I want to search for...

Permit #2025120180

Permit Details

Status: INSPECT

Parcel Id: 05-12-31-2755-00000-0240
CONDITIONED SPACE: 2164 sqft
GARAGE: 588 sqft
OPENED PORCH (WITH ROOF) : 288 sqft
Total Square Footage: 3040 sqft
Subdivision: 2313 - THE GABLES SUBDIVISION AT TOWN CENTER
Job Phone: (386)756-0439
Location Address: 247 HAWTHORN AVE
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/14/2026
NOC: RECORDED
Applicant name: JAMES MICHAEL MATHER
Owner: PAYTAS HOMES INC

Address

PO BOX 290490

PORT ORANGE, FL 32127

Lot: 24
Contracted Stated Job Value: ¤500,000.00
Job Description: Single Family Residence
Type: CN

Contractor

PAYTAS HOMES INC
Status Location Address State License Number Phone
ACTIVE

PO BOX 290490

PORT ORANGE, FL 32127

CBC1261873 (Exp: 08/31/2026) (386)756-0439

Sub Contractors

JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
GERALD EDWARD MASTERS JR
Status Location Address State License Number Phone
ACTIVE

505 HERBERT STREET

PORT ORANGE, FL 32129

EC13003217 (Exp: 08/31/2026) (386)304-2600
BRANDON LEONARD LOSIK
Status Location Address State License Number Phone
ACTIVE

4680 LAKE INDUSTRIAL BLVD

TAVARES, FL 32778

CCC1335106 (Exp: 08/31/2026) 407-604-2099
BRENT JAMES STURGELL
Status Location Address State License Number Phone
ACTIVE

651 CARSWELL AVE

HOLLY HILL , FL 32117

CAC1822599 (Exp: 08/31/2026) 386-252-1878

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/04/2026 Approval - Private Provider PPROVIDER
U-CROSS CONNECTION 06/01/2026 APPROVED - AS NOTED BHAINES
Note: No CC, IRR with reclaim
ROW - FINAL APRON (AFTER POUR) 06/01/2026 Disapproved - NO FEE FSLADISH
Note: 6/1/26 YOU ARE REQUIRED TO UPLOAD A LOT GRADING AND DRAINAGE CHECLIST FOR REVIEW AND APPROVAL BEFORE ANY INSPECTIONS CAN BE COMPLETED. A FINAL SURVEY MUST BE ATTATCHED IN THE SAME FILE. _____________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 ** 04/21/26 READY TO SET PAVERS ** ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ___________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9271 4/16/26 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS
ROW - FINAL INSPECTION 06/01/2026 Disapproved - NO FEE FSLADISH
Note: 6/1/26 YOU ARE REQUIRED TO UPLOAD A LOT GRADING AND DRAINAGE CHECLIST FOR REVIEW AND APPROVAL BEFORE ANY INSPECTIONS CAN BE COMPLETED. A FINAL SURVEY MUST BE ATTATCHED IN THE SAME FILE. ________________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 ** 04/21/26 READY TO SET PAVERS ** ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ___________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9271 4/16/26 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS
U -UTILITY RESIDENTIAL FINAL 06/01/2026 FINAL APPROVED BHAINES
ELECTRIC - EARLY POWER 04/30/2026 Approval - Private Provider PPROVIDER
ROW- PRE-APRON (PRE-POUR) 04/21/2026 APPROVED - AS NOTED EMADISON
Note: ** 04/21/26 READY TO SET PAVERS ** ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ___________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9271 4/16/26 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS
ROW- PAVER RESTRAINTS 04/16/2026 APPROVED - AS NOTED FSLADISH
Note: 4/16/26 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS
ROW- PRE-APRON (PRE-POUR) 04/16/2026 PARTIALLY APPROVED FSLADISH
Note: 4/16/26 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS
SEWER TIE IN 04/14/2026 APPROVED RSIMS
Note: 4/6/2026 - PREVIOUS INSPECTION NOTES 4/6/26: 1). The sewer connection is not visible due to dirt cave in. Please remove dirt from the sewer tie in area. FBC-P2503.4
GRAVITY SEWER TEST 04/06/2026 Approval - Private Provider PPROVIDER
SEWER TIE IN 04/06/2026 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 4/6/2026 8:38:41 AM *** 4/6/26: 1). The sewer connection is not visible due to dirt cave in. Please remove dirt from the sewer tie in area. FBC-P2503.4
LATH/BRICK/ WATER BARRIER 03/18/2026 Approval - Private Provider PPROVIDER
DRYWALL NAILING 03/16/2026 Approval - Private Provider PPROVIDER
INSULATION 03/12/2026 Approval - Private Provider PPROVIDER
ALL ROUGH 03/10/2026 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 02/26/2026 Approval - Private Provider PPROVIDER
WALL SHEATHING 02/19/2026 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/19/2026 Approval - Private Provider PPROVIDER
ELECTRIC-TUG 02/10/2026 Approval - Private Provider PPROVIDER
TIE BEAM / LINTEL 02/06/2026 Approval - Private Provider PPROVIDER
MONOLITHIC SLAB 01/28/2026 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 01/27/2026 Approval - Private Provider PPROVIDER
FORMBOARD SURVEY (OFFICE USE ONLY) 01/26/2026 APPROVED RRICKS
WATER METER INSTALLATION REQUEST 01/21/2026 APPROVED CBOWERMASTER
ROW - FINAL INSPECTION
Note: 6/1/2026 - PREVIOUS INSPECTION NOTES 6/1/26 YOU ARE REQUIRED TO UPLOAD A LOT GRADING AND DRAINAGE CHECLIST FOR REVIEW AND APPROVAL BEFORE ANY INSPECTIONS CAN BE COMPLETED. A FINAL SURVEY MUST BE ATTATCHED IN THE SAME FILE. ________________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 ** 04/21/26 READY TO SET PAVERS ** ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ___________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9271 4/16/26 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS
ROW - FINAL APRON (AFTER POUR)
Note: 6/1/2026 - PREVIOUS INSPECTION NOTES 6/1/26 YOU ARE REQUIRED TO UPLOAD A LOT GRADING AND DRAINAGE CHECLIST FOR REVIEW AND APPROVAL BEFORE ANY INSPECTIONS CAN BE COMPLETED. A FINAL SURVEY MUST BE ATTATCHED IN THE SAME FILE. _____________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 ** 04/21/26 READY TO SET PAVERS ** ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ___________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9271 4/16/26 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS
ROW- FINAL SURVEY/GRADING CERTIFICATION

Review History

Department Status Date In Date Out
BLD COMPLETE 02/17/2026 02/23/2026
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SW1 COMPLETE 01/22/2026 01/26/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 01/22/2026 01/22/2026
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ZON COMPLETE 01/09/2026 01/09/2026
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ZON HOLD 01/09/2026 01/09/2026
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Gaage area is still bigger that the 30' depth allowed. plan states 30'.4" Please adjust plans accordingly
BADMIN INFORMATION 01/06/2026 01/06/2026
Note: Marked INFORMATION By: JAZMIN ROSARIO - - JROSARIO@PALMCOASTGOV.COM PLANS MISSING PRIVATE PROVIDER STAMP
ENGIN1 COMPLETE 12/18/2025 12/19/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON HOLD 12/18/2025 12/18/2025
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM wall needs to go all the way up and label the area being seperated
BADMIN COMPLETE 12/18/2025 01/06/2026
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
ZON COMPLETE 12/16/2025 12/16/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
URB COMPLETE 12/11/2025 12/11/2025
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM
ZON HOLD 12/09/2025 12/09/2025
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM please us the new forms that i will email for the ROW as the signers have changes for our department.
BADMIN HOLD 12/05/2025 12/05/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Design location on State Card needs to be Daytona Beach or St. Augustine
CUSVC COMPLETE 12/04/2025 12/16/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/04/2025 12/05/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
LOCATE COMPLETE 12/04/2025 12/11/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
SW1 COMPLETE 12/04/2025 12/11/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON HOLD 12/04/2025 12/08/2025
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Please complete a Right Of Way agreementn form. FLoor plan: Garage can not exceed the 30' depth adjust plans accordingly.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 06/03/2026
PLAN REVIEW - REVISION ¤32.50 06/03/2026
CONTRACTOR CHANGE ¤20.00 06/03/2026
FC IMPACT FEE EMS ¤62.00 01/14/2026
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 01/14/2026
FC IMPACT FEE LIBRARY ¤268.00 01/14/2026
FIRE RES IMPACT FEE 10-25 ¤942.00 01/14/2026
RECORDING FEE REIMBURSE DOC ¤8.50 01/14/2026
RECORDING FEE REIMBURSE DOC ¤44.00 01/14/2026
WATER METER W/OUT TAP ¤965.03 01/14/2026
PARKS IMPACT FEE 10-25 ¤3,164.00 01/14/2026
RECLAIM WATER PERMIT INSPECTIO ¤40.00 01/14/2026
WATER-METER ¤874.47 01/14/2026
WATER- TURN ON ¤50.00 01/14/2026
ADMINISTRATIVE RESIDENTIAL ¤30.00 01/14/2026
ADMINISTRATIVE - RESID PP ¤225.00 01/14/2026
RSI DRIVEWAY AFTER POUR ¤16.25 01/14/2026
RSE DRIVE PRE POUR INSPECTION ¤32.50 01/14/2026
RSI FIELD SURVEY INSPECTION ¤48.75 01/14/2026
RSI FORMBOARD REVIEW ¤16.25 01/14/2026
RSI PLAN REVIEW NEW ¤48.75 01/14/2026
RSI FNL SURVEY/GRADING CERT ¤48.75 01/14/2026
RSI ROW FINAL INSPECTION ¤16.25 01/14/2026
SCHOOL BOARD IMPACT FEE RES ¤5,450.00 01/14/2026
SURCHARGE FS 533.721 ¤2.55 01/14/2026
SURCHARGE - FS 468.631 ¤3.83 01/14/2026
TRANSP RES IMPACT FEE 10-25 ¤8,158.28 01/14/2026
WASTEWATER PERM INSPECTION ¤80.00 01/14/2026
WASTEWATER PERM REVIEW ¤25.00 01/14/2026
WATER PERMIT REVIEW ¤25.00 01/14/2026
SITE PLAN 30 ¤30.00 01/14/2026
Fees Total Due: ¤0.00 Total Paid: ¤20,985.66