Permit #2025110726
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-5112-00000-0110 |
| Block: 00000 |
| Subdivision: 1164 - PINE LAKES INDUSTRIAL PARK |
| Job Phone: 386-238-1570 |
| Location Address: 4 COMMERCE BLVD |
| Type: CSD - COMMERCIAL SITE DEVELOPMENT |
| Issue Date: 12/12/2025 |
| NOC: Unknown |
| Applicant name: GARY LYNN ROBERTS |
| Owner: GIOIA PROPERTIES LLC |
|
Address 10 COMMERCE BLVD PALM COAST, FL 32164 |
| Lot: 0110 |
| Job Description: SITE WORK: GIOIA SAILS ADDITION |
| Type: CN |
Contractor
COMMERCIAL CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
7 SUNSHINE BLVD ORMOND BEACH, FL 32174 |
CGC059441 (Exp: 08/31/2026) | 386-238-1570 | 386-238-1571 |
Inspection History
| Type | Request Date | Result | Inspector |
| MAINT BOND ACCEPTANCE (OFFICE) | 03/09/2026 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no site work constructed or touched-OPEN BUILDING IN REAR WAS CLOSED UP WITH A NEW OPEN CANOPY(STEEL STRUCTURE) next to closed up portion-installed on existing concrete and aphalt drive | |||
| CLOSE OUT DOCUMENTS | 03/09/2026 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no site work constructed or touched-OPEN BUILDING IN REAR WAS CLOSED UP WITH A NEW OPEN CANOPY(STEEL STRUCTURE) next to closed up portion-installed on existing concrete and aphalt drive | |||
| PLAN - PRE-CON 386-986-3750 | 03/09/2026 | APPROVED - AS NOTED | LFITZGERALD |
| Note: never scheduled-no site work to be constructed or touched | |||
| PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY | 03/09/2026 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no site work constructed or touched-OPEN BUILDING IN REAR WAS CLOSED UP WITH A NEW OPEN CANOPY(STEEL STRUCTURE) next to closed up portion-installed on existing concrete and aphalt drive | |||
| IRRIGATION AFFIDAVIT | 03/09/2026 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no Landscaping required or installed-no site work constructed or touched-OPEN BUILDING IN REAR WAS CLOSED UP WITH A NEW OPEN CANOPY(STEEL STRUCTURE0 next tp closed up portion-installed on existing concrete and aphalt drive | |||
| LDSC-IRRIGATION FINAL | 03/09/2026 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no landscape required or installed-no site work constructed or touched-OPEN BUILDING IN REAR WAS CLOSED UP WITH A NEW OPEN CANOPY(STEEL STRUCTURE0 next tp closed up portion-installed on existing concrete and aphalt drive | |||
| LDSC- LANDSCAPE / IRRIGATION AS-BUILT | 03/09/2026 | APPROVED - AS NOTED | LFITZGERALD |
| Note: Inspector Notes from Inspection 6070 no landscape required or installed-no site work constructed or touched-OPEN BUILDING IN REAR WAS CLOSED UP WITH A NEW OPEN CANOPY(STEEL STRUCTURE0 next tp closed up portion-installed on existing concrete and aphalt drive | |||
| LDSC- LANDSCAPE FINAL | 03/09/2026 | APPROVED - AS NOTED | LFITZGERALD |
| Note: Inspector Notes from Inspection 6145 Inspector Notes from Inspection 6070 no landscape required or installed-no site work constructed or touched-OPEN BUILDING IN REAR WAS CLOSED UP WITH A NEW OPEN CANOPY(STEEL STRUCTURE0 next tp closed up portion-installed on existing concrete and aphalt drive | |||
| UC-SUBSTANTIAL WALK-THRU | 03/09/2026 | APPROVED - AS NOTED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9235 no site work constructed or touched-OPEN BUILDING IN REAR WAS CLOSED UP WITH A NEW OPEN CANOPY(STEEL STRUCTURE0 next tp closed up portion-installed on existing concrete and aphalt drive | |||
| UC- PRELIMINARY AS-BUILTS | 03/09/2026 | APPROVED - AS NOTED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9140 Inspector Notes from Inspection 9235 no site work constructed or touched-OPEN BUILDING IN REAR WAS CLOSED UP WITH A NEW OPEN CANOPY(STEEL STRUCTURE0 next tp closed up portion-installed on existing concrete and aphalt drive | |||
| UC-FINAL SITE INSPECTION | 03/09/2026 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no site work constructed or touched-OPEN BUILDING IN REAR WAS CLOSED UP WITH A NEW OPEN CANOPY(STEEL STRUCTURE0 next tp closed up portion-installed on existing concrete and aphalt drive | |||
| UC-FINAL SITE STABILIZATION | 03/09/2026 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no site work constructed or touched-OPEN BUILDING IN REAR WAS CLOSED UP WITH A NEW OPEN CANOPY(STEEL STRUCTURE) next to closed up portion-installed on existing concrete and aphalt drive | |||
| U - UTILITY COMMERCIAL FINAL | 03/09/2026 | APPROVED - AS NOTED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9142 Inspector Notes from Inspection 9140 Inspector Notes from Inspection 9235 no site work constructed or touched-OPEN BUILDING IN REAR WAS CLOSED UP WITH A NEW OPEN CANOPY(STEEL STRUCTURE0 next tp closed up portion-installed on existing concrete and aphalt drive | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 03/09/2026 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no site work constructed or touched-OPEN BUILDING IN REAR WAS CLOSED UP WITH A NEW OPEN CANOPY(STEEL STRUCTURE) next to closed up portion-installed on existing concrete and aphalt drive 1 curb inlet near by had erosion sock in just in case | |||
| UROW- CURBING & GUTTER | 03/09/2026 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no site work constructed or touched-OPEN BUILDING IN REAR WAS CLOSED UP WITH A NEW OPEN CANOPY(STEEL STRUCTURE0 next tp closed up portion-installed on existing concrete and aphalt drive | |||
| U-ROW FINAL | 03/09/2026 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no site work constructed or touched-OPEN BUILDING IN REAR WAS CLOSED UP WITH A NEW OPEN CANOPY(STEEL STRUCTURE0 next tp closed up portion-installed on existing concrete and aphalt drive |
Review History
| Department | Status | Date In | Date Out |
| BLD | INFORMATION | 02/06/2026 | 02/10/2026 |
| Note: Marked INFORMATION By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM BOLT INSPECTION UPLOADED TO WRONG PERMIT. PLEASE UPLOAD TO THE BC PERMIT 2025110363 FOR REVIEW. THANK YOU. | |||
| DSD | COMPLETE | 12/11/2025 | 12/11/2025 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| DSD | HOLD | 12/05/2025 | 12/05/2025 |
| Note: Held By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/21/2025 | 11/21/2025 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 11/21/2025 | 11/24/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| PLENG | COMPLETE | 11/21/2025 | 11/21/2025 |
| Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM | |||
| PLLA | COMPLETE | 11/21/2025 | 11/21/2025 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| UD1 | COMPLETE | 11/21/2025 | 11/24/2025 |
| Note: Released By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMINISTRATIVE- SITE DEVELOP | ¤125.00 | 12/12/2025 |
| SITE DEVELOPMENT ADMIN PLANNIN | ¤179.00 | 12/12/2025 |
| SITE INSPECTION | ¤456.00 | 12/12/2025 |
| SITE PLAN 29 | ¤29.00 | 12/12/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤789.00 |