I want to search for...

Permit #2025110396

Permit Details

Status: COED

Parcel Id: 04-11-30-5571-00000-1780
CONDITIONED SPACE: 1707 sqft
GARAGE: 481 sqft
OPENED PORCH (WITH ROOF) : 64 sqft
OPENED PORCH (WITH ROOF) : 220 sqft
Total Square Footage: 2472 sqft
Subdivision: 2366 - SOMERSET SUBDIVISION PH 2
Job Phone: 904-596-6645
Location Address: 102 TEA OLIVE DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/08/2025
NOC: RECORDED
Applicant name: MICHAEL T HOLDER
Owner: KB HOME JACKSONVILLE LLC

Address

10475 FORTUNE PARKWAY

JACKSONVILLE, FL 32256

Address

SUITE 100

JACKSONVILLE, FL 32256

Lot: 178
Contracted Stated Job Value: ¤140,000.00
Job Description: SINGLE FAMILY DWELLING
Type: CN

Contractor

KB HOME JACKSONVILLE, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

10475 FORTUNE PKWY

JACKSONVILLE, FL 32256

SUITE 100

JACKSONVILLE, FL 32256

CGC1509034 (Exp: 08/31/2026) 904-596-6645

Sub Contractors

LARRY WILLIAMS
Status Location Address State License Number Phone
ACTIVE

1750 EMERSON ST

JACKSONVILLE, FL 32207

LI45034 (Exp: 08/31/2026) 904-721-5431
BOBBY WAYNE CAMPBELL
Status Location Address State License Number Phone
ACTIVE

117 GUTHRIE ROAD

GREEN COVE SPRINGS, FL 32043

CCC1326752 (Exp: 08/31/2026) 904-200-1600
JAMES E LINTON
Status Location Address State License Number Phone
ACTIVE

200 COLLEGE DR

ORANGE PARK, FL 32065

EC0001152 (Exp: 08/31/2026) 904-272-0272
COREY MICHAEL TENNANT
Status Location Address State License Number Phone
ACTIVE

3370 AGRICULTURAL CNETER DR

ST AUGUSTINE, FL 32092

CAC1819063 (Exp: 08/31/2026) 904-829-8898
BENJAMIN MICHAEL RAY
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

6310 MABLETON PKWY

JACKSONVILLE, FL 32216

SUITE 1000

MABLETON, GA 30126

CFC1428415 (Exp: 08/31/2026) 904-861-5421 904-861-5426

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 03/26/2026 APPROVED EMADISON
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - FINAL INSPECTION 03/26/2026 APPROVED EMADISON
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
U -UTILITY RESIDENTIAL FINAL 03/26/2026 FINAL APPROVED BWRIGHT
Note: Inspector Notes from Inspection 9035 No CC. IRR with reuse water.
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/25/2026 APPROVED TPOLACEK
Note: BASED ON THE STAMPED AND SIGNED LGDC AND FINAL SURVEY I AM APPROVING THE INSPECTION
BLD - BUILDING FINAL 03/19/2026 FINAL APPROVED JSTEWART
Note: 3/16/2026 - PREVIOUS INSPECTION NOTES 1. Locking caps on outside unit loose. FBCR M1411.8 2. Exterior outlets on rear of house not GFCI protected. NEC 210.8 3. Heat strip on unit marked, but wrong breaker installed.
BLD - BUILDING FINAL 03/16/2026 Disapproved - NO FEE PKNAPIK
Note: 1. Locking caps on outside unit loose. FBCR M1411.8 2. Exterior outlets on rear of house not GFCI protected. NEC 210.8 3. Heat strip on unit marked, but wrong breaker installed.
U-CROSS CONNECTION 03/16/2026 APPROVED - AS NOTED BVEIGA
Note: No CC. IRR with reuse water.
ELECTRIC - EARLY POWER 03/02/2026 APPROVED JSTEWART
Note: Inspector Notes from Inspection 2200 Authorize release of email.
ROW- PRE-APRON (PRE-POUR) 02/10/2026 APPROVED - AS NOTED TPOLACEK
Note: 02-10-26 TPOLACEK*** ON THE RIGHT SIDE THERE IS NOT 6" ALONG FORM BAORDS. SPOKE WITH CM ON SITE AND THEY ARE HAVING THE CREW FIX THE ISSUE WHEN THEY FIX THE BOARD AT #94 APPROVING AS NOTED. AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. . TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, IN THE UPCOMING MONTHS THE DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS WILL BE REQUIRED TO BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. YOU WILL RECEIVE A NEWS BLAST WHEN THIS BECOMES NECESSARY
DRYWALL NAILING 02/03/2026 APPROVED JSTEWART
Note: 2/2/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2490 Previous Notes not rectified...... 5. Please secure switch holding box to stud for pantry Light. NEC 314.23(B) 7. Underground romex for Island needs to be ran thru conduit, and secured. Per plan Electricians onsite for above. Will Check At drywall Nailing, will need completed to Move forward..
DRYWALL NAILING 02/02/2026 CANCELLED BY APPLICANT JSTEWART
Note: Inspector Notes from Inspection 2490 Previous Notes not rectified...... 5. Please secure switch holding box to stud for pantry Light. NEC 314.23(B) 7. Underground romex for Island needs to be ran thru conduit, and secured. Per plan Electricians onsite for above. Will Check At drywall Nailing, will need completed to Move forward..
INSULATION 01/30/2026 APPROVED - AS NOTED JSTEWART
Note: Previous Notes not rectified...... 5. Please secure switch holding box to stud for pantry Light. NEC 314.23(B) 7. Underground romex for Island needs to be ran thru conduit, and secured. Per plan Electricians onsite for above. Will Check At drywall Nailing, will need completed to Move forward..
LATH/BRICK/ WATER BARRIER 01/29/2026 APPROVED JSTEWART
Note: 1/28/2026 - PREVIOUS INSPECTION NOTES Front window X2, and right side window missing screws in top Fin, and needs flashing installed.
LATH/BRICK/ WATER BARRIER 01/28/2026 Disapproved - NO FEE JSTEWART
Note: Front window X2, and right side window missing screws in top Fin, and needs flashing installed.
ALL ROUGH 01/28/2026 APPROVED - AS NOTED JSTEWART
Note: Previous Notes not rectified.....Will check at Insulation 5. Please secure switch holding box to stud for pantry Light. NEC 314.23(B) 7. Underground romex for Island needs to be ran thru conduit, and secured. Per plan 1/26/2026 - PREVIOUS INSPECTION NOTES 1. Hood exhaust duct is reversed, Seams need to lap in the flow of exhaust. M1601.4.2 2. No water preassure, (Preassure gauge is broken replace it). FBCR P2503.5 3. No 5ft head test. FBCR P2503.7 4. Romex needs to terminate into the holding boxes min 1/4". (Check all locations, to many to list) NEC 314.17(C) 5. Please secure switch holding box to stud for pantry Light. NEC 314.23(B) 6. Please secure (fasten) loose studs in master bedroom at TV location. X(2). 7. Underground romex for Island needs to be ran thru conduit, and secured. Per plan
ALL ROUGH 01/26/2026 Disapproved - NO FEE JSTEWART
Note: 1. Hood exhaust duct is reversed, Seams need to lap in the flow of exhaust. M1601.4.2 2. No water preassure, (Preassure gauge is broken replace it). FBCR P2503.5 3. No 5ft head test. FBCR P2503.7 4. Romex needs to terminate into the holding boxes min 1/4". (Check all locations, to many to list) NEC 314.17(C) 5. Please secure switch holding box to stud for pantry Light. NEC 314.23(B) 6. Please secure (fasten) loose studs in master bedroom at TV location. X(2). 7. Underground romex for Island needs to be ran thru conduit, and secured. Per plan
ELECTRIC-TUG 01/26/2026 APPROVED - AS NOTED JSTEWART
Note: Authorize release of email.
WALL SHEATHING 01/22/2026 APPROVED JSTEWART
Note: 1/21/2026 - PREVIOUS INSPECTION NOTES Missing nails at seem on right side by hose bibb 3' section.
ROOF VALLEY & METAL 01/22/2026 APPROVED JSTEWART
Note: 1/21/2026 - PREVIOUS INSPECTION NOTES
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/21/2026 APPROVED - AS NOTED JSTEWART
Note: 1. Please Nail bottom chord of truss to 2x brace on top of interior shear wall 4" OC per PG. SD3 detail (GG). 2. Please add stud to structural exterior front wall in corner of closet and entry wall, where stud was cut out to install DTT2Z.
ROOF VALLEY & METAL 01/21/2026 CANCELLED BY APPLICANT JSTEWART
WALL SHEATHING 01/21/2026 Disapproved - NO FEE JSTEWART
Note: Missing nails at seem on right side by hose bibb 3' section.
GRAVITY SEWER TEST 01/20/2026 APPROVED JSTEWART
Note: Live virtual
SEWER TIE IN 01/20/2026 APPROVED JSTEWART
Note: Live virtual
MONOLITHIC SLAB 01/06/2026 APPROVED JSTEWART
PLUMBING 1ST ROUGH UNDERGROUND 12/30/2025 APPROVED JSTEWART
FORMBOARD SURVEY (OFFICE USE ONLY) 12/29/2025 APPROVED RRICKS
WATER METER INSTALLATION REQUEST 12/18/2025 APPROVED ISANDERSON

Review History

Department Status Date In Date Out
SW1 COMPLETE 12/29/2025 12/29/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 12/29/2025 12/29/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON COMPLETE 11/25/2025 11/25/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 11/25/2025 12/03/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 11/12/2025 11/17/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 11/12/2025 11/18/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 11/12/2025 11/17/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/12/2025 11/13/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS COMPLETE 11/12/2025 11/13/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
LOCATE COMPLETE 11/12/2025 11/18/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 11/12/2025 11/13/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 11/12/2025 11/19/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON HOLD 11/12/2025 11/14/2025
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Floor plan A-1 missing
URB COMPLETE 11/12/2025 11/17/2025
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
WATER-METER ¤874.47 12/08/2025
WATER- TURN ON ¤50.00 12/08/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 12/08/2025
INSPECTION - RESIDENTIAL ¤948.75 12/08/2025
PLAN REVIEW - RESIDENTIAL ¤269.10 12/08/2025
FC IMPACT FEE EMS ¤62.00 12/08/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 12/08/2025
FC IMPACT FEE LIBRARY ¤268.00 12/08/2025
FIRE RES IMPACT FEE 10-25 ¤942.00 12/08/2025
WATER METER W/OUT TAP ¤965.03 12/08/2025
PARKS IMPACT FEE 10-25 ¤3,164.00 12/08/2025
RECLAIM WATER PERMIT INSPECTIO ¤40.00 12/08/2025
RSI DRIVEWAY AFTER POUR ¤16.25 12/08/2025
RSE DRIVE PRE POUR INSPECTION ¤32.50 12/08/2025
RSI FIELD SURVEY INSPECTION ¤48.75 12/08/2025
RSI FORMBOARD REVIEW ¤16.25 12/08/2025
RSI PLAN REVIEW NEW ¤48.75 12/08/2025
RSI FNL SURVEY/GRADING CERT ¤48.75 12/08/2025
RSI ROW FINAL INSPECTION ¤16.25 12/08/2025
SCHOOL BOARD IMPACT FEE RES ¤5,450.00 12/08/2025
SURCHARGE FS 533.721 ¤12.48 12/08/2025
SURCHARGE - FS 468.631 ¤18.72 12/08/2025
TRANSP RES IMPACT FEE 10-25 ¤6,435.39 12/08/2025
WASTEWATER PERM INSPECTION ¤80.00 12/08/2025
WASTEWATER PERM REVIEW ¤25.00 12/08/2025
SEWER CAPITAL FACILITY ¤3,628.86 12/08/2025
WATER CAPITAL FACILITY FEE ¤3,091.14 12/08/2025
WATER PERMIT REVIEW ¤25.00 12/08/2025
SITE PLAN 30 ¤30.00 12/08/2025
Fees Total Due: ¤0.00 Total Paid: ¤26,855.44