I want to search for...

Permit #2025110794

Permit Details

Status: COED

Parcel Id: 21-12-31-5560-00000-0780
CONDITIONED SPACE: 1909 sqft
GARAGE: 495 sqft
OPENED PORCH (WITH ROOF) : 251 sqft
OPENED PORCH (WITH ROOF) : 138 sqft
Total Square Footage: 2793 sqft
Subdivision: 2336 - SEMINOLE PALMS SUBDIVISION PHASE 1
Job Phone: 407-717-5418
Location Address: 288 MONTGOMERY CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/08/2025
NOC: RECORDED
Applicant name: CARLOS ANTONIO SERRANO
Owner: NVR INC

Address

8649 BAYPINE ROAD

JACKSONVILLE, FL 32256

Address

BUILDING 5 SUITE 202

JACKSONVILLE, FL 32256

Lot: 78
Contracted Stated Job Value: ¤150,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

RYAN HOMES
Status Location Address Mailing Address State License Number Phone
ACTIVE

8649 BAYPINE RD

JACKSONVILLE, FL 32256

BLDG 7, STE 202

JACKSONVILLE, FL 32256

CBC1256450 (Exp: 08/31/2026) 407-717-5418

Sub Contractors

JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
JOSEPH H STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PKWY

SANFORD, FL 32771

CAC043953 (Exp: 08/31/2026) 877-906-1113
JACK DOUGLAS LANIER
Status Location Address State License Number Phone Fax
ACTIVE

485 COMMERCE WAY

LONGWOOD , FL 32750

CCC058022 (Exp: 08/31/2026) (321)441-2300 (321)441-2313
BRITT MICHAEL JENKINS
Status Location Address State License Number Phone
ACTIVE

86 COLUMBIA DR

POOLER, GA 31322

CFC1430770 (Exp: 08/31/2026) 912-330-8151

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 03/17/2026 FINAL APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 3/17/2026 12:35:32 PM *** Final Approved 3/10/2026 - PREVIOUS INSPECTION NOTES 3/10/26: 1). Laundry sink leaking from tap. FBC-P2503.5.2 2). Remove plastic covering from register in Pantry closet. FBC [A] 110.3(6) 3). UL 325.6 / 16CFR part 1211 - Garage door opener safety eyes - Maximum OC height of 6" (minimum 2" off finished floor)
BLD - BUILDING FINAL 03/10/2026 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 3/10/2026 1:55:10 PM *** 3/10/26: 1). Laundry sink leaking from tap. FBC-P2503.5.2 2). Remove plastic covering from register in Pantry closet. FBC [A] 110.3(6) 3). UL 325.6 / 16CFR part 1211 - Garage door opener safety eyes - Maximum OC height of 6" (minimum 2" off finished floor)
U-CROSS CONNECTION 03/02/2026 APPROVED - AS NOTED BHAINES
Note: No CC, IRR with reclaim.
U -UTILITY RESIDENTIAL FINAL 03/02/2026 FINAL APPROVED BHAINES
ROW - FINAL APRON (AFTER POUR) 02/24/2026 APPROVED FSLADISH
Note: 2/24/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/24/2026 APPROVED FSLADISH
ROW FIELD SURVEY /GRADING CERTIFICATION 02/24/2026 APPROVED FSLADISH
Note: 2/24/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW - FINAL INSPECTION 02/24/2026 APPROVED FSLADISH
Note: 2/24/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ELECTRIC - EARLY POWER 01/30/2026 APPROVED - AS NOTED BTAYLOR
Note: 1-30-26 1. Emailed FPL at 12:16. Inspector Notes from Inspection 2200 12-29-25 1. Emailed FPL at 1:02.
ROW- PRE-APRON (PRE-POUR) 01/23/2026 APPROVED FSLADISH
Note: 1/23/26 . BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER. ALSO VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
DRYWALL NAILING 01/13/2026 APPROVED KSANDOE
Note: 1/12/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 1-7-26 1. Rear sliders not installed. 2. Front door top gap is too large need to fill with solid blocking. Inspector Notes from Inspection 2460 1-6-26 1. Need to add H10's to interior bearing walls. 2. Need to add HTT5' to shear walls. 3. Need to add LGT2 to double truss in garage. 12/29/2025 - PREVIOUS INSPECTION NOTES
INSULATION 01/12/2026 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2420 1-7-26 1. Rear sliders not installed. 2. Front door top gap is too large need to fill with solid blocking. Inspector Notes from Inspection 2460 1-6-26 1. Need to add H10's to interior bearing walls. 2. Need to add HTT5' to shear walls. 3. Need to add LGT2 to double truss in garage. 12/29/2025 - PREVIOUS INSPECTION NOTES
DRYWALL NAILING 01/12/2026 CANCELLED BY APPLICANT BTAYLOR
Note: Inspector Notes from Inspection 2420 1-7-26 1. Rear sliders not installed. 2. Front door top gap is too large need to fill with solid blocking. Inspector Notes from Inspection 2460 1-6-26 1. Need to add H10's to interior bearing walls. 2. Need to add HTT5' to shear walls. 3. Need to add LGT2 to double truss in garage. 12/29/2025 - PREVIOUS INSPECTION NOTES
ALL ROUGH 01/07/2026 APPROVED - AS NOTED BTAYLOR
Note: 1-7-26 1. Rear sliders not installed. 2. Front door top gap is too large need to fill with solid blocking. Inspector Notes from Inspection 2460 1-6-26 1. Need to add H10's to interior bearing walls. 2. Need to add HTT5' to shear walls. 3. Need to add LGT2 to double truss in garage. 12/29/2025 - PREVIOUS INSPECTION NOTES
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/05/2026 APPROVED - AS NOTED BTAYLOR
Note: 1-6-26 1. Need to add H10's to interior bearing walls. 2. Need to add HTT5' to shear walls. 3. Need to add LGT2 to double truss in garage. 12/29/2025 - PREVIOUS INSPECTION NOTES
ROOF VALLEY & METAL 12/29/2025 APPROVED BTAYLOR
LATH/BRICK/ WATER BARRIER 12/29/2025 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/29/2025 CANCELLED BY APPLICANT BTAYLOR
ELECTRIC-TUG 12/29/2025 APPROVED - AS NOTED BTAYLOR
Note: 12-29-25 1. Emailed FPL at 1:02.
WALL SHEATHING 12/22/2025 APPROVED BTAYLOR
MONOLITHIC SLAB 12/15/2025 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 12/15/2025 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2075 12-11-25 1. Underground plumbing has been inspected and will be approved when it is called in.
FORMBOARD SURVEY (OFFICE USE ONLY) 12/12/2025 APPROVED RRICKS
Note: 12/10/2025 2:52:09 PM- PREVIOUS INSPECTION NOTES THE CENTERLINE E;LEVATIONS ARE NOT MATCHING WITH TGHE GRADING PLAN THAT IS SUMMITED WITH THE CITY
GRAVITY SEWER TEST 12/11/2025 APPROVED - AS NOTED BTAYLOR
Note: 12-11-25 1. Underground plumbing has been inspected and will be approved when it is called in.
SEWER TIE IN 12/11/2025 APPROVED BTAYLOR
WATER METER INSTALLATION REQUEST 12/11/2025 APPROVED CBOWERMASTER
FORMBOARD SURVEY (OFFICE USE ONLY) 12/10/2025 Disapproved - NO FEE PFLANAGAN
Note: THE CENTERLINE E;LEVATIONS ARE NOT MATCHING WITH TGHE GRADING PLAN THAT IS SUMMITED WITH THE CITY

Review History

Department Status Date In Date Out
SW1 COMPLETE 12/12/2025 12/12/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM There are slight discrepancies in centerline elevations and curb elevations from formbaord and approved grading plan. Elevations are all consistent. Approved as noted.
SW1 HOLD 12/10/2025 12/10/2025
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM CENTERLINE ELEVATIONS DO NOT MATCH THE GRADING PLAN CENTERLINE ELEVATIONS
ZON COMPLETE 12/10/2025 12/10/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BADMIN INFORMATION 12/09/2025 12/09/2025
Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM NOC has wrong permit # and its missing description of improvement.
BADMIN INFORMATION 12/09/2025 12/09/2025
Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM NOC is missing description of improvement. Need to be Single Family Residence.
BLD COMPLETE 12/05/2025 12/05/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
ZON COMPLETE 12/03/2025 12/03/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
MECH COMPLETE 12/03/2025 12/03/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 12/03/2025 12/05/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. ok 2. Truss letter from engineer needs to be addressed to City of Palm Coast and have address on it (Not just lot number) 3. ok 4. ok
SW1 COMPLETE 12/03/2025 12/05/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM After conversations and emails we have agreed to allow this permit to move forwards as noted: Per Patrick Buckley - Using signed and sealed footer detail sheet, "Grade detail letter" attachment We will instruct the inspectors through pre-loaded inspector's notes to look for this attachment in conjunction with the approved foundation plans and details. - It will be Ryan Home's responsibility to ensure the detail sheet is uploaded with the permit so it becomes part of the permit record. - It will be Ryan Home's responsibility to ensure the detail sheet is on site, with the other approved plans, available for inspectors. - We will accept this stand-alone detail sheet on the model homes / prototypes only. - When the home goes into production building, we will request the details to be added to the foundation plans . Please ensure these conditions are met to mitigate any delays.
BLD HOLD 11/24/2025 12/02/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. Provide missing details page and provide foundation page you are going to use. All details pages show slab insulation. Need page for Florida. 2. Truss letter from engineer needs to be addressed to City of Palm Coast and have address on it (Not just lot number) 3. Truss layout / placement plan from truss manufacturer 4. Missing wall panel attachment detail FC_1B
CUSVC COMPLETE 11/24/2025 12/02/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 11/24/2025 12/01/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/24/2025 11/25/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 11/24/2025 11/25/2025
LOCATE COMPLETE 11/24/2025 12/01/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 11/24/2025 11/25/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide return air out of bedroom 3 on duct layout 2. M1 plan shows ducted return jumpers. The duct layout shows tranfers over the door. Revise to match
SW1 HOLD 11/24/2025 12/03/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Grading Plan and Foundation Plan Comments: - Based on the information provided, there is more than a 1' drop adjacent to the proposed FFE at the front of the homes on both sides. The foundation plan calls for an 8" minimum. Please provide an acceptable range or another detail where the grades drop more than minimum 8". This will ensure that the grade drop can be met and meet Florida building code 403.1.4 Please feel free to call or email if there are any questions or concerns.
ZON HOLD 11/24/2025 11/24/2025
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Floor plan: provide the total depth of the garage includiing the storage area. Please know if it can't exceeds 30'.
URB COMPLETE 11/24/2025 12/03/2025
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
WATER-METER ¤874.47 12/08/2025
WATER- TURN ON ¤50.00 12/08/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 12/08/2025
INSPECTION - RESIDENTIAL ¤1,067.00 12/08/2025
PLAN REVIEW - RESIDENTIAL ¤302.64 12/08/2025
FC IMPACT FEE EMS ¤62.00 12/08/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 12/08/2025
FC IMPACT FEE LIBRARY ¤268.00 12/08/2025
FIRE RES IMPACT FEE 10-25 ¤942.00 12/08/2025
WATER METER W/OUT TAP ¤965.03 12/08/2025
PARKS IMPACT FEE 10-25 ¤3,164.00 12/08/2025
RECLAIM WATER PERMIT INSPECTIO ¤40.00 12/08/2025
RSI DRIVEWAY AFTER POUR ¤16.25 12/08/2025
RSE DRIVE PRE POUR INSPECTION ¤32.50 12/08/2025
RSI FIELD SURVEY INSPECTION ¤48.75 12/08/2025
RSI FORMBOARD REVIEW ¤16.25 12/08/2025
RSI PLAN REVIEW NEW ¤48.75 12/08/2025
RSI FNL SURVEY/GRADING CERT ¤48.75 12/08/2025
RSI ROW FINAL INSPECTION ¤16.25 12/08/2025
SURCHARGE FS 533.721 ¤14.00 12/08/2025
SURCHARGE - FS 468.631 ¤21.00 12/08/2025
TRANSP RES IMPACT FEE 10-25 ¤7,196.93 12/08/2025
TRANSP RES IMPACT FEE 10-25 (¤7,196.93) 12/08/2025
WASTEWATER PERM INSPECTION ¤80.00 12/08/2025
WASTEWATER PERM REVIEW ¤25.00 12/08/2025
SEWER CAPITAL FACILITY ¤2,368.69 12/08/2025
WATER CAPITAL FACILITY FEE ¤1,744.18 12/08/2025
WATER PERMIT REVIEW ¤25.00 12/08/2025
SITE PLAN 30 ¤30.00 12/08/2025
Fees Total Due: ¤0.00 Total Paid: ¤12,518.51