I want to search for...

Permit #2025120207

Permit Details

Status: COED

Parcel Id: 03-12-31-1126-00000-2510
CONDITIONED SPACE: 2746 sqft
GARAGE: 600 sqft
OPENED PORCH (WITH ROOF) : 155 sqft
OPENED PORCH (WITH ROOF) : 384 sqft
Total Square Footage: 3885 sqft
Subdivision: 2344 - COLBERT LANDINGS PH 2
Job Phone: 813-917-1689
Location Address: 106 ARMOYAN DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/22/2025
NOC: RECORDED
Applicant name: SCOTT EVAN KEUNING
Owner: TAYLOR MORRISON OF FLORIDA INC

Address

1275 W GRANADA BLVD

ORMOND BEACH, FL 32174

Address

SUITE 3B

ORMOND BEACH, FL 32174

Lot: 251
Contracted Stated Job Value: ¤202,614.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

TAYLOR MORRISON OF FLORIDA INC
Status Location Address State License Number Phone
ACTIVE

7785 BAY MEADOWS WAY, SUITE 105

JACKSONVILLE, FL 32256

CBC1265083 (Exp: 08/31/2026) 813-917-1689

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PKWY

SANFORD, FL 32771

CAC043953 (Exp: 08/31/2026) 877-906-1113
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
BENJAMIN MICHAEL RAY
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

6310 MABLETON PKWY

JACKSONVILLE, FL 32216

SUITE 1000

MABLETON, GA 30126

CFC1428415 (Exp: 08/31/2026) 904-861-5421 904-861-5426
CHASE RANDOLPH MASSEY
Status Location Address State License Number Phone
ACTIVE

10048 103RD ST

JACKSONVILLE, FL 32210

CCC1332486 (Exp: 08/31/2026) 904-248-1133

Inspection History

Type Request Date Result Inspector
ROW - FINAL INSPECTION 05/04/2026 APPROVED - AS NOTED FSLADISH
Note: 5/4/26 AS I HAVE STATED PREVIOUSLY AND WE HAVE DISCUSSED, YOU ARE REQUIRED TO INSTALL SILT FENCE ON PROPERTY LINE OR WILL NEED TO SOD BARE EARTH AREA, I AM GOING TO PASS THIS FINAL INSPECTION AS NOTED AS A ONE TIME COURTESY, PLEASE MAKE CORRECTION. FUTURE FINAL INSPECTIONS WILL REQUIRE SILT FENCE TO BE INSTALLED ON PROPERTY LINE FOR FINAL PASSAGE. ________________________________________________________________________________________________________________________________ 4/28/2026 - PREVIOUS INSPECTION NOTES 4/28/26 YOU ARE REQUIRED TO INSTALL A SILT FENCE ON THE LEFT SIDE PROPERTY LINE BEFORE ROW FINAL.. PHOTO FOR REFERENCE.
BLD - BUILDING FINAL 04/30/2026 APPROVED CVANSTRAHLEN
Note: 4/28/2026 - PREVIOUS INSPECTION NOTES cancelled by text
U -UTILITY RESIDENTIAL FINAL 04/28/2026 APPROVED BVEIGA
BLD - BUILDING FINAL 04/28/2026 CANCELLED BY APPLICANT CVANSTRAHLEN
Note: cancelled by text
ROW - FINAL INSPECTION 04/28/2026 Disapproved - NO FEE FSLADISH
Note: *** NOTES ADDED BY FSLADISH 4/28/2026 9:17:47 AM *** PLEASE REMOVE DUMPSTERS AND MAKE SURE ROAD IS CLEANED OFF IN AREA WHERE THEY ARE LOCATED. 4/28/26 YOU ARE REQUIRED TO INSTALL A SILT FENCE ON THE LEFT SIDE PROPERTY LINE BEFORE ROW FINAL.. PHOTO FOR REFERENCE.
U-CROSS CONNECTION 04/28/2026 APPROVED - AS NOTED BVEIGA
Note: NO/CC, IRR POTTABLE
ROW - FINAL APRON (AFTER POUR) 04/28/2026 APPROVED FSLADISH
Note: 4/28/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW- FINAL SURVEY/GRADING CERTIFICATION 04/27/2026 APPROVED FSLADISH
Note: 4/27/26 BASED ON THE ENGINEER SIGNED AND SEALED LGADC MEETING THE COPC MINIMUM REQUIREMENTS AT THE TIME OF THIS INSPECTION, I AM APPROVING THIS DOCUMENT. Effective 3/25/26, the ROW Field Survey requirement is no longer in effect for Final Lot Grading and Drainage Certification for new construction on subdivision and infill lots. All Final Lot Grading and Drainage Certificates for these projects will now be reviewed and approved only in the office. Field verification for the ROW-FIELD SURVEY will no longer be required as part of the standard approval process for these permit types.
ELECTRIC - EARLY POWER 03/30/2026 APPROVED CVANSTRAHLEN
Note: Inspector Notes from Inspection 2200 2-5-26 1. Emailed FPL at 10:21.
ROW- PRE-APRON (PRE-POUR) 03/11/2026 APPROVED FSLADISH
Note: 3/11/26 AT THE TIME OF THE INSPECTION PREPOUR AREA IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD REMOVE ALL WATER AND CHECK COMPACTION BEFORE POURING CONCRETE. 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED IS REQUIRED. PLEASE REVIEW CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. NO EXPANSION JOINTS ALLOWED,
GRAVITY SEWER TEST 03/05/2026 APPROVED - AS NOTED MCONTRYMAN
Note: 3/5/26 Inspection was looked at by Chris Van-Strahlen on 3/4/26 and he approved at that time
SEWER TIE IN 03/05/2026 APPROVED - AS NOTED MCONTRYMAN
Note: 3/5/26 Inspection was looked at by Chris Van-Strahlen on 3/4/26 and he approved at that time
DRYWALL NAILING 02/23/2026 APPROVED BTAYLOR
INSULATION 02/19/2026 APPROVED BTAYLOR
LATH/BRICK/ WATER BARRIER 02/19/2026 APPROVED BTAYLOR
ALL ROUGH 02/17/2026 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2460 2-4-26 1. Need to add H2.5's to walls in dormer above garage. 2. Gable wall needs to add screws to brackets at diagonal braces. 2/3/2026 - PREVIOUS INSPECTION NOTES 2-3-26 1. Engineering good. 2. No plans in box. Inspector Notes from Inspection 2450 1-28-26 1. Need to nail plywood around rear slider. 2. Need to finish nailing plywood on front two gables.
ELECTRIC-TUG 02/05/2026 APPROVED - AS NOTED BTAYLOR
Note: 2-5-26 1. Emailed FPL at 10:21.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/04/2026 APPROVED - AS NOTED BTAYLOR
Note: 2-4-26 1. Need to add H2.5's to walls in dormer above garage. 2. Gable wall needs to add screws to brackets at diagonal braces. 2/3/2026 - PREVIOUS INSPECTION NOTES 2-3-26 1. Engineering good. 2. No plans in box. Inspector Notes from Inspection 2450 1-28-26 1. Need to nail plywood around rear slider. 2. Need to finish nailing plywood on front two gables.
ROOF VALLEY & METAL 02/04/2026 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/03/2026 Disapproved - NO FEE BTAYLOR
Note: 2-3-26 1. Engineering good. 2. No plans in box. Inspector Notes from Inspection 2450 1-28-26 1. Need to nail plywood around rear slider. 2. Need to finish nailing plywood on front two gables.
WALL SHEATHING 01/28/2026 APPROVED - AS NOTED BTAYLOR
Note: 1-28-26 1. Need to nail plywood around rear slider. 2. Need to finish nailing plywood on front two gables.
MONOLITHIC SLAB 01/15/2026 APPROVED MKRASKI
Note:
MONOLITHIC SLAB 01/14/2026 Disapproved - NO FEE MKRASKI
Note: 1. No intent to treat onsite 2. Several locations need to be recompacted 3. Slab must be a min of 3-1/2'' pull additional strings
PLUMBING 1ST ROUGH UNDERGROUND 01/12/2026 APPROVED MKRASKI
WATER METER INSTALLATION REQUEST 01/12/2026 APPROVED CBOWERMASTER
FORMBOARD SURVEY (OFFICE USE ONLY) 01/09/2026 APPROVED RRICKS

Review History

Department Status Date In Date Out
BADMIN INFORMATION 04/24/2026 04/24/2026
Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Submit the final grading elevationcertificate and the final survey in one file
SW1 COMPLETE 01/09/2026 01/09/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 01/09/2026 01/09/2026
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BLD COMPLETE 12/18/2025 12/18/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SW1 COMPLETE 12/12/2025 12/12/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Approved as noted: There is another permit in for adjacent lot and the elevations match. In the future please ensure that the 10' shots beyond property line are taken and road center line elevations are shown.
BLD HOLD 12/11/2025 12/11/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM PREVIOUS REVIEW COMPLETED IN ERROR. THIS IS CORRECT REVIEW. Plan sheet S-1, design spec's need to be current code.
BLD COMPLETE 12/04/2025 12/11/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 12/04/2025 12/16/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 12/04/2025 12/11/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/04/2025 12/05/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 12/04/2025 12/05/2025
LOCATE COMPLETE 12/04/2025 12/11/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 12/04/2025 12/05/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 12/04/2025 12/11/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Existing elevations shall be on a 20' grid with 10' shots beyond property line. This include the road centerline as well.
ZON COMPLETE 12/04/2025 12/08/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
URB COMPLETE 12/04/2025 12/11/2025
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
WATER-METER ¤965.03 12/22/2025
WATER- TURN ON ¤50.00 12/22/2025
WATER- TURN ON ¤50.00 12/22/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 12/22/2025
INSPECTION - RESIDENTIAL ¤1,509.75 12/22/2025
PLAN REVIEW - RESIDENTIAL ¤428.22 12/22/2025
FC IMPACT FEE EMS ¤62.00 12/22/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 12/22/2025
FC IMPACT FEE LIBRARY ¤268.00 12/22/2025
FIRE RES IMPACT FEE 10-25 ¤942.00 12/22/2025
WATER METER W/OUT TAP ¤965.03 12/22/2025
PARKS IMPACT FEE 10-25 ¤3,164.00 12/22/2025
RSI DRIVEWAY AFTER POUR ¤16.25 12/22/2025
RSE DRIVE PRE POUR INSPECTION ¤32.50 12/22/2025
RSI FIELD SURVEY INSPECTION ¤48.75 12/22/2025
RSI FORMBOARD REVIEW ¤16.25 12/22/2025
RSI PLAN REVIEW NEW ¤48.75 12/22/2025
RSI FNL SURVEY/GRADING CERT ¤48.75 12/22/2025
RSI ROW FINAL INSPECTION ¤16.25 12/22/2025
SURCHARGE FS 533.721 ¤19.68 12/22/2025
SURCHARGE - FS 468.631 ¤29.52 12/22/2025
TRANSP RES IMPACT FEE 10-25 ¤10,352.42 12/22/2025
WASTEWATER PERM INSPECTION ¤80.00 12/22/2025
WASTEWATER PERM REVIEW ¤25.00 12/22/2025
SEWER CAPITAL FACILITY ¤3,613.92 12/22/2025
WATER CAPITAL FACILITY FEE ¤3,039.48 12/22/2025
WATER PERMIT INSPECTION ¤40.00 12/22/2025
WATER PERMIT REVIEW ¤25.00 12/22/2025
SITE PLAN 30 ¤30.00 12/22/2025
Fees Total Due: ¤0.00 Total Paid: ¤26,134.55