I want to search for...

Permit #2025110708

Permit Details

Status: INSPECT

Parcel Id: 07-11-31-7026-00570-0060
OPENED PORCH (WITH ROOF) : 390 sqft
GARAGE: 414 sqft
CONDITIONED SPACE: 1742 sqft
Total Square Footage: 2546 sqft
Block: 00570
Subdivision: 7026 -
Job Phone: 352-433-8382
Location Address: 169 PINE GROVE DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/11/2025
NOC: RECORDED
Applicant name: ALFREDO E SCHEER
Owner: ESTELA LIVING LLC

Address

2601 S BAYSHORE DR

COCONUT GROVE, FL 33133

Address

18TH FLOOR

COCONUT GROVE, FL 33133

Lot: 0060
Contracted Stated Job Value: ¤165,000.00
Job Description: Single Family
Type: CN

Contractor

ESTELA LIVING LLC
Status Location Address State License Number Phone
ACTIVE

237 S. DIXIE HWY, 4TH FLOOR

CORAL GABLES, FL 33133

CGC1534535 (Exp: 08/31/2026) 352-433-8382

Sub Contractors

JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
JOSEPH H STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PKWY

SANFORD, FL 32771

CAC043953 (Exp: 08/31/2026) 877-906-1113

Inspection History

Type Request Date Result Inspector
ROW- PRE-APRON (PRE-POUR) 06/10/2026 APPROVED FSLADISH
Note: 6/10/26 WITH RAIN IN THE FORECAST IT IS THE BUILDERS RESPONSIBILITY TO ENSURE THAT ALL WATER IS OUT OF POUR AREA, IT IS PROPERLY COMPACTED AND THE PIPE ELEVATION HAS NOT CHANGED SINCE THIS INSPECTION. PIPE INVERT IS GOOD AT TIME OF THIS INSPECTION. BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED. DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER AND VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR.
ELECTRIC - EARLY POWER 05/22/2026 APPROVED RMARTIN
GRAVITY SEWER TEST 05/14/2026 APPROVED KSANDOE
Note: 5/13/2026 - PREVIOUS INSPECTION NOTES sewer connection from house to public (runs and fittings) are covered will need to be exposed for inspection, also noted for sewer tie in.
SEWER TIE IN 05/14/2026 APPROVED KSANDOE
Note: 5/13/2026 - PREVIOUS INSPECTION NOTES All connections fittings and runs are covered need to be exposed for inspection. Sewer tie-in connection must be visible for inspection to ensure it is watertight and properly installed before being covered. If the connection is buried or under muddy water, it cannot be deemed compliant or approved. FBC [A]110.6 / FBC P2503.2 Concealment.
SEWER TIE IN 05/13/2026 Disapproved - NO FEE JSTEWART
Note: All connections fittings and runs are covered need to be exposed for inspection. Sewer tie-in connection must be visible for inspection to ensure it is watertight and properly installed before being covered. If the connection is buried or under muddy water, it cannot be deemed compliant or approved. FBC [A]110.6 / FBC P2503.2 Concealment.
GRAVITY SEWER TEST 05/13/2026 Disapproved - NO FEE JSTEWART
Note: sewer connection from house to public (runs and fittings) are covered will need to be exposed for inspection, also noted for sewer tie in.
PEP TANK INSTALLATION REQUEST 04/28/2026 APPROVED ISANDERSON
LATH/BRICK/ WATER BARRIER 04/10/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 4/10/2026 2:22:45 PM *** Approved
DRYWALL NAILING 03/30/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 3/30/2026 8:53:34 AM *** Approved 3/27/2026 - PREVIOUS INSPECTION NOTES 3/27/26: 1). Front left Flex Room (behind garage) > drywall needs to be complete for this inspection. Missing drywall behind plumbing piping. FBC [A]107.4
DRYWALL NAILING 03/27/2026 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 3/27/2026 10:33:57 AM *** 3/27/26: 1). Front left Flex Room (behind garage) > drywall needs to be complete for this inspection. Missing drywall behind plumbing piping. FBC [A]107.4
DRYWALL NAILING 03/26/2026 CANCELLED BY APPLICANT WEB
INSULATION 03/24/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 3/24/2026 1:05:56 PM *** Approved Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 3/17/2026 3:12:43 PM *** 3/17/26: MUST BE COMPLETE BY INSULATION INSPECTION. 1). 5ft head pressure not holding. FBC-P2503.5.1 2). Product Approval revision has only been accepted at the time of this inspection. FBC-[A] 107.4
ALL ROUGH 03/17/2026 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 3/17/2026 3:12:43 PM *** 3/17/26: MUST BE COMPLETE BY INSULATION INSPECTION. 1). 5ft head pressure not holding. FBC-P2503.5.1 2). Product Approval revision has only been accepted at the time of this inspection. FBC-[A] 107.4
ROOF VALLEY & METAL 03/16/2026 APPROVED HCAMACHO
Note: 3/11/2026 - PREVIOUS INSPECTION NOTES 3/11/26: PREVIOUSLY LISTED ITEMS REMAIN UNRESOLVED. 2). Last A1 truss towards the front of the house needs to have dirt coverage removed so we can verify original integrity. Back side of truss on the left side of the house > BACK LEFT SIDE OF TRUSS AT THE BOTTOM CORD ALONG WITH THE WEBS STILL NEED DIRT RMOVED. 3). Detail A on plan page S-5 is not complete as required. FBC [A]107.4 > THE BRACING WAS NOT INSTALLED AND/OR ANCHORED AS REQUIRED IN THE DETAIL ON THE PLAN PAGE. CORRECTION OR REVISION REQUIRED. IF REVISION IS SUBMITTED - THE TIE DOWN USED WILL STILL REQUIRE ANCHORS INTO THE BEAM. 3/5/2026 - PREVIOUS INSPECTION NOTES 3/5/26: Previously listed items 2 and 3 remain unresolved. 2). Last A1 truss towards the front of the house needs to have dirt coverage removed so we can verify original integrity. 3). Detail A on plan page S-5 is not complete as required. FBC [A]107.4 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 2/26/2026 11:42:53 AM *** 2/26/26: Check at next inspection. 1). Please have permit box laying on the ground mounted in an upright position. FBC [A]107.3.1 / FBC [A]107.3.1 2). Last A1 truss towards the front of the house needs to have dirt coverage removed so we can verify original integrity. 3). Detail A on plan page S-5 is not complete as required. FBC [A]107.4
ROOF VALLEY & METAL 03/11/2026 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 3/11/2026 10:01:58 AM *** 3/11/26: PREVIOUSLY LISTED ITEMS REMAIN UNRESOLVED. 2). Last A1 truss towards the front of the house needs to have dirt coverage removed so we can verify original integrity. Back side of truss on the left side of the house > BACK LEFT SIDE OF TRUSS AT THE BOTTOM CORD ALONG WITH THE WEBS STILL NEED DIRT RMOVED. 3). Detail A on plan page S-5 is not complete as required. FBC [A]107.4 > THE BRACING WAS NOT INSTALLED AND/OR ANCHORED AS REQUIRED IN THE DETAIL ON THE PLAN PAGE. CORRECTION OR REVISION REQUIRED. IF REVISION IS SUBMITTED - THE TIE DOWN USED WILL STILL REQUIRE ANCHORS INTO THE BEAM. 3/5/2026 - PREVIOUS INSPECTION NOTES 3/5/26: Previously listed items 2 and 3 remain unresolved. 2). Last A1 truss towards the front of the house needs to have dirt coverage removed so we can verify original integrity. 3). Detail A on plan page S-5 is not complete as required. FBC [A]107.4 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 2/26/2026 11:42:53 AM *** 2/26/26: Check at next inspection. 1). Please have permit box laying on the ground mounted in an upright position. FBC [A]107.3.1 / FBC [A]107.3.1 2). Last A1 truss towards the front of the house needs to have dirt coverage removed so we can verify original integrity. 3). Detail A on plan page S-5 is not complete as required. FBC [A]107.4
ROOF VALLEY & METAL 03/05/2026 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 3/5/2026 2:22:20 PM *** 3/5/26: Previously listed items 2 and 3 remain unresolved. 2). Last A1 truss towards the front of the house needs to have dirt coverage removed so we can verify original integrity. 3). Detail A on plan page S-5 is not complete as required. FBC [A]107.4 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 2/26/2026 11:42:53 AM *** 2/26/26: Check at next inspection. 1). Please have permit box laying on the ground mounted in an upright position. FBC [A]107.3.1 / FBC [A]107.3.1 2). Last A1 truss towards the front of the house needs to have dirt coverage removed so we can verify original integrity. 3). Detail A on plan page S-5 is not complete as required. FBC [A]107.4
WALL SHEATHING 02/26/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 2/26/2026 11:27:39 AM ***
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/26/2026 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 2/26/2026 11:42:53 AM *** 2/26/26: Check at next inspection. 1). Please have permit box laying on the ground mounted in an upright position. FBC [A]107.3.1 / FBC [A]107.3.1 2). Last A1 truss towards the front of the house needs to have dirt coverage removed so we can verify original integrity. 3). Detail A on plan page S-5 is not complete as required. FBC [A]107.4
TIE BEAM / LINTEL 02/20/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 2/20/2026 11:21:06 AM *** 2/19/2026 - PREVIOUS INSPECTION NOTES 2/19/26: 1). Back right column: (2) Dowel / down rods do not meet the minimum clearance (2" from face of block and/or 3/4: from inside of block) as required. (FBC-R606.3.4) Spray painted orange.
TIE BEAM / LINTEL 02/19/2026 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 2/19/2026 12:30:40 PM *** 2/19/26: 1). Back right column: (2) Dowel / down rods do not meet the minimum clearance (2" from face of block and/or 3/4: from inside of block) as required. (FBC-R606.3.4) Spray painted orange.
MONOLITHIC SLAB 02/06/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 2/6/2026 9:35:20 AM *** 2/4/2026 - PREVIOUS INSPECTION NOTES 2/4/26: Previously listed items for footers are not fully resolved. Please make footers match plan requirements for width/depth and 45degree back angle. Re-tamping was in progress at time of inspection. 2/3/2026 - PREVIOUS INSPECTION NOTES 2/3/26: 1). front entry area does not meet K/SD2 plan requirements as shown. FBC [A]107.4 2). Entire slab area at back of house needs to be re-tamped to match compaction requirements. FBCR 506.2.1 / FBC [A]107.4 3). Back slab area. Remove foreign material under plastic. Marked with orange spray paint. Builder to check entire slab area once re-compaction is complete. FBC R318.6.2 Areas requiring fixing are marked on plans.
MONOLITHIC SLAB 02/04/2026 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 2/4/2026 2:53:59 PM *** 2/4/26: Previously listed items for footers are not fully resolved. Please make footers match plan requirements for width/depth and 45degree back angle. Re-tamping was in progress at time of inspection. 2/3/2026 - PREVIOUS INSPECTION NOTES 2/3/26: 1). front entry area does not meet K/SD2 plan requirements as shown. FBC [A]107.4 2). Entire slab area at back of house needs to be re-tamped to match compaction requirements. FBCR 506.2.1 / FBC [A]107.4 3). Back slab area. Remove foreign material under plastic. Marked with orange spray paint. Builder to check entire slab area once re-compaction is complete. FBC R318.6.2 Areas requiring fixing are marked on plans.
MONOLITHIC SLAB 02/03/2026 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 2/3/2026 2:24:17 PM *** 2/3/26: 1). front entry area does not meet K/SD2 plan requirements as shown. FBC [A]107.4 2). Entire slab area at back of house needs to be re-tamped to match compaction requirements. FBCR 506.2.1 / FBC [A]107.4 3). Back slab area. Remove foreign material under plastic. Marked with orange spray paint. Builder to check entire slab area once re-compaction is complete. FBC R318.6.2 Areas requiring fixing are marked on plans.
PLUMBING 1ST ROUGH UNDERGROUND 01/30/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 1/30/2026 9:31:48 AM ***
FORMBOARD SURVEY (OFFICE USE ONLY) 01/29/2026 APPROVED PFLANAGAN
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 01/29/2026 APPROVED PKNAPIK
WATER METER INSTALLATION REQUEST 01/29/2026 APPROVED CBOWERMASTER
U-CROSS CONNECTION
ROW - FINAL APRON (AFTER POUR)
ROW- FINAL SURVEY/GRADING CERTIFICATION
ROW - FINAL INSPECTION
U -UTILITY RESIDENTIAL FINAL
BLD - BUILDING FINAL

Review History

Department Status Date In Date Out
BLD COMPLETE 03/13/2026 03/18/2026
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SW1 COMPLETE 01/29/2026 01/29/2026
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 01/29/2026 01/29/2026
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 01/29/2026 01/29/2026
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 01/23/2026 01/26/2026
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BADMIN INFORMATION 01/16/2026 01/16/2026
Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM NOC NOT RECORDED/CERTIFIED
MECH COMPLETE 12/02/2025 12/02/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ELEC COMPLETE 12/02/2025 12/09/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SWALE COMPLETE 11/21/2025 12/04/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
BLD COMPLETE 11/20/2025 11/26/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 11/20/2025 11/26/2025
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC HOLD 11/20/2025 12/01/2025
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Dryer has to be GFCI protected. NEC 2020 210.8
ENGIN1 COMPLETE 11/20/2025 11/21/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 11/20/2025 11/21/2025
LOCATE COMPLETE 11/20/2025 11/24/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 11/20/2025 11/24/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM State Card need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition
SW1 COMPLETE 11/20/2025 12/01/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM COPC Note: This home is a corner lot - no improved lots to the right of this proposed home.
ZON COMPLETE 11/20/2025 11/24/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
FC IMPACT FEE EMS ¤62.00 12/11/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 12/11/2025
FC IMPACT FEE LIBRARY ¤268.00 12/11/2025
FIRE RES IMPACT FEE 10-25 ¤942.00 12/11/2025
PEP TANK INSTALL ¤756.74 12/11/2025
PARKS IMPACT FEE 10-25 ¤3,164.00 12/11/2025
RSI DRIVEWAY AFTER POUR ¤16.25 12/11/2025
RSE DRIVE PRE POUR INSPECTION ¤32.50 12/11/2025
RSI FIELD SURVEY INSPECTION ¤48.75 12/11/2025
RSI FORMBOARD REVIEW ¤16.25 12/11/2025
RSI PLAN REVIEW NEW ¤48.75 12/11/2025
RSI FNL SURVEY/GRADING CERT ¤48.75 12/11/2025
RSI ROW FINAL INSPECTION ¤16.25 12/11/2025
SCHOOL BOARD IMPACT FEE RES ¤5,450.00 12/11/2025
WASTEWATER MAIN EXTENSION IMPA ¤2,385.00 12/11/2025
SURCHARGE FS 533.721 ¤12.80 12/11/2025
SURCHARGE - FS 468.631 ¤19.20 12/11/2025
SW ENG RES REVIEW 240 ¤240.00 12/11/2025
WATER METER W/ TAP ¤2,326.93 12/11/2025
TRANSP RES IMPACT FEE 10-25 ¤6,567.34 12/11/2025
SEWER CREDIT (¤1,147.00) 12/11/2025
WASTEWATER PERM INSPECTION ¤80.00 12/11/2025
WASTEWATER PERM REVIEW ¤25.00 12/11/2025
SEWER CAPITAL FACILITY ¤4,415.00 12/11/2025
WATER CAPITAL FACILITY FEE ¤3,790.49 12/11/2025
WATER PERMIT REVIEW ¤25.00 12/11/2025
WATER MAIN EXTENSION IMPACT ¤917.27 12/11/2025
SITE PLAN 30 ¤30.00 12/11/2025
WATER- TURN ON ¤50.00 12/11/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 12/11/2025
INSPECTION - RESIDENTIAL ¤973.50 12/11/2025
PLAN REVIEW - RESIDENTIAL ¤276.12 12/11/2025
REINSPECTION RESIDENTIAL ¤40.00
REINSPECTION RESIDENTIAL ¤40.00
REINSPECTION RESIDENTIAL ¤40.00
REINSPECTION RESIDENTIAL ¤40.00
Fees Total Due: ¤160.00 Total Paid: ¤32,104.89