I want to search for...
Permit #2025120247
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-01470-0230 |
| CONDITIONED SPACE: 2509 sqft |
| GARAGE: 830 sqft |
| OPENED PORCH (WITH ROOF) : 156 sqft |
| Total Square Footage: 3495 sqft |
| Block: 01470 |
| Subdivision: 2172 - SECTION 35-BELLE TERRE |
| Job Phone: 386-445-9009 |
| Location Address: 25 BIG BEAR LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/08/2026 |
| NOC: RECORDED |
| Applicant name: BRIAN ANDREW GAZZOLI |
| Owner: KISH JOSEPH & DELMA H&W |
|
Address 28 LATTINTOWN ROAD NEWBURGH, NY 12550 |
| Lot: 0230 |
| Contracted Stated Job Value: ¤303,900.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SEAGATE HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
185 CYPRESS POINT PARKWAY Palm Coast, FL 32137 |
SUITE 7 Palm Coast, FL 32137 |
CGC1518372 (Exp: 08/31/2026) | 386-246-6132 |
Sub Contractors
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
RICHARD H SIMMONS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 1963 BUNNELL, FL 32110 |
ES12001217 (Exp: 08/31/2026) | 386-437-0607 | 386-437-1847 |
CHAD DAVID GRESSANI
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2640 BROOKSHIRE CIRCLE MELBOURNE, FL 32904 |
CCC1327235 (Exp: 08/31/2026) | 321-288-6415 | 321-729-8997 |
TIMUR ISPARYAN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
3665 SPRINK PARK ROAD JACKSONVILLE , FL 32207 |
CMC1249968 (Exp: 08/31/2026) | 904-245-1818 | 904-337-1910 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 05/21/2026 | FINAL APPROVED | BHAINES |
| Note: Inspector Notes from Inspection 9035 No CC. IRR with potable water | |||
| ROW - FINAL INSPECTION | 05/19/2026 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| U -UTILITY RESIDENTIAL FINAL | 05/19/2026 | Disapproved - NO FEE | BWRIGHT |
| Note: Gutter downspout is to close to pep panel. | |||
| U-CROSS CONNECTION | 05/19/2026 | APPROVED - AS NOTED | BWRIGHT |
| Note: No CC. IRR with potable water | |||
| ROW - FINAL APRON (AFTER POUR) | 05/19/2026 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| BLD - BUILDING FINAL | 05/19/2026 | FINAL APPROVED | JSTEWART |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/11/2026 | APPROVED | TPOLACEK |
| Note: BASED ON THE ENGINEERS SIGNED AND SEALED LGDC MEETING THE COPC MINIMUM REQUIREMENTS AT THE TIME OF THIS INSPECTION, I AM APPROVING THIS DOCUMENT. Effective 03-25-26, the ROW Field Survey requirement is no longer in effect for Final Lot Grading and Drainage Certificates for new construction on subdivision and infill lots. All Final Lot Grading and Drainage Certificates for these projects will now be reviewed and approved only in the office. Field verification for the ROW-FIELD SURVEY will no longer be required as part of the standard approval process for these permit types | |||
| ELECTRIC - EARLY POWER | 04/24/2026 | APPROVED | HCAMACHO |
| ROW- PRE-APRON (PRE-POUR) | 04/20/2026 | APPROVED - AS NOTED | EMADISON |
| Note: ** 04/20/26 CORRECTIONS MADE READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300, E RESIDENTIAL CULVERT DETAIL ____________________________________________________________________________________________________________________________ 4/16/2026 - PREVIOUS INSPECTION NOTES ** 04/16/26 THERE IS TOO MUCH MATERIAL WITHIN THE APRON AND ROW POUR AREA THERE NEEDS TO BE A MINIMUM OF 6 INCHES OF CONCRETE ** DRIVEWAY AREA ABOVE THE ROW REQUIRES A MINIMUM OF 4 INCHES OF CONCRETE NOTE STRING LINES LEFT IN PLACE ** COMPACTION OF MATERIAL IS REQUIRED TOO SOFT ANF FLUFFY FOOT SINKING IN MATERIAL ** CULVERT WAS GOOD AT THE TIME F THIS INSPECTION __________________________________________________________________________________________________________________________ 4/15/2026 - PREVIOUS INSPECTION NOTES 04-15-26 TPOLACEK*** CULVERT IS NOT SET IN ACCORDANCE TO THE SWALE PLAN DETAIL SHEET. CULVERT ELEVATION SHOULD BE SET AT 23.00 AND PIPE IS SET I AT 22.30 .70 LOWER THAN SWALE PLAN 2 Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place | |||
| ROW- PRE-APRON (PRE-POUR) | 04/16/2026 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 04/16/26 THERE IS TOO MUCH MATERIAL WITHIN THE APRON AND ROW POUR AREA THERE NEEDS TO BE A MINIMUM OF 6 INCHES OF CONCRETE ** DRIVEWAY AREA ABOVE THE ROW REQUIRES A MINIMUM OF 4 INCHES OF CONCRETE NOTE STRING LINES LEFT IN PLACE ** COMPACTION OF MATERIAL IS REQUIRED TOO SOFT ANF FLUFFY FOOT SINKING IN MATERIAL ** CULVERT WAS GOOD AT THE TIME F THIS INSPECTION __________________________________________________________________________________________________________________________ 4/15/2026 - PREVIOUS INSPECTION NOTES 04-15-26 TPOLACEK*** CULVERT IS NOT SET IN ACCORDANCE TO THE SWALE PLAN DETAIL SHEET. CULVERT ELEVATION SHOULD BE SET AT 23.00 AND PIPE IS SET I AT 22.30 .70 LOWER THAN SWALE PLAN 2 Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place | |||
| ROW- PRE-APRON (PRE-POUR) | 04/15/2026 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 04-15-26 TPOLACEK*** CULVERT IS NOT SET IN ACCORDANCE TO THE SWALE PLAN DETAIL SHEET. CULVERT ELEVATION SHOULD BE SET AT 23.00 AND PIPE IS SET I AT 22.30 .70 LOWER THAN SWALE PLAN 2 Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place | |||
| GRAVITY SEWER TEST | 04/15/2026 | APPROVED | JSTEWART |
| Note: Onsite inspection | |||
| SEWER TIE IN | 04/15/2026 | APPROVED | JSTEWART |
| Note: Onsite inspection | |||
| DRYWALL NAILING | 03/23/2026 | APPROVED | JSTEWART |
| PEP TANK INSTALLATION REQUEST | 03/20/2026 | APPROVED | ISANDERSON |
| INSULATION | 03/18/2026 | APPROVED | JSTEWART |
| LATH/BRICK/ WATER BARRIER | 03/16/2026 | APPROVED | KSANDOE |
| ALL ROUGH | 03/13/2026 | APPROVED | PKNAPIK |
| ROOF VALLEY & METAL | 03/09/2026 | APPROVED | JSTEWART |
| WALL SHEATHING | 03/03/2026 | APPROVED | JSTEWART |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/03/2026 | APPROVED | JSTEWART |
| TIE BEAM / LINTEL | 02/18/2026 | APPROVED | MCONTRYMAN |
| MONOLITHIC SLAB | 02/09/2026 | APPROVED | CVANSTRAHLEN |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/06/2026 | APPROVED | CVANSTRAHLEN |
| Note: 2/5/2026 - PREVIOUS INSPECTION NOTES Please seperate Hot water and cold water in trench (clear path) min 6" for thermal transfer per Uponer manufacturer spec. 308.9 Parallel water distribution systems. Please sleeve all water supply lines that cross plumbing. FBCP 305.2 Stress and strain. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 02/05/2026 | Disapproved - NO FEE | JSTEWART |
| Note: Please seperate Hot water and cold water in trench (clear path) min 6" for thermal transfer per Uponer manufacturer spec. 308.9 Parallel water distribution systems. Please sleeve all water supply lines that cross plumbing. FBCP 305.2 Stress and strain. | |||
| FORMBOARD SURVEY (OFFICE USE ONLY) | 02/04/2026 | APPROVED | RRICKS |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 01/30/2026 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 01/20/2026 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 03/05/2026 | 03/06/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/04/2026 | 02/04/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/04/2026 | 02/04/2026 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/29/2026 | 01/30/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/17/2025 | 12/22/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/17/2025 | 12/18/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 12/08/2025 | 12/11/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/05/2025 | 12/11/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 12/05/2025 | 12/15/2025 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 12/05/2025 | 12/11/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/05/2025 | 12/08/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 12/05/2025 | 12/08/2025 |
| LOCATE | COMPLETE | 12/05/2025 | 12/11/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 12/05/2025 | 12/08/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide return air out of den on duct layout | |||
| SW1 | HOLD | 12/05/2025 | 12/12/2025 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Grading plan comment: Benchmark is labeled crown of road, but it going to PP. Please label BM as PP. | |||
| ZON | COMPLETE | 12/05/2025 | 12/09/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| RSI REINSPECTION 1 | ¤35.00 | 05/08/2026 |
| RSI REINSPECTION 1 | ¤35.00 | 05/08/2026 |
| PLAN REVIEW - REVISION | ¤32.50 | 05/08/2026 |
| FC IMPACT FEE EMS | ¤62.00 | 01/08/2026 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 01/08/2026 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 01/08/2026 |
| FIRE RES IMPACT FEE 10-25 | ¤942.00 | 01/08/2026 |
| PEP TANK INSTALL | ¤756.74 | 01/08/2026 |
| PARKS IMPACT FEE 10-25 | ¤3,164.00 | 01/08/2026 |
| RSI DRIVEWAY AFTER POUR | ¤16.25 | 01/08/2026 |
| RSE DRIVE PRE POUR INSPECTION | ¤32.50 | 01/08/2026 |
| RSI FIELD SURVEY INSPECTION | ¤48.75 | 01/08/2026 |
| RSI FORMBOARD REVIEW | ¤16.25 | 01/08/2026 |
| RSI PLAN REVIEW NEW | ¤48.75 | 01/08/2026 |
| RSI FNL SURVEY/GRADING CERT | ¤48.75 | 01/08/2026 |
| WATER- TURN ON | ¤50.00 | 01/08/2026 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/08/2026 |
| INSPECTION - RESIDENTIAL | ¤1,369.50 | 01/08/2026 |
| PLAN REVIEW - RESIDENTIAL | ¤388.44 | 01/08/2026 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 01/08/2026 |
| SCHOOL BOARD IMPACT FEE RES | ¤5,450.00 | 01/08/2026 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,385.00 | 01/08/2026 |
| SURCHARGE FS 533.721 | ¤17.88 | 01/08/2026 |
| SURCHARGE - FS 468.631 | ¤26.82 | 01/08/2026 |
| SW ENG RES REVIEW 240 | ¤240.00 | 01/08/2026 |
| WATER METER W/ TAP | ¤2,326.93 | 01/08/2026 |
| TRANSP RES IMPACT FEE 10-25 | ¤9,458.93 | 01/08/2026 |
| SEWER CREDIT | (¤850.00) | 01/08/2026 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 01/08/2026 |
| WASTEWATER PERM REVIEW | ¤25.00 | 01/08/2026 |
| SEWER CAPITAL FACILITY | ¤4,415.00 | 01/08/2026 |
| WATER CAPITAL FACILITY FEE | ¤3,790.49 | 01/08/2026 |
| WATER PERMIT REVIEW | ¤25.00 | 01/08/2026 |
| WATER MAIN EXTENSION IMPACT | ¤917.27 | 01/08/2026 |
| SITE PLAN 30 | ¤30.00 | 01/08/2026 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤35,917.00 |