I want to search for...
Permit #2025110856
Permit Details
Status: INSPECT
| Parcel Id: 07-11-31-7028-00420-0150 |
| CONDITIONED SPACE: 2147 sqft |
| GARAGE: 592 sqft |
| OPENED PORCH (WITH ROOF) : 155 sqft |
| Total Square Footage: 2894 sqft |
| Block: 00420 |
| Subdivision: 2302 - SECTION 28-PINE GROVE |
| Job Phone: 407-476-8195 |
| Location Address: 7 PORTIA LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/19/2025 |
| NOC: RECORDED |
| Applicant name: CARLETTE RENE WITTE |
| Owner: INB BFS LAND LLC |
|
Address 7380 WEST SAND LAKE ROAD ORLANDO, FL 32819 |
|
Address SUITE 600 ORLANDO, FL 32819 |
| Lot: 0150 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: Construction of New SFR |
| Type: CN |
Contractor
INNOVATIVE NATIONWIDE BUILDERS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3670 MAGUIRE BLVD #220 , |
CRC1330026 (Exp: 08/31/2026) | 855-694-6634 |
Sub Contractors
JASON LEE JAMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N WESTMONTE DR SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
CAC1820196 (Exp: 08/31/2026) | 407-404-4000 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
ANTHONY OKEITH FENNELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N. WESTMONTE DR, SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
EC13011194 (Exp: 08/31/2026) | 407-404-4000 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW- PRE-APRON (PRE-POUR) | 06/09/2026 | APPROVED | FSLADISH |
| Note: 6/9/26 PIPE INVERT IS GOOD AT TIME OF THIS INSPECTION. BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED. DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER AND VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. | |||
| ELECTRIC - EARLY POWER | 06/05/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 6/5/2026 10:26:11 AM *** 6/5/26: FPL emailed to release power. | |||
| SEWER TIE IN | 05/19/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/19/2026 12:14:53 PM *** Approved | |||
| DRYWALL NAILING | 05/08/2026 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/8/2026 11:53:42 AM *** 5/8/26: Please make correction immedietely. 1). Primary bathroom: water needs to be removed from shower stall before it possibly damages any drywall / insulation or tile backer. (FBC-R403.3.2) | |||
| INSULATION | 05/01/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/1/2026 12:58:21 PM *** Approved 4/29/2026 - PREVIOUS INSPECTION NOTES 4/29/26: 1). Firestop incomplete at back side of dryer exhaust. FSI marked on stud. FBC-R302.11 2). Firestop incomplete at back side of Breaker panel where wires penetrate top plate. FSI marked on stud. FBC-R302.11 3). Hallway entry from kitchen to bedrooms: Fireblock missing. FB written on stud. FBC-R302.11 | |||
| PEP TANK INSTALLATION REQUEST | 05/01/2026 | APPROVED | ISANDERSON |
| GRAVITY SEWER TEST | 04/30/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/30/2026 1:45:55 PM *** Approved Inspector Notes from Inspection 2060 *** NOTES ADDED BY RSIMS 3/2/2026 10:56:30 AM *** 3/2/26: Please make sure that hot and cold water lines remain seperated as required when backfilling trenches. 2/27/2026 - PREVIOUS INSPECTION NOTES 2/27/26: Deficiencies remain unresolved. 1). Hot and cold water lines need to be seperated by 6" min unless they are insulated or sleeved at crossover / bundle and/or where touching per manufacturer. FBC-P2906.10. Manufacturer's Instructions: Bundling Parallel runs of Uponor PEX may be bundled together, when approved by local code, given the following: • Bundle hot and cold water pipes separately at least 6"" apart (15.2cm), unless piping is insulated. • Support the bundle at the required on-center distance. • Use cable ties to group a bundle.* *Cable ties are not approved for supporting pipe. PEX Piping Systems Installation Guide | 45 2). Replace faulty gauge for proper testing. FBCR P2503.7 New inspection due to canceled inspection 2/20/2026 - PREVIOUS INSPECTION NOTES 2/20/26: 1). Hot and cold water lines need to be seperated by 6" min unless they are insulated or sleeved at crossover / bundle and/or where touching per manufacturer. P2906.10. 2). Replace faulty gauge for proper testing. FBCR P2503.7 | |||
| INSULATION | 04/29/2026 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/29/2026 11:02:54 AM *** 4/29/26: 1). Firestop incomplete at back side of dryer exhaust. FSI marked on stud. FBC-R302.11 2). Firestop incomplete at back side of Breaker panel where wires penetrate top plate. FSI marked on stud. FBC-R302.11 3). Hallway entry from kitchen to bedrooms: Fireblock missing. FB written on stud. FBC-R302.11 | |||
| ALL ROUGH | 04/27/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/27/2026 1:00:21 PM *** Approved 4/24/2026 - PREVIOUS INSPECTION NOTES 4/24/26: Previously listed item 1 remains unresolved. 1). 5ft head pressure is not holding. Please fill to top of pipe. FBC-P2503.5.1 Previously listed item 3: 3). Entry door is not installed on left side (Flex space). A window nailing inspection will be added if not installed by re-inspection. FBCR 609.1 / The top jamb of the door has excessive shim space and requires solid blocking to limit shim space to 1/4" max as required. FBCR 609.1. Also, screws in top jamb are not fully installed. FBC [A]107.4 4/14/2026 - PREVIOUS INSPECTION NOTES 4/14/26: 1). 5ft head pressure is not holding. Please fill to top of pipe. FBC-P2503.5.1 2). All bathroom exhaust fans are missing the plastic strap/clamp. FBC-M1502.4.2 / FBC-M1601.4.1 / R806.1 3). Entry door is not installed on left side (Flex space). A window nailing inspection will be added if not installed by re-inspection. FBCR 609.1 | |||
| ALL ROUGH | 04/24/2026 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 4/24/26: Previously listed item 1 remains unresolved. 1). 5ft head pressure is not holding. Please fill to top of pipe. FBC-P2503.5.1 Previously listed item 3: 3). Entry door is not installed on left side (Flex space). A window nailing inspection will be added if not installed by re-inspection. FBCR 609.1 / The top jamb of the door has excessive shim space and requires solid blocking to limit shim space to 1/4" max as required. FBCR 609.1. Also, screws in top jamb are not fully installed. FBC [A]107.4 4/14/2026 - PREVIOUS INSPECTION NOTES 4/14/26: 1). 5ft head pressure is not holding. Please fill to top of pipe. FBC-P2503.5.1 2). All bathroom exhaust fans are missing the plastic strap/clamp. FBC-M1502.4.2 / FBC-M1601.4.1 / R806.1 3). Entry door is not installed on left side (Flex space). A window nailing inspection will be added if not installed by re-inspection. FBCR 609.1 | |||
| LATH/BRICK/ WATER BARRIER | 04/24/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/24/2026 1:26:24 PM *** Approved | |||
| ALL ROUGH | 04/14/2026 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/14/2026 12:08:18 PM *** 4/14/26: 1). 5ft head pressure is not holding. Please fill to top of pipe. FBC-P2503.5.1 2). All bathroom exhaust fans are missing the plastic strap/clamp. FBC-M1502.4.2 / FBC-M1601.4.1 / R806.1 3). Entry door is not installed on left side (Flex space). A window nailing inspection will be added if not installed by re-inspection. FBCR 609.1 | |||
| ELECTRIC-TUG | 04/13/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/13/2026 12:27:04 PM *** 4/13/26: FPL emailed - Approved for TUG. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/08/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/8/2026 2:49:23 PM *** Approved 4/1/2026 - PREVIOUS INSPECTION NOTES 4/1/26: Roof Sheathing & Down Cell only approved. 1). Load bearing wall on right side of garage is missing ties/anchors as required. 2). 2-ply Truss T01 and T26 need to be connected as required on Truss plan. NOTE: FOUND TRUSS PACKET IN PERMIT BOX COMPLETELY DISCONNECTED AND OUT OF ORDER. Please keep Truss packet in order and connected to avoid delays and/or failed inspections. | |||
| ROOF VALLEY & METAL | 04/01/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/1/2026 11:19:20 AM *** Approved | |||
| WALL SHEATHING | 04/01/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/1/2026 11:18:51 AM *** Approved | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/01/2026 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/1/2026 11:25:04 AM *** 4/1/26: Roof Sheathing & Down Cell only approved. 1). Load bearing wall on right side of garage is missing ties/anchors as required. 2). 2-ply Truss T01 and T26 need to be connected as required on Truss plan. NOTE: FOUND TRUSS PACKET IN PERMIT BOX COMPLETELY DISCONNECTED AND OUT OF ORDER. Please keep Truss packet in order and connected to avoid delays and/or failed inspections. | |||
| ROOF SHEATHING | 03/27/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 3/27/2026 11:14:59 AM *** Approved | |||
| TIE BEAM / LINTEL | 03/18/2026 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 3/18/2026 11:33:22 AM *** 3/18/26: 1). Back right column: Dowel / down rods do not meet the minimum clearance (2" from face of block and/or 3/4: from inside of block) as required. (FBC-R606.3.4) Spray painted orange. | |||
| TIE BEAM / LINTEL | 03/18/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 3/18/2026 11:56:53 AM *** 3/18/26: Virtually approved via FaceTime video/audio phone app at @ 1155. 3/18/2026 - PREVIOUS INSPECTION NOTES 3/18/26: 1). Back right column: Dowel / down rods do not meet the minimum clearance (2" from face of block and/or 3/4: from inside of block) as required. (FBC-R606.3.4) Spray painted orange. | |||
| MONOLITHIC SLAB | 03/09/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 3/9/2026 2:59:14 PM *** | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/02/2026 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 3/2/2026 10:56:30 AM *** 3/2/26: Please make sure that hot and cold water lines remain seperated as required when backfilling trenches. 2/27/2026 - PREVIOUS INSPECTION NOTES 2/27/26: Deficiencies remain unresolved. 1). Hot and cold water lines need to be seperated by 6" min unless they are insulated or sleeved at crossover / bundle and/or where touching per manufacturer. FBC-P2906.10. Manufacturer's Instructions: Bundling Parallel runs of Uponor PEX may be bundled together, when approved by local code, given the following: • Bundle hot and cold water pipes separately at least 6"" apart (15.2cm), unless piping is insulated. • Support the bundle at the required on-center distance. • Use cable ties to group a bundle.* *Cable ties are not approved for supporting pipe. PEX Piping Systems Installation Guide | 45 2). Replace faulty gauge for proper testing. FBCR P2503.7 New inspection due to canceled inspection 2/20/2026 - PREVIOUS INSPECTION NOTES 2/20/26: 1). Hot and cold water lines need to be seperated by 6" min unless they are insulated or sleeved at crossover / bundle and/or where touching per manufacturer. P2906.10. 2). Replace faulty gauge for proper testing. FBCR P2503.7 | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 02/27/2026 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 2/27/2026 12:51:00 PM *** 2/27/26: Deficiencies remain unresolved. 1). Hot and cold water lines need to be seperated by 6" min unless they are insulated or sleeved at crossover / bundle and/or where touching per manufacturer. FBC-P2906.10. Manufacturer's Instructions: Bundling Parallel runs of Uponor PEX may be bundled together, when approved by local code, given the following: • Bundle hot and cold water pipes separately at least 6"" apart (15.2cm), unless piping is insulated. • Support the bundle at the required on-center distance. • Use cable ties to group a bundle.* *Cable ties are not approved for supporting pipe. PEX Piping Systems Installation Guide | 45" 2). Replace faulty gauge for proper testing. FBCR P2503.7 New inspection due to canceled inspection 2/20/2026 - PREVIOUS INSPECTION NOTES 2/20/26: 1). Hot and cold water lines need to be seperated by 6" min unless they are insulated or sleeved at crossover / bundle and/or where touching per manufacturer. P2906.10. 2). Replace faulty gauge for proper testing. FBCR P2503.7 | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 02/26/2026 | CANCELLED BY APPLICANT | WEB |
| Note: 2/20/2026 - PREVIOUS INSPECTION NOTES 2/20/26: 1). Hot and cold water lines need top be seperated by 6" min unless they are insulated or sleeved at crossover / bundle and/or where touching per manufacturer. P2906.10. 2). Replace faulty gauge for proper testing. FBCR P2503.7 | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 02/20/2026 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 2/20/2026 2:28:52 PM *** 2/20/26: 1). Hot and cold water lines need top be seperated by 6" min unless they are insulated or sleeved at crossover / bundle and/or where touching per manufacturer. P2906.10. 2). Replace faulty gauge for proper testing. FBCR P2503.7 | |||
| FORMBOARD SURVEY (OFFICE USE ONLY) | 02/18/2026 | APPROVED | RRICKS |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 02/18/2026 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 02/06/2026 | APPROVED | CBOWERMASTER |
| BLD - BUILDING FINAL | |||
| U-CROSS CONNECTION | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 02/18/2026 | 02/18/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/18/2026 | 02/18/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/18/2026 | 02/18/2026 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/10/2025 | 12/12/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/08/2025 | 12/08/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/08/2025 | 12/08/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| MECH | HOLD | 12/08/2025 | 12/10/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide updated state card | |||
| SWALE | COMPLETE | 12/01/2025 | 12/04/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| BLD | HOLD | 11/25/2025 | 12/03/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Provide geotechnical investigation report in accordance with FBCB Section 1803.2. Report to be conducted per Sections 1803.3 through 1803.5. Completed report shall comply with Section 1803.6. Report shall be signed and sealed by a Florida licensed professional engineer in accordance with F.S. 471.025 and Florida Administrative Code Sections 61G15-30.001 and 61G15-23.001 through .005. You can request a deferred submittal by providing a letter on company letterhead. | |||
| CUSVC | COMPLETE | 11/25/2025 | 12/08/2025 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 11/25/2025 | 12/03/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/25/2025 | 12/01/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 11/25/2025 | 11/26/2025 |
| LOCATE | COMPLETE | 11/25/2025 | 12/02/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 11/25/2025 | 11/26/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Square footage on energy calcs and state card do not match the house plans 2. Design location heatload needs to be Daytona Beach | |||
| SW1 | COMPLETE | 11/25/2025 | 12/01/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 11/25/2025 | 11/26/2025 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Must have a minimum of 8 foundation plantings along the front and 4 along each side wrapping front corners |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/05/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/05/2026 |
| FC IMPACT FEE EMS | ¤62.00 | 12/19/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 12/19/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 12/19/2025 |
| FIRE RES IMPACT FEE 10-25 | ¤942.00 | 12/19/2025 |
| PEP TANK INSTALL | ¤756.74 | 12/19/2025 |
| PARKS IMPACT FEE 10-25 | ¤3,164.00 | 12/19/2025 |
| RSI DRIVEWAY AFTER POUR | ¤16.25 | 12/19/2025 |
| RSE DRIVE PRE POUR INSPECTION | ¤32.50 | 12/19/2025 |
| RSI FIELD SURVEY INSPECTION | ¤48.75 | 12/19/2025 |
| RSI FORMBOARD REVIEW | ¤16.25 | 12/19/2025 |
| RSI PLAN REVIEW NEW | ¤48.75 | 12/19/2025 |
| RSI FNL SURVEY/GRADING CERT | ¤48.75 | 12/19/2025 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 12/19/2025 |
| SCHOOL BOARD IMPACT FEE RES | ¤5,450.00 | 12/19/2025 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,385.00 | 12/19/2025 |
| SURCHARGE FS 533.721 | ¤15.09 | 12/19/2025 |
| SURCHARGE - FS 468.631 | ¤22.64 | 12/19/2025 |
| SW ENG RES REVIEW 240 | ¤240.00 | 12/19/2025 |
| WATER METER W/ TAP | ¤2,326.93 | 12/19/2025 |
| TRANSP RES IMPACT FEE 10-25 | ¤8,094.19 | 12/19/2025 |
| SEWER CREDIT | (¤850.00) | 12/19/2025 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 12/19/2025 |
| WASTEWATER PERM REVIEW | ¤25.00 | 12/19/2025 |
| SEWER CAPITAL FACILITY | ¤4,415.00 | 12/19/2025 |
| WATER CAPITAL FACILITY FEE | ¤3,790.49 | 12/19/2025 |
| WATER PERMIT REVIEW | ¤25.00 | 12/19/2025 |
| WATER MAIN EXTENSION IMPACT | ¤917.27 | 12/19/2025 |
| SITE PLAN 30 | ¤30.00 | 12/19/2025 |
| WATER- TURN ON | ¤50.00 | 12/19/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 12/19/2025 |
| INSPECTION - RESIDENTIAL | ¤1,152.25 | 12/19/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤326.82 | 12/19/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤34,243.92 |