I want to search for...
Permit #2025110808
Permit Details
Status: FINAL
| Parcel Id: 23-11-30-6060-00000-00G0 |
| Subdivision: - |
| Job Phone: 904-268-5515 |
| Location Address: 300 WISTERIA HILL DR |
| Type: CSD - COMMERCIAL SITE DEVELOPMENT |
| Issue Date: 12/03/2025 |
| NOC: Unknown |
| Applicant name: MICHAEL M PADGETT |
| Owner: MARBELLA APARTMENTS LLC |
|
Address 3060 PEACHTREE ROAD NW SUITE 970 ATLANTA, GA 30305 |
| Job Description: STAGING 1 & 2 SITE WORK: WHITEVIEW CLUBHOUSE, BLDGS 1 AND 2 |
| Type: CN |
Contractor
SUMMIT CONTRACTING GROUP INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
7595 BAYMEADOWS WAY SUITE 100 JACKSONVILLE, FL 32204 |
CGC1513073 (Exp: 08/31/2026) | 904-268-5515 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | 12/05/2025 | APPROVED | KSANDOE |
| Note: 12/4/2025 - PREVIOUS INSPECTION NOTES 5,6, 13,14 unchecked 11/6/2025 - PREVIOUS INSPECTION NOTES | |||
| BLD- ADA PARKING | 12/05/2025 | APPROVED | KSANDOE |
| Note: 12/4/2025 - PREVIOUS INSPECTION NOTES 5,6, 13,14 unchecked 11/6/2025 - PREVIOUS INSPECTION NOTES | |||
| BLD - ADA COMPLIANT | 12/05/2025 | APPROVED | KSANDOE |
| Note: 12/4/2025 - PREVIOUS INSPECTION NOTES 5,6, 13,14 unchecked 11/6/2025 - PREVIOUS INSPECTION NOTES | |||
| BLD- ADA SIGNAGECONTROL | 12/05/2025 | APPROVED | KSANDOE |
| Note: 12/4/2025 - PREVIOUS INSPECTION NOTES 5,6, 13,14 unchecked 11/6/2025 - PREVIOUS INSPECTION NOTES | |||
| BLD - ADA SIGNAGE- INFOR/DIRECT | 12/05/2025 | APPROVED | KSANDOE |
| Note: 12/4/2025 - PREVIOUS INSPECTION NOTES 5,6, 13,14 unchecked 11/6/2025 - PREVIOUS INSPECTION NOTES | |||
| BLD- ADA VEHICULAR WAY | 12/05/2025 | APPROVED | KSANDOE |
| Note: 12/4/2025 - PREVIOUS INSPECTION NOTES 5,6, 13,14 unchecked 11/6/2025 - PREVIOUS INSPECTION NOTES | |||
| BLD - ADA SIGNAGE- INFOR/DIRECT | 12/04/2025 | PARTIALLY APPROVED | KSANDOE |
| Note: 5,6, 13,14 unchecked 11/6/2025 - PREVIOUS INSPECTION NOTES | |||
| LDSC-IRRIGATION FINAL | 12/04/2025 | APPROVED | RPICATAGI |
| BLD - UNDERGROUND SITE LIGHTING CONDUITS | 12/04/2025 | APPROVED | RMARTIN |
| Note: 11/6/2025 - PREVIOUS INSPECTION NOTES | |||
| BLD - SITE LIGHTING-PLACEMENT/FOUNDATION | 12/04/2025 | APPROVED - AS NOTED | RMARTIN |
| Note: 11/7/2025 - PREVIOUS INSPECTION NOTES Plans call for ground rods at each pole, have revision or make repair before next inspection, (phase 1, 2, and, 3) | |||
| BLD - SITE LIGHTING-POLE SET/FIXTURE | 12/04/2025 | APPROVED | RMARTIN |
| Note: 11/6/2025 - PREVIOUS INSPECTION NOTES | |||
| CLOSE OUT DOCUMENTS | 12/04/2025 | APPROVED | DRAMIREZ |
| BLD- ADA VEHICULAR WAY | 12/04/2025 | PARTIALLY APPROVED | KSANDOE |
| Note: 5,6, 13,14 unchecked 11/6/2025 - PREVIOUS INSPECTION NOTES | |||
| BLD- ADA SIGNAGECONTROL | 12/04/2025 | PARTIALLY APPROVED | KSANDOE |
| Note: 5,6, 13,14 unchecked 11/6/2025 - PREVIOUS INSPECTION NOTES | |||
| BLD - ADA COMPLIANT | 12/04/2025 | PARTIALLY APPROVED | KSANDOE |
| Note: 5,6, 13,14 unchecked 11/6/2025 - PREVIOUS INSPECTION NOTES | |||
| BLD- ADA PARKING | 12/04/2025 | PARTIALLY APPROVED | KSANDOE |
| Note: 5,6, 13,14 unchecked 11/6/2025 - PREVIOUS INSPECTION NOTES | |||
| LDSC- LANDSCAPE FINAL | 12/04/2025 | APPROVED - AS NOTED | RPICATAGI |
| Note: Large metal exit gate in front of Mail Kiosk is out of alignment in the open position and does not leave clear passing for exiting vehicles.. I recommend having that gate re-installed and realigned so that it can open completely without impairment to exiting vehicles. | |||
| UC-FINAL SITE INSPECTION | 12/04/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: 2/13/2025 - PREVIOUS INSPECTION NOTES not close to being ready ALL INSPECTIONS ARE RESULTED ON MAIN SITE PERMIT-ALL INSPECTIONS ON THIS PHASE1 PERMIT ARE DUPLICATES AND REQUIRE RESULTING AS WE TRY TO CLOSE OUT 1 PHASE AT A TIME | |||
| U - UTILITY COMMERCIAL FINAL | 12/04/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: ALL INSPECTIONS ARE RESULTED ON MAIN SITE PERMIT-ALL INSPECTIONS ON THIS PHASE1 PERMIT ARE DUPLICATES AND REQUIRE RESULTING AS WE TRY TO CLOSE OUT 1 PHASE AT A TIME | |||
| UROW -FINAL GRADE PRIOR SOD | 12/04/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: 11/6/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9240 turn lane on white mill-all sodded in on ROW next to widening/perimeter swale along existing homes where vinyl fence is,behind buildingds1,2 all sodded and slight positive grading so water makes its way to existing lake behind this project/swale alog whitemill next to asphalt path restored after slight diging while setting in power at power pole all satisfactory for PHASE 1 AND 2 ALL INSPECTIONS ARE RESULTED ON MAIN SITE PERMIT-ALL INSPECTIONS ON THIS PHASE1 PERMIT ARE DUPLICATES AND REQUIRE RESULTING AS WE TRY TO CLOSE OUT 1 PHASE AT A TIME | |||
| ROW - FINAL INSPECTION | 12/04/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: ALL INSPECTIONS ARE RESULTED ON MAIN SITE PERMIT-ALL INSPECTIONS ON THIS PHASE1 PERMIT ARE DUPLICATES AND REQUIRE RESULTING AS WE TRY TO CLOSE OUT 1 PHASE AT A TIME | |||
| UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) | 12/04/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: 10/28/2025 - PREVIOUS INSPECTION NOTES 10/27/2025 - PREVIOUS INSPECTION NOTES several directional arrows not yet installed/2nd lift asphalt up to divider roadway turn lane on white mill-good only ?is there yellow RPM's for the gore-roadway to be reconstructed by city future ALL INSPECTIONS ARE RESULTED ON MAIN SITE PERMIT-ALL INSPECTIONS ON THIS PHASE1 PERMIT ARE DUPLICATES AND REQUIRE RESULTING AS WE TRY TO CLOSE OUT 1 PHASE AT A TIME | |||
| HYDRANT - PAINT / FLOW/VALVE/ RPM | 12/04/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: 10/30/2025 - PREVIOUS INSPECTION NOTES 10/20/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9114 installing storm culvert at South(Emergency)entrance 3/6/2025 - PREVIOUS INSPECTION NOTES All hydrants now flow tested-Tyler all hydrats now GPS now painted safty orange bLUE rpm NOW INSTALLED ALL INSPECTIONS ARE RESULTED ON MAIN SITE PERMIT-ALL INSPECTIONS ON THIS PHASE1 PERMIT ARE DUPLICATES AND REQUIRE RESULTING AS WE TRY TO CLOSE OUT 1 PHASE AT A TIME | |||
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | 12/04/2025 | PARTIALLY APPROVED | KSANDOE |
| Note: 5,6, 13,14 unchecked 11/6/2025 - PREVIOUS INSPECTION NOTES | |||
| PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY | 12/03/2025 | APPROVED | DRAMIREZ |
| IRRIGATION AFFIDAVIT | 12/03/2025 | APPROVED | DRAMIREZ |
| LDSC- LANDSCAPE / IRRIGATION AS-BUILT | 12/03/2025 | APPROVED | DRAMIREZ |
Review History
| Department | Status | Date In | Date Out |
| BLD | CANCEL | 11/24/2025 | 11/24/2025 |
| ELEC | CANCEL | 11/24/2025 | 11/24/2025 |
| PLENG | COMPLETE | 11/24/2025 | 11/24/2025 |
| Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM | |||
| PLLA | CANCEL | 11/24/2025 | 11/24/2025 |
| UD1 | CANCEL | 11/24/2025 | 11/24/2025 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMINISTRATIVE- SITE DEVELOP | ¤125.00 | 12/03/2025 |
| INSPECTION - GENERAL | ¤360.00 | 12/03/2025 |
| SITE DEVELOPMENT ADMIN PLANNIN | ¤179.00 | 12/03/2025 |
| SITE INSPECTION | ¤399.00 | 12/03/2025 |
| SITE PLAN 29 | ¤29.00 | 12/03/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤1,092.00 |