Permit #2025120189

Permit Details

Status: COED

Parcel Id: 07-11-31-7065-00220-0070
GARAGE: 424 sqft
CONDITIONED SPACE: 1552 sqft
OPENED PORCH (WITH ROOF) : 93 sqft
Total Square Footage: 2069 sqft
Block: 00220
Subdivision: 2169 - SECTION 65-KANKAKEE RUN
Job Phone: 321-610-5217
Location Address: 32 KALAMAZOO TRL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 02/05/2026
NOC: RECORDED
Applicant name: RICHARD ANDREW FADIL
Owner: HOLIDAY BUILDERS INC

Address

2293 WEST EAU GALLIE BOULEVARD

MELBOURNE, FL 32935

Lot: 0070
Contracted Stated Job Value: ¤245,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

HOLIDAY BUILDERS INC
Status Location Address State License Number Phone
ACTIVE

2293 W EAU GALLIE BLVD

MELBOURNE, FL 32935

CGC058770 (Exp: 08/31/2026) 407-745-3797

Sub Contractors

MICHAEL FRANK MORELLO
Status Location Address State License Number Phone Fax
ACTIVE

2 HARGROVE GRADE

PALM COAST, FL 32164

CAC1819466 (Exp: 08/31/2026) 386-445-5023 386-446-4614
CHAD DAVID GRESSANI
Status Location Address State License Number Phone Fax
ACTIVE

2640 BROOKSHIRE CIRCLE

MELBOURNE, FL 32904

CCC1327235 (Exp: 08/31/2026) 321-288-6415 321-729-8997
PAUL ERIC FORSTER
Status Location Address State License Number Phone
ACTIVE

6114 GOODMAN RD

JACKSONVILLE, FL 32244

CFC1429261 (Exp: 08/31/2026) 904-647-1820
VERNON JACK SMITH III
Status Location Address State License Number Phone Fax
ACTIVE

224 KIRKLAND ROAD

NEW SMYRNA BEACH, FL 32169

EC13004432 (Exp: 08/31/2026) 386-409-3616 386-409-3616

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 05/11/2026 FINAL APPROVED KSANDOE
Note: 5/8/2026 - PREVIOUS INSPECTION NOTES 5/8/26: 1). Master bathroom toilet needs to be sealed at the floor/base. FBC-P2705.1(3) 2). Interior dryer exhaust needs to be capped/plugged or taped off. FBC-M1502.4.7 3). Garage attic access door needs screws removed from the framing to allow access drywall to sit flush with trim/ceiling. FBC-R302.11
BLD - BUILDING FINAL 05/08/2026 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 5/8/2026 1:24:27 PM *** 5/8/26: 1). Master bathroom toilet needs to be sealed at the floor/base. FBC-P2705.1(3) 2). Interior dryer exhaust needs to be capped/plugged or taped off. FBC-M1502.4.7 3). Garage attic access door needs screws removed from the framing to allow access drywall to sit flush with trim/ceiling. FBC-R302.11
U-CROSS CONNECTION 05/08/2026 APPROVED - AS NOTED BHAINES
Note: No CC, No IRR
ROW - FINAL APRON (AFTER POUR) 05/08/2026 APPROVED FSLADISH
Note: 5/8/26 . AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW - FINAL INSPECTION 05/08/2026 Disapproved -FEE REQUIRED FSLADISH
Note: 5/8/26 YOU WILL NEED TO REPAIR TO GRADE ON THE RIGHT SIDE WHERE A MACHINE HAS LEFT RUTS IN THE COPC SWALE. FROM EDGE OF ROAD TO TOP OF SWALE BANK NEEDS TO BE CORRECTED TO CORRECT FLOWABLE GRADE. PICTURE FOR REFERENCE. STORMWATER FINAL INSPECTION Sec 300.03 F4-A / V-22 Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage
ROW - FINAL INSPECTION 05/08/2026 APPROVED - AS NOTED PBUCKLEY
Note: 5/8/2026 - PREVIOUS INSPECTION NOTES 5/8/26 YOU WILL NEED TO REPAIR TO GRADE ON THE RIGHT SIDE WHERE A MACHINE HAS LEFT RUTS IN THE COPC SWALE. FROM EDGE OF ROAD TO TOP OF SWALE BANK NEEDS TO BE CORRECTED TO CORRECT FLOWABLE GRADE. PICTURE FOR REFERENCE. STORMWATER FINAL INSPECTION Sec 300.03 F4-A / V-22 Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage 05/08/26 Reinspection at the request of the contractor. I went to the property and observed very minor equipment damage to the turf but no effect on the intended function of the swale.
U -UTILITY RESIDENTIAL FINAL 05/08/2026 FINAL APPROVED BHAINES
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/07/2026 APPROVED FSLADISH
Note: 5/7/26 BASED ON THE ENGINEER SIGNED AND SEALED LGADC MEETING THE COPC MINIMUM REQUIREMENTS AT THE TIME OF THIS INSPECTION, I AM APPROVING THIS DOCUMENT. Effective 3/25/26, the ROW Field Survey requirement is no longer in effect for Final Lot Grading and Drainage Certification for new construction on subdivision and infill lots. All Final Lot Grading and Drainage Certificates for these projects will now be reviewed and approved only in the office. Field verification for the ROW-FIELD SURVEY will no longer be required as part of the standard approval process for these permit types.
ELECTRIC - EARLY POWER 04/17/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 4/17/2026 2:34:10 PM *** 4/17/26: FPL emailed to release power.
ROW- PRE-APRON (PRE-POUR) 04/16/2026 APPROVED FSLADISH
Note: 4/16/26 PIPE INVERT IS GOOD AT TIME OF THIS INSPECTION. BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED. DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER AND VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. 4/15/2026 - PREVIOUS INSPECTION NOTES 4/15/26 MICHAEL CM CALLED AND ASKED TO PLEASE CANCEL THIS PREPOUR INSPECTION FOR TODAY.
ROW- PRE-APRON (PRE-POUR) 04/15/2026 CANCELLED BY APPLICANT FSLADISH
Note: 4/15/26 MICHAEL CM CALLED AND ASKED TO PLEASE CANCEL THIS PREPOUR INSPECTION FOR TODAY.
GRAVITY SEWER TEST 04/06/2026 APPROVED KSANDOE
SEWER TIE IN 04/06/2026 APPROVED KSANDOE
PEP TANK INSTALLATION REQUEST 03/23/2026 APPROVED ISANDERSON
DRYWALL NAILING 03/23/2026 APPROVED KSANDOE
INSULATION 03/19/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 3/19/2026 1:28:41 PM *** Approved
LATH/BRICK/ WATER BARRIER 03/17/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 3/17/2026 9:52:57 AM *** Approved 3/16/2026 - PREVIOUS INSPECTION NOTES 3/16/26: Cancelled by Applicant via phone call at @ 1132.
ALL ROUGH 03/17/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 3/17/2026 9:52:35 AM *** Approved
ROOF VALLEY & METAL 03/16/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 3/16/2026 11:48:30 AM *** Approved 3/13/2026 - PREVIOUS INSPECTION NOTES 3/13/26: Valley metal and drip edge in progress upon arrival. 3/12/2026 - PREVIOUS INSPECTION NOTES 3/12/26: 1). No drip edge installed.
LATH/BRICK/ WATER BARRIER 03/16/2026 CANCELLED BY APPLICANT RSIMS
Note: *** NOTES ADDED BY RSIMS 3/16/2026 11:49:34 AM *** 3/16/26: Cancelled by Applicant via phone call at @ 1132.
ROOF VALLEY & METAL 03/13/2026 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 3/13/2026 4:02:07 PM *** Not fully ready. 3/13/26: Valley metal and drip edge in progress upon arrival. 3/12/2026 - PREVIOUS INSPECTION NOTES 3/12/26: 1). No drip edge installed.
ROOF VALLEY & METAL 03/12/2026 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 3/12/2026 3:05:50 PM *** 3/12/26: 1). No drip edge installed.
WALL SHEATHING 03/10/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 3/10/2026 9:50:25 AM ***
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/10/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 3/10/2026 10:03:36 AM ***
TIE BEAM / LINTEL 03/02/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 3/2/2026 2:31:31 PM ***
MONOLITHIC SLAB 02/23/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 2/23/2026 3:33:20 PM ***
PLUMBING 1ST ROUGH UNDERGROUND 02/19/2026 APPROVED MKRASKI
FORMBOARD SURVEY (OFFICE USE ONLY) 02/17/2026 APPROVED AMOBLEY
WATER METER INSTALLATION REQUEST 02/10/2026 APPROVED ISANDERSON
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 02/09/2026 APPROVED PKNAPIK

Review History

Department Status Date In Date Out
SW1 COMPLETE 02/17/2026 02/17/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 02/17/2026 02/17/2026
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 02/09/2026 02/09/2026
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SWALE COMPLETE 12/05/2025 12/30/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
BLD COMPLETE 12/04/2025 12/11/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 12/04/2025 12/11/2025
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC COMPLETE 12/04/2025 12/11/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/04/2025 12/05/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 12/04/2025 12/05/2025
LOCATE COMPLETE 12/04/2025 12/11/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 12/04/2025 12/05/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 12/04/2025 12/11/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 12/04/2025 12/05/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMINISTRATIVE RESIDENTIAL ¤30.00 02/05/2026
INSPECTION - RESIDENTIAL ¤830.50 02/05/2026
PLAN REVIEW - RESIDENTIAL ¤235.56 02/05/2026
FC IMPACT FEE EMS ¤62.00 02/05/2026
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 02/05/2026
FC IMPACT FEE LIBRARY ¤268.00 02/05/2026
FIRE RES IMPACT FEE 10-25 ¤942.00 02/05/2026
PARKS IMPACT FEE 10-25 ¤3,164.00 02/05/2026
RSI DRIVEWAY AFTER POUR ¤16.25 02/05/2026
RSE DRIVE PRE POUR INSPECTION ¤32.50 02/05/2026
RSI FIELD SURVEY INSPECTION ¤48.75 02/05/2026
RSI FORMBOARD REVIEW ¤16.25 02/05/2026
RSI PLAN REVIEW NEW ¤48.75 02/05/2026
RSI FNL SURVEY/GRADING CERT ¤48.75 02/05/2026
RSI ROW FINAL INSPECTION ¤16.25 02/05/2026
SCHOOL BOARD IMPACT FEE RES ¤5,450.00 02/05/2026
SURCHARGE FS 533.721 ¤10.96 02/05/2026
SURCHARGE - FS 468.631 ¤16.44 02/05/2026
SW ENG RES REVIEW 240 ¤240.00 02/05/2026
TRANSP RES IMPACT FEE 10-25 ¤5,851.04 02/05/2026
WASTEWATER PERM INSPECTION ¤80.00 02/05/2026
WASTEWATER PERM REVIEW ¤25.00 02/05/2026
WATER PERMIT REVIEW ¤25.00 02/05/2026
SITE PLAN 30 ¤30.00 02/05/2026
Fees Total Due: ¤0.00 Total Paid: ¤17,706.00