I want to search for...
Permit #2025120601
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7014-00020-0430 |
| Block: 00020 |
| Subdivision: 7014 - |
| Job Phone: 386-627-8289 |
| Location Address: 48 COTTONWOOD CT |
| Type: DK - DOCK |
| Issue Date: 01/22/2026 |
| NOC: RECORDED |
| Applicant name: ROBERT E WILLIAMS |
| Owner: LOCY LISA BETH & DAVID K W&H |
|
Address 48 COTTONWOOD CT PALM COAST, FL 32137 |
| Lot: 0430 |
| Contracted Stated Job Value: ¤17,750.00 |
| Job Description: CANTILEVER WALKWAY & 4 PILING LIFT - ELECTRICAL DONE BY OWNER |
| Type: CN |
Contractor
ELITE MARINE CONSTRUCTION LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
14 UTILITY DR SUITE9 PALM COAST, FL 32137 |
SCC131152486 (Exp: 08/31/2026) | 386-627-8289 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL - BUILDING MISC | 03/05/2026 | FINAL APPROVED | MCONTRYMAN |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 01/21/2026 | 01/21/2026 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | HOLD | 01/19/2026 | 01/20/2026 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM For docks with slips, an additional foot of setback will be required for every foot of slipway over 20 feet. You are not meeting this requirement on the slip side. Your setback needs to be a minimum of 16' due to this requirement. | |||
| BLD | COMPLETE | 01/19/2026 | 01/21/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/18/2025 | 12/26/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | HOLD | 12/18/2025 | 12/18/2025 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM For docks with slips, an additional foot of setback will be required for every foot of slipway over 20 feet. Please show clearly the total distance the cantilever projects into the waterbody. No License Agreement required since one was done when the dock was constructed in 2020. The plans need to clearly show construction of the cantilever walkway with all dimensions. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/22/2026 |
| INSPECTION - RESIDENTIAL | ¤60.00 | 01/22/2026 |
| PLAN REVIEW - MISC 32.50 | ¤32.50 | 01/22/2026 |
| SURCHARGE FS 533.721 | ¤2.00 | 01/22/2026 |
| SURCHARGE - FS 468.631 | ¤2.00 | 01/22/2026 |
| SITE PLAN 30 | ¤30.00 | 01/22/2026 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤156.50 |