Permit #2025110675
Permit Details
Status: INSPECT
| Parcel Id: 23-11-30-6060-00000-00B0 |
| Subdivision: - |
| Job Phone: 386-547-6093 |
| Location Address: 400 WISTERIA HILL DR |
| Type: CSD - COMMERCIAL SITE DEVELOPMENT |
| Issue Date: 12/08/2025 |
| NOC: Unknown |
| Applicant name: JOSEPH D WEBER |
| Owner: CITY OF PALM COAST FLORIDA |
|
Address 160 LAKE AVENUE PALM COAST, FL 32164 |
| Job Description: BLUE HERON DISC GOLF SITE WORK |
| Type: CN |
Contractor
JD WEBER CONSTRUCTION CO.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
150 BUSINESS CENTER DRIVE ORMOND BEACH, FL 32174 |
CUC1224075 (Exp: 08/31/2026) | (386)671-2727 | (386)671-2471 |
Inspection History
| Type | Request Date | Result | Inspector |
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 06/10/2026 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 6/8/2026 - PREVIOUS INSPECTION NOTES now placing 18in ADS pipe in existing ditch-Arrow site installing drainage-reinforced to foreman Alvaro to remove any wet organic soils and rebed with good clean fill as it looks like he's already been doing on initial pipe placements 18INCH ADS FOR 4-60FT SECTIONS ALONG EXISTING DITCH NOW INSTALLED ALONG WITH 19IN ADS CULVERT IN FRONT OF RAW WATER WELL | |||
| UC-CONSTRUCTION ENTRANCE | 06/08/2026 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 4/29/2026 - PREVIOUS INSPECTION NOTES still nothing installed but with no traffic entering/leaving-don't really need now -will monitor loads of fill now being brought on site-still no offficial cstr entrance wiyh no soils getting in asphalt roadway-sent mesage to Chad to monitor and act appropriately | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 06/08/2026 | PARTIALLY APPROVED | LFITZGERALD |
| Note: now placing 18in ADS pipe in existing ditch-Arrow site installing drainage-reinforced to foreman Alvaro to remove any wet organic soils and rebed with good clean fill as it looks like he's already been doing on initial pipe placements | |||
| UC-CONSTRUCTION ENTRANCE | 04/29/2026 | PARTIALLY APPROVED | LFITZGERALD |
| Note: still nothing installed but with no traffic entering/leaving-don't really need now -will monitor | |||
| UC - PROJECT STATUS | 04/29/2026 | PARTIALLY APPROVED | LFITZGERALD |
| Note: SO currently nothing more than concrete tee slabs poured-what was bush hogged is now all back,mulch that city delivered is still in 4 big piles near proposed parking9city was to instal mulch along all fairways as being handled by Richard P-city landscaper-retaining wall still with open cellls with poured gravel flowing out? Carmello made aware today | |||
| ROW- PROJECT STATUS | 03/20/2026 | CANCELLED BY INSPECTOR | TPOLACEK |
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | 02/19/2026 | PARTIALLY APPROVED | LFITZGERALD |
| Note: placing concrete for TEE at each hole | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 02/04/2026 | PARTIALLY APPROVED | JMYERS |
| Note: 2/4/26 SILT FENCE NOT INSTALLED YET. | |||
| PLAN - PRE-CON 386-986-3750 | 01/06/2026 | APPROVED - AS NOTED | LFITZGERALD |
| Note: on site on Monday-1/5/26 with Jordan Tom AND Frank along with develpoer-Drew=reviewd scope of work etc | |||
| PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY | |||
| LANDSCAPE PRE-CONSTRUCTION MEETING | |||
| LDSC-TREE BARRICADE | |||
| IRRIGATION AFFIDAVIT | |||
| LDSC-IRRIGATION FINAL | |||
| LDSC- LANDSCAPE / IRRIGATION AS-BUILT | |||
| LDSC- LANDSCAPE FINAL | |||
| U-WATER SERVICE INSTALLATION | |||
| U-GRAVITY SEWER INSTALL/TESTING | |||
| U-CROSS CONNECTION | |||
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | |||
| BLD- ADA PARKING | |||
| BLD- ADA SIGNAGECONTROL | |||
| BLD - UNDERGROUND SITE LIGHTING CONDUITS | |||
| BLD - SITE LIGHTING-PLACEMENT/FOUNDATION | |||
| BLD - SITE LIGHTING-POLE SET/FIXTURE | |||
| MAINT BOND ACCEPTANCE (OFFICE) | |||
| CLOSE OUT DOCUMENTS | |||
| UC - PROJECT STATUS | |||
| Note: 4/29/2026 - PREVIOUS INSPECTION NOTES SO currently nothing more than concrete tee slabs poured-what was bush hogged is now all back,mulch that city delivered is still in 4 big piles near proposed parking9city was to instal mulch along all fairways as being handled by Richard P-city landscaper-retaining wall still with open cellls with poured gravel flowing out? Carmello made aware today | |||
| UC-CONSTRUCTION ENTRANCE | |||
| Note: 6/8/2026 - PREVIOUS INSPECTION NOTES 4/29/2026 - PREVIOUS INSPECTION NOTES still nothing installed but with no traffic entering/leaving-don't really need now -will monitor loads of fill now being brought on site-still no offficial cstr entrance wiyh no soils getting in asphalt roadway-sent mesage to Chad to monitor and act appropriately | |||
| UC-MOT MAINTENANCE OF TRAFFIC | |||
| UC-DRAINAGE STRUCT PLACMNT | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | |||
| Note: 6/10/2026 - PREVIOUS INSPECTION NOTES 6/8/2026 - PREVIOUS INSPECTION NOTES now placing 18in ADS pipe in existing ditch-Arrow site installing drainage-reinforced to foreman Alvaro to remove any wet organic soils and rebed with good clean fill as it looks like he's already been doing on initial pipe placements 18INCH ADS FOR 4-60FT SECTIONS ALONG EXISTING DITCH NOW INSTALLED ALONG WITH 19IN ADS CULVERT IN FRONT OF RAW WATER WELL | |||
| PROJECT CLOSE OUT MEETING (386-986-3750) | |||
| UC-SUBSTANTIAL WALK-THRU | |||
| UC- PRELIMINARY AS-BUILTS | |||
| UC-FINAL SITE INSPECTION | |||
| UC-FINAL SITE STABILIZATION | |||
| U - UTILITY COMMERCIAL FINAL | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | |||
| Note: 2/5/2026 - PREVIOUS INSPECTION NOTES 2/4/26 SILT FENCE NOT INSTALLED YET. | |||
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | |||
| Note: 2/19/2026 - PREVIOUS INSPECTION NOTES placing concrete for TEE at each hole | |||
| UROW- CURBING & GUTTER | |||
| U-ROW FINAL | |||
| U - SEWER TIE IN | |||
| UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 11/19/2025 | 11/19/2025 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 11/19/2025 | 11/20/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| PLENG | COMPLETE | 11/19/2025 | 11/19/2025 |
| Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM | |||
| PLLA | COMPLETE | 11/19/2025 | 11/19/2025 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| UD1 | COMPLETE | 11/19/2025 | 11/20/2025 |
| Note: Released By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMINISTRATIVE- SITE DEVELOP | ¤125.00 | 12/08/2025 |
| INSPECTION - GENERAL | ¤240.00 | 12/08/2025 |
| SITE DEVELOPMENT ADMIN PLANNIN | ¤179.00 | 12/08/2025 |
| SITE INSPECTION | ¤798.00 | 12/08/2025 |
| SITE PLAN 29 | ¤29.00 | 12/08/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤1,371.00 |