Permit #2025110726

Permit Details

Status: FINAL

Parcel Id: 07-11-31-5112-00000-0110
Block: 00000
Subdivision: 1164 - PINE LAKES INDUSTRIAL PARK
Job Phone: 386-238-1570
Location Address: 4 COMMERCE BLVD
Type: CSD - COMMERCIAL SITE DEVELOPMENT
Issue Date: 12/12/2025
NOC: Unknown
Applicant name: GARY LYNN ROBERTS
Owner: GIOIA PROPERTIES LLC

Address

10 COMMERCE BLVD

PALM COAST, FL 32164

Lot: 0110
Job Description: SITE WORK: GIOIA SAILS ADDITION
Type: CN

Contractor

COMMERCIAL CONSTRUCTION INC.
Status Location Address State License Number Phone Fax
ACTIVE

7 SUNSHINE BLVD

ORMOND BEACH, FL 32174

CGC059441 (Exp: 08/31/2026) 386-238-1570 386-238-1571

Inspection History

Type Request Date Result Inspector
MAINT BOND ACCEPTANCE (OFFICE) 03/09/2026 APPROVED - AS NOTED LFITZGERALD
Note: no site work constructed or touched-OPEN BUILDING IN REAR WAS CLOSED UP WITH A NEW OPEN CANOPY(STEEL STRUCTURE) next to closed up portion-installed on existing concrete and aphalt drive
CLOSE OUT DOCUMENTS 03/09/2026 APPROVED - AS NOTED LFITZGERALD
Note: no site work constructed or touched-OPEN BUILDING IN REAR WAS CLOSED UP WITH A NEW OPEN CANOPY(STEEL STRUCTURE) next to closed up portion-installed on existing concrete and aphalt drive
PLAN - PRE-CON 386-986-3750 03/09/2026 APPROVED - AS NOTED LFITZGERALD
Note: never scheduled-no site work to be constructed or touched
PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY 03/09/2026 APPROVED - AS NOTED LFITZGERALD
Note: no site work constructed or touched-OPEN BUILDING IN REAR WAS CLOSED UP WITH A NEW OPEN CANOPY(STEEL STRUCTURE) next to closed up portion-installed on existing concrete and aphalt drive
IRRIGATION AFFIDAVIT 03/09/2026 APPROVED - AS NOTED LFITZGERALD
Note: no Landscaping required or installed-no site work constructed or touched-OPEN BUILDING IN REAR WAS CLOSED UP WITH A NEW OPEN CANOPY(STEEL STRUCTURE0 next tp closed up portion-installed on existing concrete and aphalt drive
LDSC-IRRIGATION FINAL 03/09/2026 APPROVED - AS NOTED LFITZGERALD
Note: no landscape required or installed-no site work constructed or touched-OPEN BUILDING IN REAR WAS CLOSED UP WITH A NEW OPEN CANOPY(STEEL STRUCTURE0 next tp closed up portion-installed on existing concrete and aphalt drive
LDSC- LANDSCAPE / IRRIGATION AS-BUILT 03/09/2026 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 6070 no landscape required or installed-no site work constructed or touched-OPEN BUILDING IN REAR WAS CLOSED UP WITH A NEW OPEN CANOPY(STEEL STRUCTURE0 next tp closed up portion-installed on existing concrete and aphalt drive
LDSC- LANDSCAPE FINAL 03/09/2026 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 6145 Inspector Notes from Inspection 6070 no landscape required or installed-no site work constructed or touched-OPEN BUILDING IN REAR WAS CLOSED UP WITH A NEW OPEN CANOPY(STEEL STRUCTURE0 next tp closed up portion-installed on existing concrete and aphalt drive
UC-SUBSTANTIAL WALK-THRU 03/09/2026 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9235 no site work constructed or touched-OPEN BUILDING IN REAR WAS CLOSED UP WITH A NEW OPEN CANOPY(STEEL STRUCTURE0 next tp closed up portion-installed on existing concrete and aphalt drive
UC- PRELIMINARY AS-BUILTS 03/09/2026 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9140 Inspector Notes from Inspection 9235 no site work constructed or touched-OPEN BUILDING IN REAR WAS CLOSED UP WITH A NEW OPEN CANOPY(STEEL STRUCTURE0 next tp closed up portion-installed on existing concrete and aphalt drive
UC-FINAL SITE INSPECTION 03/09/2026 APPROVED - AS NOTED LFITZGERALD
Note: no site work constructed or touched-OPEN BUILDING IN REAR WAS CLOSED UP WITH A NEW OPEN CANOPY(STEEL STRUCTURE0 next tp closed up portion-installed on existing concrete and aphalt drive
UC-FINAL SITE STABILIZATION 03/09/2026 APPROVED - AS NOTED LFITZGERALD
Note: no site work constructed or touched-OPEN BUILDING IN REAR WAS CLOSED UP WITH A NEW OPEN CANOPY(STEEL STRUCTURE) next to closed up portion-installed on existing concrete and aphalt drive
U - UTILITY COMMERCIAL FINAL 03/09/2026 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9142 Inspector Notes from Inspection 9140 Inspector Notes from Inspection 9235 no site work constructed or touched-OPEN BUILDING IN REAR WAS CLOSED UP WITH A NEW OPEN CANOPY(STEEL STRUCTURE0 next tp closed up portion-installed on existing concrete and aphalt drive
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 03/09/2026 APPROVED - AS NOTED LFITZGERALD
Note: no site work constructed or touched-OPEN BUILDING IN REAR WAS CLOSED UP WITH A NEW OPEN CANOPY(STEEL STRUCTURE) next to closed up portion-installed on existing concrete and aphalt drive 1 curb inlet near by had erosion sock in just in case
UROW- CURBING & GUTTER 03/09/2026 APPROVED - AS NOTED LFITZGERALD
Note: no site work constructed or touched-OPEN BUILDING IN REAR WAS CLOSED UP WITH A NEW OPEN CANOPY(STEEL STRUCTURE0 next tp closed up portion-installed on existing concrete and aphalt drive
U-ROW FINAL 03/09/2026 APPROVED - AS NOTED LFITZGERALD
Note: no site work constructed or touched-OPEN BUILDING IN REAR WAS CLOSED UP WITH A NEW OPEN CANOPY(STEEL STRUCTURE0 next tp closed up portion-installed on existing concrete and aphalt drive

Review History

Department Status Date In Date Out
BLD INFORMATION 02/06/2026 02/10/2026
Note: Marked INFORMATION By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM BOLT INSPECTION UPLOADED TO WRONG PERMIT. PLEASE UPLOAD TO THE BC PERMIT 2025110363 FOR REVIEW. THANK YOU.
DSD COMPLETE 12/11/2025 12/11/2025
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
DSD HOLD 12/05/2025 12/05/2025
Note: Held By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
BLD COMPLETE 11/21/2025 11/21/2025
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
ELEC COMPLETE 11/21/2025 11/24/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
PLENG COMPLETE 11/21/2025 11/21/2025
Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM
PLLA COMPLETE 11/21/2025 11/21/2025
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
UD1 COMPLETE 11/21/2025 11/24/2025
Note: Released By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMINISTRATIVE- SITE DEVELOP ¤125.00 12/12/2025
SITE DEVELOPMENT ADMIN PLANNIN ¤179.00 12/12/2025
SITE INSPECTION ¤456.00 12/12/2025
SITE PLAN 29 ¤29.00 12/12/2025
Fees Total Due: ¤0.00 Total Paid: ¤789.00