I want to search for...
Permit #2025120060
Permit Details
Status: INSPECT
| Parcel Id: 07-11-31-7058-00790-0040 |
| CONDITIONED SPACE: 2800 sqft |
| GARAGE: 1006 sqft |
| PATIO/DECK (NO ROOF) : 290 sqft |
| OPENED PORCH (WITH ROOF) : 136 sqft |
| Total Square Footage: 4232 sqft |
| Block: 00790 |
| Subdivision: 2215 - SECTION 58-SEMINOLE PARK |
| Job Phone: 904-888-6443 |
| Location Address: 8 SECOND PATH |
| Type: DU - DUPLEX |
| Issue Date: 01/21/2026 |
| NOC: RECORDED |
| Applicant name: AMIR BENTOV |
| Owner: ADBT 51 LLC |
|
Address 3225 MCLEOD DR LAS VEGAS, NV 89121 |
|
Address SUITE 100 LAS VEGAS, NV 89121 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤380,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
MAVEN HOMES LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2800 N 6TH ST UNIT 790 , |
CRC1333741 (Exp: 08/31/2026) | 904-667-4330 |
Sub Contractors
GLEN WILLIAM KEHLE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 353511 BUNNELL, FL 32110 |
CFC057241 (Exp: 08/31/2026) | (386) 447-4249 | (386) 437-8488 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
CAC043953 (Exp: 08/31/2026) | 877-906-1113 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW- PRE-APRON (PRE-POUR) | 06/05/2026 | APPROVED | FSLADISH |
| Note: 6/5/26 REQUIRED CORRECTIONS COMPLETED AT THE TIME OF THIS INSPECTION. PIPE INVERT IS GOOD AT TIME OF THIS INSPECTION. BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED. DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER AND VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. 5/27/2026 - PREVIOUS INSPECTION NOTES 5/27/26 NO CORRECTIONS HAVE BEEN MADE AT THE TIME OF THIS INSPECTION. SEE PHOTO FOR REFERENCE. 5/26/2026 - PREVIOUS INSPECTION NOTES 5/26/26 YOU HAVE WASHED IN AREAS THAT DO NOT MEET THE COPC MINIMUM STANDARDS. MITERED ENDS NEED TO BE 6" DEEP, MAXIMUM 6" WIDE AND 3" DUG OUT UNDER PIPE. DUE TO THE RAIN JUST ENDING IT MAY HAVE CAUSED THESE ISSUES SO I AM DISSAPPROVING THIS INSPECTION WITH NO FEE. PLEASE FEEL FREE TO RESUBMIT WHEN POURING AREA MEETS COPC MINIMUM STANDARDS. PICTURES FOR REFERENCE. _______________________________________________________________________________________________________________________________ 5/22/2026 - PREVIOUS INSPECTION NOTES 5/22/26 You are required to have a formboard at road edge and have a minimum of 6" of concrete pour depth in the driveway apron. You are required to have 1' flat on either side of the culvert pipe buried half way and sloped not filled in or a drop off. Photo for reference. | |||
| DRYWALL NAILING | 05/28/2026 | Approval - Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 05/27/2026 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 5/27/26 NO CORRECTIONS HAVE BEEN MADE AT THE TIME OF THIS INSPECTION. SEE PHOTO FOR REFERENCE. 5/26/2026 - PREVIOUS INSPECTION NOTES 5/26/26 YOU HAVE WASHED IN AREAS THAT DO NOT MEET THE COPC MINIMUM STANDARDS. MITERED ENDS NEED TO BE 6" DEEP, MAXIMUM 6" WIDE AND 3" DUG OUT UNDER PIPE. DUE TO THE RAIN JUST ENDING IT MAY HAVE CAUSED THESE ISSUES SO I AM DISSAPPROVING THIS INSPECTION WITH NO FEE. PLEASE FEEL FREE TO RESUBMIT WHEN POURING AREA MEETS COPC MINIMUM STANDARDS. PICTURES FOR REFERENCE. _______________________________________________________________________________________________________________________________ 5/22/2026 - PREVIOUS INSPECTION NOTES 5/22/26 You are required to have a formboard at road edge and have a minimum of 6" of concrete pour depth in the driveway apron. You are required to have 1' flat on either side of the culvert pipe buried half way and sloped not filled in or a drop off. Photo for reference. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/26/2026 | Disapproved - NO FEE | FSLADISH |
| Note: 5/26/26 YOU HAVE WASHED IN AREAS THAT DO NOT MEET THE COPC MINIMUM STANDARDS. MITERED ENDS NEED TO BE 6" DEEP, MAXIMUM 6" WIDE AND 3" DUG OUT UNDER PIPE. DUE TO THE RAIN JUST ENDING IT MAY HAVE CAUSED THESE ISSUES SO I AM DISSAPPROVING THIS INSPECTION WITH NO FEE. PLEASE FEEL FREE TO RESUBMIT WHEN POURING AREA MEETS COPC MINIMUM STANDARDS. PICTURES FOR REFERENCE. _______________________________________________________________________________________________________________________________ 5/22/2026 - PREVIOUS INSPECTION NOTES 5/22/26 You are required to have a formboard at road edge and have a minimum of 6" of concrete pour depth in the driveway apron. You are required to have 1' flat on either side of the culvert pipe buried half way and sloped not filled in or a drop off. Photo for reference. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/22/2026 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 5/22/26 You are required to have a formboard at road edge and have a minimum of 6" of concrete pour depth in the driveway apron. You are required to have 1' flat on either side of the culvert pipe buried half way and sloped not filled in or a drop off. Photo for reference. | |||
| SEWER TIE IN | 05/12/2026 | APPROVED | CVANSTRAHLEN |
| GRAVITY SEWER TEST | 04/30/2026 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 04/17/2026 | Approval - Private Provider | PPROVIDER |
| INSULATION | 03/27/2026 | ||
| ALL ROUGH | 03/24/2026 | Approval - Private Provider | PPROVIDER |
| Note: 3/19/2026 3:18:40 PM- PREVIOUS INSPECTION NOTES | |||
| ELECTRIC-TUG | 03/24/2026 | Approval - Private Provider | PPROVIDER |
| Note: 3/19/2026 3:19:14 PM- PREVIOUS INSPECTION NOTES | |||
| ALL ROUGH | 03/19/2026 | Disapproved- Private Provider | PPROVIDER |
| ELECTRIC-TUG | 03/19/2026 | Disapproved- Private Provider | PPROVIDER |
| FIREWALL FINAL | 03/18/2026 | Approval - Private Provider | PPROVIDER |
| FIREWALL DRYWALL NAILING | 03/13/2026 | Approval - Private Provider | PPROVIDER |
| FIREWALL FRAMING | 03/10/2026 | Approval - Private Provider | PPROVIDER |
| FIREWALL DRYWALL NAILING | 03/10/2026 | CANCELLED BY APPLICANT | WEB |
| WALL SHEATHING | 03/10/2026 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/10/2026 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 03/10/2026 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 02/27/2026 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 02/17/2026 | Approval - Private Provider | PPROVIDER |
| Note: 2/13/2026 1:44:21 PM- PREVIOUS INSPECTION NOTES | |||
| MONOLITHIC SLAB | 02/13/2026 | Disapproved- Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/11/2026 | Approval - Private Provider | PPROVIDER |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 02/10/2026 | APPROVED | RRICKS |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 02/03/2026 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 01/23/2026 | APPROVED | CBOWERMASTER |
| U-CROSS CONNECTION | |||
| BLD - BUILDING FINAL | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | |||
| ELECTRIC - EARLY POWER |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 02/19/2026 | 02/19/2026 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/19/2026 | 02/19/2026 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/10/2026 | 02/10/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/10/2026 | 02/10/2026 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/03/2026 | 02/03/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/11/2025 | 12/12/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/02/2025 | 12/09/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 12/02/2025 | 12/10/2025 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 12/02/2025 | 12/09/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/02/2025 | 12/02/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 12/02/2025 | 12/03/2025 |
| LOCATE | COMPLETE | 12/02/2025 | 12/08/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 12/02/2025 | 12/03/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Plans show 3/4 inch foam board R5 on walls. Energy calcs say R7. Revise | |||
| SW1 | COMPLETE | 12/02/2025 | 12/08/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM COPC Note: There are no improved lots to the right side of this home at this point. | |||
| ZON | COMPLETE | 12/02/2025 | 12/04/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 12/02/2025 | 12/09/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER- TURN ON | ¤100.00 | 01/21/2026 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/21/2026 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 01/21/2026 |
| PLAN REVIEW - RESIDENTIAL | ¤450.84 | 01/21/2026 |
| FC IMPACT FEE EMS | ¤124.00 | 01/21/2026 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤436.00 | 01/21/2026 |
| FC IMPACT FEE LIBRARY | ¤536.00 | 01/21/2026 |
| FIRE RES IMPACT FEE 10-25 | ¤1,884.00 | 01/21/2026 |
| PARKS IMPACT FEE 10-25 | ¤6,328.00 | 01/21/2026 |
| RSI DRIVEWAY AFTER POUR | ¤16.25 | 01/21/2026 |
| RSE DRIVE PRE POUR INSPECTION | ¤32.50 | 01/21/2026 |
| RSI FIELD SURVEY INSPECTION | ¤48.75 | 01/21/2026 |
| RSI FORMBOARD REVIEW | ¤16.25 | 01/21/2026 |
| RSI PLAN REVIEW NEW | ¤48.75 | 01/21/2026 |
| RSI FNL SURVEY/GRADING CERT | ¤48.75 | 01/21/2026 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 01/21/2026 |
| SCHOOL BOARD IMPACT FEE RES | ¤10,900.00 | 01/21/2026 |
| WASTEWATER MAIN EXTENSION IMPA | ¤4,770.00 | 01/21/2026 |
| SURCHARGE FS 533.721 | ¤7.06 | 01/21/2026 |
| SURCHARGE - FS 468.631 | ¤10.59 | 01/21/2026 |
| SW ENG RES REVIEW 240 | ¤240.00 | 01/21/2026 |
| WATER METER W/ TAP | ¤4,653.86 | 01/21/2026 |
| TRANS DUPLEX 10-25 | ¤10,707.20 | 01/21/2026 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 01/21/2026 |
| WASTEWATER PERM REVIEW | ¤100.00 | 01/21/2026 |
| SEWER CAPITAL FACILITY | ¤8,830.00 | 01/21/2026 |
| WATER CAPITAL FACILITY FEE | ¤7,580.98 | 01/21/2026 |
| WATER PERMIT INSPECTION | ¤80.00 | 01/21/2026 |
| WATER MAIN EXTENSION IMPACT | ¤1,834.54 | 01/21/2026 |
| SITE PLAN 30 | ¤30.00 | 01/21/2026 |
| RSI REINSPECTION 1 | ¤35.00 | |
| RSI REINSPECTION 1 | ¤35.00 | |
| Fees | Total Due: ¤70.00 | Total Paid: ¤60,165.57 |