE SO SWALE WILL FUNCTION AS DESIGNED KEEP SWALW OPEN THROUGHOUT BUILD BUILDER MUST MAKE SURE AT END OF BUILD CULVERT PIPE IS CLEARED OF ALL SEDIMENT PUMPED FROM BACK YARD INTO GFRONT SWALE 5 DAYS TO CORRECT | |||
| STEEL AND GROUND | 12/15/2025 | APPROVED | MKRASKI |
Review History
| Department | Status | Date In | Date Out |
| BFLOOD | CANCEL | 11/12/2025 | 11/13/2025 |
| BLD | COMPLETE | 11/12/2025 | 11/18/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 11/12/2025 | 11/17/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/12/2025 | 11/13/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| RSI | COMPLETE | 11/12/2025 | 11/14/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/12/2025 | 11/12/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM please label pool equiptment pads on the pool plans. Its showing on site plan but not labeled on pool plan |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| RSI REINSPECTION 1 | ¤35.00 | 03/25/2026 |
| RSI REINSPECTION 1 | ¤35.00 | 03/10/2026 |
| RSI REINSPECTION 1 | ¤35.00 | 03/10/2026 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 11/19/2025 |
| SURCHARGE FS 533.721 | ¤2.55 | 11/19/2025 |
| SURCHARGE - FS 468.631 | ¤3.83 | 11/19/2025 |
| SITE PLAN 30 | ¤30.00 | 11/19/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/19/2025 |
| INSPECTION- POOL | ¤160.00 | 11/19/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤65.00 | 11/19/2025 |
| RSI FIELD SURVEY INSPECTION | ¤48.75 | 11/19/2025 |
| RSI PLAN REVIEW NEW | ¤48.75 | 11/19/2025 |
| RSI FNL SURVEY/GRADING CERT | ¤48.75 | 11/19/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤558.88 |