Permit #2025120399

Permit Details

Status: COED

Parcel Id: 21-12-31-5560-00000-0760
CONDITIONED SPACE: 2052 sqft
GARAGE: 501 sqft
OPENED PORCH (WITH ROOF) : 242 sqft
OPENED PORCH (WITH ROOF) : 138 sqft
CONDITIONED SPACE: 677 sqft
Total Square Footage: 3610 sqft
Subdivision: 2336 - SEMINOLE PALMS SUBDIVISION PHASE 1
Job Phone: 407-717-5418
Location Address: 292 MONTGOMERY CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/18/2025
NOC: RECORDED
Applicant name: CARLOS ANTONIO SERRANO
Owner: NVR INC

Address

8649 BAYPINE ROAD

JACKSONVILLE, FL 32256

Address

BUILDING 5 SUITE 202

JACKSONVILLE, FL 32256

Lot: 76
Contracted Stated Job Value: ¤350,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

RYAN HOMES
Status Location Address Mailing Address State License Number Phone
ACTIVE

8649 BAYPINE RD

JACKSONVILLE, FL 32256

BLDG 7, STE 202

JACKSONVILLE, FL 32256

CBC1256450 (Exp: 08/31/2026) 407-717-5418

Sub Contractors

JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
JOSEPH H STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PKWY

SANFORD, FL 32771

CAC043953 (Exp: 08/31/2026) 877-906-1113
JACK DOUGLAS LANIER
Status Location Address State License Number Phone Fax
ACTIVE

485 COMMERCE WAY

LONGWOOD , FL 32750

CCC058022 (Exp: 08/31/2026) (321)441-2300 (321)441-2313
BRITT MICHAEL JENKINS
Status Location Address State License Number Phone
ACTIVE

86 COLUMBIA DR

POOLER, GA 31322

CFC1430770 (Exp: 08/31/2026) 912-330-8151

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 04/06/2026 FINAL APPROVED BHAINES
Note: 3/27/2026 - PREVIOUS INSPECTION NOTES 3/3/2026 - PREVIOUS INSPECTION NOTES
U -UTILITY RESIDENTIAL FINAL 03/27/2026 CANCELLED BY APPLICANT BWRIGHT
Note: 3/3/2026 - PREVIOUS INSPECTION NOTES
BLD - BUILDING FINAL 03/19/2026 FINAL APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 3/19/2026 3:47:06 PM *** Final Approved 3/10/2026 - PREVIOUS INSPECTION NOTES 3/10/26: Incomplete inspection due to work being performed and breakers off. Roof and Smokes checked and approved ** Kitchen counter outlets are covered with counter protection for ceiling work being performed. Partial list until full inspection can be completed. 1). Breakers are off for GFCI bathrooms and garage / Exterior. Could not test. FBC-[A] 110.1 2). Water Heater Relief Valve Discharge tube is too long per FBC- P504.6 (1.5" min / 6" max 0ff floor). 3). Owners suite on first floor. Return register is bent down and not sealed to the ceiling as required. FBC EC TABLE R402.4.1.1 4). Hole in drywall behind range needs to be repaired. FBC EC TABLE R402.4.1.1 5). Missing drywall in garage above garage door bucks. FBC-R302.11 / FBC-R302.6 6). Left side garage downspout must terminate 1 ft away from foundation. FBC-R318.5
BLD - BUILDING FINAL 03/10/2026 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 3/10/2026 12:35:48 PM *** 3/10/26: Incomplete inspection due to work being performed and breakers off. Roof and Smokes checked and approved ** Kitchen counter outlets are covered with counter protection for ceiling work being performed. Partial list until full inspection can be completed. 1). Breakers are off for GFCI bathrooms and garage / Exterior. Could not test. FBC-[A] 110.1 2). Water Heater Relief Valve Discharge tube is too long per FBC- P504.6 (1.5" min / 6" max 0ff floor). 3). Owners suite on first floor. Return register is bent down and not sealed to the ceiling as required. FBC EC TABLE R402.4.1.1 4). Hole in drywall behind range needs to be repaired. FBC EC TABLE R402.4.1.1 5). Missing drywall in garage above garage door bucks. FBC-R302.11 / FBC-R302.6 6). Left side garage downspout must terminate 1 ft away from foundation. FBC-R318.5
U -UTILITY RESIDENTIAL FINAL 03/03/2026 Disapproved - NO FEE BWRIGHT
U-CROSS CONNECTION 03/03/2026 APPROVED BWRIGHT
ROW - FINAL APRON (AFTER POUR) 02/24/2026 APPROVED FSLADISH
Note: 2/24/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/24/2026 APPROVED FSLADISH
Note: I am approving this as noted to prevent delays. RRicks On the right side near the front of the house, there is a cross slope greater than 4:1 and needs to be corrected out in the field. This is being approved due to the details showing deepened footers and our extensive communications about this. Failure to meet these standards out in the field will result in a hold despite this elevation on the grading plan. If there are any questions call Rodney 386-986-4726.
ROW FIELD SURVEY /GRADING CERTIFICATION 02/24/2026 APPROVED FSLADISH
Note: 2/24/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW - FINAL INSPECTION 02/24/2026 APPROVED FSLADISH
Note: 2/24/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ELECTRIC - EARLY POWER 02/04/2026 APPROVED - AS NOTED BTAYLOR
Note: 2-4-26 1. Emailed FPL at 12:18. Inspector Notes from Inspection 2200 1-8-26 1. Emailed FPL at 12:43.
LATH/BRICK/ WATER BARRIER 01/26/2026 APPROVED BTAYLOR
ROW- PRE-APRON (PRE-POUR) 01/23/2026 APPROVED FSLADISH
Note: 1/23/26 . BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER. ALSO VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
DRYWALL NAILING 01/20/2026 APPROVED BTAYLOR
INSULATION 01/16/2026 APPROVED KSANDOE
Note: Inspector Notes from Inspection 2420 5ft head failed 1/8/2026 - PREVIOUS INSPECTION NOTES
ALL ROUGH 01/15/2026 APPROVED - AS NOTED KSANDOE
Note: 5ft head failed 1/8/2026 - PREVIOUS INSPECTION NOTES
ALL ROUGH 01/08/2026 CANCELLED BY APPLICANT BTAYLOR
LATH/BRICK/ WATER BARRIER 01/08/2026 APPROVED BTAYLOR
ELECTRIC-TUG 01/08/2026 APPROVED - AS NOTED BTAYLOR
Note: 1-8-26 1. Emailed FPL at 12:43.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/06/2026 APPROVED BTAYLOR
ROOF VALLEY & METAL 01/06/2026 APPROVED BTAYLOR
WALL SHEATHING 01/05/2026 APPROVED BTAYLOR
MONOLITHIC SLAB 12/22/2025 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 12/22/2025 APPROVED BTAYLOR
GRAVITY SEWER TEST 12/19/2025 APPROVED BTAYLOR
SEWER TIE IN 12/19/2025 APPROVED BTAYLOR
FORMBOARD SURVEY (OFFICE USE ONLY) 12/19/2025 APPROVED RRICKS
WATER METER INSTALLATION REQUEST 12/19/2025 APPROVED BVITALE

Review History

Department Status Date In Date Out
SW1 HOLD 12/19/2025 12/19/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Benchmark does not match approved grading plan.
ZON COMPLETE 12/19/2025 12/19/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
SW1 COMPLETE 12/19/2025 12/19/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
SW1 COMPLETE 12/17/2025 12/18/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM I am approving this as noted to prevent delays. On the right side near the front of the house, there is a cross slope greater than 4:1 and needs to be corrected out in the field. This is being approved due to the details showing deepened footers and our extensive communications about this. Failure to meet these standards out in the field will result in a hold despite this elevation on the grading plan. 
MECH COMPLETE 12/17/2025 12/17/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 12/17/2025 12/17/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
ELEC COMPLETE 12/17/2025 12/18/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 12/17/2025 12/18/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
URB COMPLETE 12/17/2025 12/18/2025
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM
BLD HOLD 12/11/2025 12/12/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. Missing plan sheet FD-1b and/or the deepend foundation letter. 2. Missing plan sheet FC-1b for the wall panel attachments.
CUSVC COMPLETE 12/11/2025 12/17/2025
Note: Released By: MICHELLE MCPARTLAND - -
ELEC HOLD 12/11/2025 12/15/2025
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit electrical load calcs
ENGIN1 COMPLETE 12/11/2025 12/12/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 12/11/2025 12/12/2025
LOCATE COMPLETE 12/11/2025 12/16/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 12/11/2025 12/12/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Energy Calcs and State Card need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition 2. Direction house faces on Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2023 8Th Edition 3. Chosen equipment on heatload exceeds the maximum of 1.15 times the load calculated.per R403.7.1.2.1 FBC Energy Conservation 2023 8TH Edition
SW1 HOLD 12/11/2025 12/12/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Grading comments - Based on the information provided there are slopes greater than 25% at the front of the home going to both side lot lines. Please revised elevations and attached approved foundation plans.
ZON HOLD 12/11/2025 12/15/2025
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Elevation Stone work needs to wrap around the corner on the right side for 2 ft and any horizontal banding should wrap a corner for 2' Sqft on the plan does not add up to what is being put in the sq ft area of permit. The sqft must add up. i will send an email to you highlighting what needs to be corrected

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
WATER-METER ¤874.47 12/18/2025
WATER- TURN ON ¤50.00 12/18/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 12/18/2025
INSPECTION - RESIDENTIAL ¤1,452.00 12/18/2025
PLAN REVIEW - RESIDENTIAL ¤411.84 12/18/2025
FC IMPACT FEE EMS ¤62.00 12/18/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 12/18/2025
FC IMPACT FEE LIBRARY ¤268.00 12/18/2025
FIRE RES IMPACT FEE 10-25 ¤942.00 12/18/2025
WATER METER W/OUT TAP ¤965.03 12/18/2025
PARKS IMPACT FEE 10-25 ¤3,164.00 12/18/2025
RECLAIM WATER PERMIT INSPECTIO ¤40.00 12/18/2025
RSI DRIVEWAY AFTER POUR ¤16.25 12/18/2025
RSE DRIVE PRE POUR INSPECTION ¤32.50 12/18/2025
RSI FIELD SURVEY INSPECTION ¤48.75 12/18/2025
RSI FORMBOARD REVIEW ¤16.25 12/18/2025
RSI PLAN REVIEW NEW ¤48.75 12/18/2025
RSI FNL SURVEY/GRADING CERT ¤48.75 12/18/2025
RSI ROW FINAL INSPECTION ¤16.25 12/18/2025
SURCHARGE FS 533.721 ¤18.94 12/18/2025
SURCHARGE - FS 468.631 ¤28.41 12/18/2025
SW ENG RES REVIEW 240 ¤240.00 12/18/2025
TRANSP RES IMPACT FEE 10-25 ¤10,288.33 12/18/2025
TRANSP RES IMPACT FEE 10-25 (¤10,288.33) 12/18/2025
WASTEWATER PERM INSPECTION ¤80.00 12/18/2025
WASTEWATER PERM REVIEW ¤25.00 12/18/2025
SEWER CAPITAL FACILITY ¤2,368.69 12/18/2025
WATER CAPITAL FACILITY FEE ¤1,744.18 12/18/2025
WATER PERMIT REVIEW ¤25.00 12/18/2025
SITE PLAN 30 ¤30.00 12/18/2025
Fees Total Due: ¤0.00 Total Paid: ¤13,265.06