I want to search for...

Permit #2025120215

Permit Details

Status: INSPECT

Parcel Id: 07-11-31-7015-00030-1800
CONDITIONED SPACE: 2457 sqft
OPENED PORCH (WITH ROOF) : 602 sqft
GARAGE: 776 sqft
Total Square Footage: 3835 sqft
Block: 00030
Subdivision: 2194 - SECTION 15-COUNTRY CLUB COVE
Job Phone: 386-283-2035
Location Address: 19 CHEYENNE CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 02/11/2026
NOC: RECORDED
Applicant name: OLEG BELINSKIY
Owner: OSHEROV SLAVA & ELIZABETH H&W

Address

9 FLEMINGWOOD LANE

PALM COAST, FL 32137

Address

UNIT B

PALM COAST, FL 32137

Lot: 1800
Contracted Stated Job Value: ¤500,000.00
Job Description: SINGLE FAMILY - REPLACING DEMO HOUSE
Type: CN

Contractor

FLORIDAS BEST BUILDERS INC
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE

PALM COAST, FL 32164

CBC1264760 (Exp: 08/31/2026) 386-283-2035

Sub Contractors

OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)
TIMUR ISPARYAN
Status Location Address State License Number Phone Fax
ACTIVE

3665 SPRINK PARK ROAD

JACKSONVILLE , FL 32207

CMC1249968 (Exp: 08/31/2026) 904-245-1818 904-337-1910
FERNANDO MEZA SR
Status Location Address State License Number Phone
ACTIVE

457 CHELSEA PLACE AVE

ORMOND BEACH, FL 32174

EC13003906 (Exp: 08/31/2026) 386-241-5211

Inspection History

Type Request Date Result Inspector
ROOF VALLEY & METAL 06/05/2026 CANCELLED BY APPLICANT WEB
WALL SHEATHING 06/04/2026 APPROVED MCONTRYMAN
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/04/2026 Disapproved - NO FEE MCONTRYMAN
Note: 6/4/26 1. Truss' T06, T06A, T06B, T07, T07A, T07B, T07C and T07GR have all been cut/modified on garage side. Some notched and cut throug gussett plates. Per truss engineers, all field modified truss' must be done in an approved manner and never cut/notched. Will need a truss engineers letter on repairs/approvals before proceeding -Roof sheathing passes
FOUND SURVEY APPROVED (OFFICE) 06/03/2026 APPROVED BBEMBRY
TIE BEAM / LINTEL 04/30/2026 APPROVED KSANDOE
Note: 4/27/2026 - PREVIOUS INSPECTION NOTES 4/27/26 1. Bed joints on garage block exceed allowable limits of starter course of 3/4" R606.3.1. Will need engineers letter for fix 2. Left side, 3 rear windows, and right side, front window, exceeds allowable mortar joints of 1/2" R606.3.1 3. Left side of middle GD opening has block overhanging the pad. Needs to have solid foundation underneath R606.6.1
TIE BEAM / LINTEL 04/27/2026 Disapproved - NO FEE MCONTRYMAN
Note: 4/27/26 1. Bed joints on garage block exceed allowable limits of starter course of 3/4" R606.3.1. Will need engineers letter for fix 2. Left side, 3 rear windows, and right side, front window, exceeds allowable mortar joints of 1/2" R606.3.1 3. Left side of middle GD opening has block overhanging the pad. Needs to have solid foundation underneath R606.6.1
ELEV CERT-FOUNDATION APPROVAL 04/14/2026 APPROVED JMYERS
MONOLITHIC SLAB 04/01/2026 APPROVED MCONTRYMAN
Note: 3/31/2026 - PREVIOUS INSPECTION NOTES 3/31/26 Previous notes not rectified 1. Missing several column footers per plan 2. Missing 8"x8" footing around back and right side shower per plan --Workers present. Highlighted on new plans what needs to be done 3/18/2026 - PREVIOUS INSPECTION NOTES 3/18/26 1. Missing several column footers per plan 2. Missing 8"x8" footing around back shower per plan 3. Missing entire section to right side of house called out in plans. If omitting, please have plans revised and approved 3/17/2026 - PREVIOUS INSPECTION NOTES 3/17/26 1. No plans in job box FBC(A) 107.3.1 Water meter installed
MONOLITHIC SLAB 03/31/2026 Disapproved -FEE REQUIRED MCONTRYMAN
Note: 3/31/26 Previous notes not rectified 1. Missing several column footers per plan 2. Missing 8"x8" footing around back and right side shower per plan --Workers present. Highlighted on new plans what needs to be done 3/18/2026 - PREVIOUS INSPECTION NOTES 3/18/26 1. Missing several column footers per plan 2. Missing 8"x8" footing around back shower per plan 3. Missing entire section to right side of house called out in plans. If omitting, please have plans revised and approved 3/17/2026 - PREVIOUS INSPECTION NOTES 3/17/26 1. No plans in job box FBC(A) 107.3.1 Water meter installed
MONOLITHIC SLAB 03/18/2026 Disapproved - NO FEE MCONTRYMAN
Note: 3/18/26 1. Missing several column footers per plan 2. Missing 8"x8" footing around back shower per plan 3. Missing entire section to right side of house called out in plans. If omitting, please have plans revised and approved 3/17/2026 - PREVIOUS INSPECTION NOTES 3/17/26 1. No plans in job box FBC(A) 107.3.1 Water meter installed
MONOLITHIC SLAB 03/17/2026 Disapproved - NO FEE MCONTRYMAN
Note: 3/17/26 1. No plans in job box FBC(A) 107.3.1 Water meter installed
PLUMBING 1ST ROUGH UNDERGROUND 03/12/2026 APPROVED MCONTRYMAN
PLUMBING 1ST ROUGH UNDERGROUND 03/11/2026 CANCELLED BY APPLICANT WEB
FORMBOARD SURVEY (OFFICE USE ONLY) 03/10/2026 APPROVED RRICKS
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 03/04/2026 APPROVED PKNAPIK
WATER METER INSTALLATION REQUEST 02/13/2026 APPROVED ISANDERSON
U-CROSS CONNECTION
ROW- PRE-APRON (PRE-POUR)
ROW - FINAL APRON (AFTER POUR)
ROW- FINAL SURVEY/GRADING CERTIFICATION
ROW - FINAL INSPECTION
U -UTILITY RESIDENTIAL FINAL
ROOF VALLEY & METAL
INSULATION
DRYWALL NAILING
BLD - BUILDING FINAL
ROOF SHEATHING / BRACES/TIES/DOWN CELL
Note: 6/4/2026 - PREVIOUS INSPECTION NOTES 6/4/26 1. Truss' T06, T06A, T06B, T07, T07A, T07B, T07C and T07GR have all been cut/modified on garage side. Some notched and cut throug gussett plates. Per truss engineers, all field modified truss' must be done in an approved manner and never cut/notched. Will need a truss engineers letter on repairs/approvals before proceeding -Roof sheathing passes
ELEVATION CERTIFICATE-FINAL APPROVAL
GRAVITY SEWER TEST
SEWER TIE IN
ELECTRIC - EARLY POWER
LATH/BRICK/ WATER BARRIER
ALL ROUGH

Review History

Department Status Date In Date Out
PLFM COMPLETE 04/09/2026 04/14/2026
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Foundation elevation certificate has been approved. Please provide Final prior to CO.
SW1 COMPLETE 04/09/2026 04/09/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 04/09/2026 04/09/2026
Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM
BLD COMPLETE 03/24/2026 03/30/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ELEC COMPLETE 03/24/2026 03/30/2026
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SW1 COMPLETE 03/10/2026 03/10/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 03/10/2026 03/10/2026
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM
BLD COMPLETE 03/10/2026 03/11/2026
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
ZON COMPLETE 03/10/2026 03/11/2026
Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM
BLD COMPLETE 03/04/2026 03/04/2026
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 02/13/2026 02/23/2026
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SW1 COMPLETE 02/04/2026 02/11/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/04/2026 02/05/2026
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
PLFM COMPLETE 01/29/2026 01/29/2026
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Construction elevation certificate has been accepted. Please provide Foundation and Final prior to CO.
SW1 HOLD 01/29/2026 02/02/2026
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Estimated elevations are not permitted. Please revise.
BLD COMPLETE 01/29/2026 02/04/2026
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/29/2026 01/30/2026
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 01/19/2026 01/20/2026
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM re3peat comment not addressed: Please provide row agreement for paver driveway. It must be signed by all owners and notarized. Once electronic copy is approved we will ask for original sent form in email provided on permit
PLFM HOLD 01/19/2026 01/20/2026
Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM According to the Drainage and Site Plans, the structure will fall inside the SFHA. Elevation certificates are required at Construction Drawings, Foundation, and Final.
ELEC COMPLETE 01/19/2026 01/20/2026
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 01/19/2026 01/20/2026
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SW1 HOLD 01/19/2026 01/26/2026
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Based on foundation plan, the footer is not deep enough to meet proposed grades at the back. Additionally, there the proposed elevation of 6.50' at the back of the home creates a slope greater than 4:1 and does not agree with surrounding elevations. Please feel free to call if there are questions or concerns. 386-986-4726.
ENGIN1 COMPLETE 01/19/2026 01/20/2026
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
SW1 HOLD 12/12/2025 12/12/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Additional comment: -Please depict flood zone line on grading plan as instructed by Jordan Meyers. -On the foundation detail plan please indicate the dimension from top of proposed foundation to the top of proposed grade. There are several proposed elevations that are more than the standards 6-8" below the finish floor. This needs to be called out on the detail plan to ensure grades adjacent to the foundation can be met and still have the 12" of footer buiral. Please feel free to call or email if there are any questions or concerns.
ZON HOLD 12/09/2025 12/09/2025
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Repeat comment Holds not addressed: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide row agreement for paver driveway. It must be signed by all owners and notarized. Once electronic copy is approved we will ask for original Walkways cannot exceed 6ft in width Must have a minimum of 16 foundation plantings with at least 8 along the front and 4 along each front side wrapping corners
BLD HOLD 12/05/2025 12/12/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. Truss plan packet cover sheet or first page needs include the design professional of record (building design engineer or architect) approval stamp indicating acceptance and approval of truss design (Not wet seal) 2. Product Approval Provide FL# for SGD 3. Provide soil load-bearing value used for foundation design. R401.4.1 / Table R401.4.1
CUSVC COMPLETE 12/05/2025 12/15/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM Water/Sewer impact fees have already been paid and meter is already installed. No additional fees owed at this time.
ELEC HOLD 12/05/2025 12/11/2025
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Washer and dryer need to be GFCI protected. 2. Submit a riser diagram that includes all wire sizes and breaker sizes. Also must include the surge protectors and outside disconnects. NEC 2020 230.67, 230.85. The ne you submitted does not match your electrical load calcs. 3. DW outlet can not be located behind the DW. NEC 2020 422.16
ENGIN1 COMPLETE 12/05/2025 12/05/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 12/05/2025 12/08/2025
LOCATE COMPLETE 12/05/2025 12/11/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 12/05/2025 12/08/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 12/05/2025 12/12/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM On the foundation detail plan please indicate the dimension from top of proposed foundation to the top of proposed grade. There are several proposed elevations that are more than the standards 6-8" below the finish floor. This needs to be called out on the detail plan to ensure grades adjacent to the foundation can be met and still have the 12" of footer buiral. Please feel free to call or email if there are any questions or concerns.
ZON HOLD 12/05/2025 12/08/2025
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide row agreement for paver driveway. It must be signed by all owners and notarized. Once electronic copy is approved we will ask for original Walkways cannot exceed 6ft in width Must have a minimum of 16 foundation plantings with at least 8 along the front and 4 along each front side wrapping corners
SWALE COMPLETE 12/05/2025 12/30/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
PLFM HOLD 12/05/2025 12/09/2025
Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM Site Plan and Drainage Plan are missing the flood zone line, please revise.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 04/21/2026
REINSPECTION RESIDENTIAL ¤40.00 04/21/2026
CONTRACTOR CHANGE ¤20.00 04/21/2026
RECORDING FEE REIMBURSE DOC ¤44.00 02/11/2026
RSI DRIVEWAY AFTER POUR ¤16.25 02/11/2026
RSE DRIVE PRE POUR INSPECTION ¤32.50 02/11/2026
RSI FIELD SURVEY INSPECTION ¤48.75 02/11/2026
RSI FORMBOARD REVIEW ¤16.25 02/11/2026
RSI PLAN REVIEW NEW ¤48.75 02/11/2026
RSI FNL SURVEY/GRADING CERT ¤48.75 02/11/2026
RSI ROW FINAL INSPECTION ¤16.25 02/11/2026
SURCHARGE FS 533.721 ¤18.51 02/11/2026
SURCHARGE - FS 468.631 ¤27.77 02/11/2026
SW ENG RES REVIEW 240 ¤240.00 02/11/2026
WASTEWATER PERM INSPECTION ¤80.00 02/11/2026
WASTEWATER PERM REVIEW ¤25.00 02/11/2026
WATER PERMIT REVIEW ¤25.00 02/11/2026
SITE PLAN 30 ¤30.00 02/11/2026
ADMINISTRATIVE RESIDENTIAL ¤30.00 02/11/2026
INSPECTION - RESIDENTIAL ¤1,419.00 02/11/2026
PLAN REVIEW - RESIDENTIAL ¤402.48 02/11/2026
Fees Total Due: ¤0.00 Total Paid: ¤2,661.76