I want to search for...

Permit #2025120659

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7035-00550-0030
Block: 00550
Subdivision: 2172 - SECTION 35-BELLE TERRE
Job Phone: (386)627-0927
Location Address: 6 BURBANK DR
Type: PO - POOL
Issue Date: 01/16/2026
NOC: RECORDED
Applicant name: JASON BRET PAVLOW
Owner: CHISHOLM KEITH ANTHONY

Address

6 BURBANK DRIVE

PALM COAST, FL 32137

Lot: 0030
Contracted Stated Job Value: ¤74,600.00
Job Description: POOL
Type: CN

Contractor

WATERSIDE POOLS INC
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST , FL 32137

#3K

PALM COAST , FL 32137

CPC1457358 (Exp: 08/31/2026) (386)447-3390 (386)447-3391

Sub Contractors

CHRISTOPHER I HALL
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 2413

Bunnell, FL 32110

EC13002161 (Exp: 08/31/2028) (386) 437-2966 386-437-5042

Inspection History

Type Request Date Result Inspector
POOL FINAL 06/11/2026 FINAL APPROVED JSTEWART
Note: Inspector Notes from Inspection 2610 1. Detail in the plans submitted was used for the retain wall. 2/23/2026 - PREVIOUS INSPECTION NOTES On the raised footing portion of the deck is between 20" to 24" deep, with only aproximatly 4" to 6" below grade. Need a deatail on depth of footing below grade for stability of the raised footing, and also reinforcememnt vertically and top horizontal for lateral stability. Please submit to the city for approval.
U -UTILITY RESIDENTIAL FINAL 06/10/2026 APPROVED BVEIGA
ROW FIELD SURVEY /GRADING CERTIFICATION 06/09/2026 APPROVED PFLANAGAN
Note: Please see notes on final survey
ROW - FINAL INSPECTION 06/09/2026 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/08/2026 APPROVED PFLANAGAN
Note: Final survey shows that drainage will work properly. ---------------------------------------------------------------------------- 5/22/2026 - PREVIOUS INSPECTION NOTES ** 05/22/26 THIS IS THE SAME FINAL SURVEY AS SUBMITTED PREVIOUSLY WITH THE ONLY CHANGE MADE WAS YOU ADDED FLOW ARROWS WHICH ON THE LEFT SIDE IT INDICATES YOU ARE ATTEMPTING TO PUSH WATER AGAINST YOUR PROPOSED DRAINAGE FLOW ** YOUR SUBMITTED FINAL SURVEY AS WELL AS REVIEWING THE PREVIOUSLY SUBMITTED FINAL SURVEY YOUR FFE OF THE POOL DECK AND (EXISTING LANA ARE THE SAME AS YOU NOTE ON YOUR PROPOSED SITE PLAN) WHICH SHOWS TO BE (.29) HIGHER THAN THE FFE OF THE STRUCTURE (HOUSE). ** YOUR FINAL SURVEY ALSO SHOWS THAT YOU WILL PUSH WATER FROM YOUR REAR FENCE UP AGAINST YOUR POOL STRUCTURE THAT AREA IS FLAT AND SHOWS IT WILL HOLD WATER. YOU NEED TO PUSH WATER AWAY FROM YOUR STRUCTURE CREATE A DRAINAGE FEATURE BETWEEN IT AND YOUR FENCE THE THE CENTER OF THE THE DRAINAGE FEATURE NEEDS TO BE .30 FROM THE BOTTOM TO THE TOP OF SAID FEATURE WITH POSITIVE FALL TO THE REAR TO THE FRONT OF YOUR PROPERTY **4) Positive fall is considered to be 0.10 of a foot every 20 feet. Section 300.01 D(4) V-17 ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" ___________________________________________________________________________________________________________________________ 5/7/2026 - PREVIOUS INSPECTION NOTES ** 05/07/26 UPON FURTHER REVIEW OF YOUR SUBMITTED FINAL SURVEY AS WELL AS REVIEWING THE PREVIOUSLY SUBMITTED FINAL SURVEYYOUR FFE OF THE POOL DECK AND (EXISTING LANAI AS YOU NOTE ON YOUR PROPOSED SITE PLAN) ARE (.29) HIGHER THAN YOUR FFE OF THE STRUCTURE. ** YOUR FINAL SURVEY ALSO SHOWS THAT YOU WILL PUSH WATER FROM YOUR REAR FENCE UP AGAINST YOUR POOL STRUCTURE THAT AREA IS FLAT AND SHOWS IT WILL HOLD WATER. YOU NEED TO PUSH WATER AWAY FROM YOUR STRUCTURE CREATE A DRAINAGE FEATURE BETWEEN IT AND YOUR FENCE THE THE CENTER OF THE THE DRAINAGE FEATURE NEEDS TO BE .30 FROM THE BOTTOM TO THE TOP OF SAID FEATURE WITH POSITIVE FALL TO THE REAR TO THE FRONT OF YOUR PROPERTY **4) Positive fall is considered to be 0.10 of a foot every 20 feet. Section 300.01 D(4) V-17 ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" ___________________________________________________________________________________________________________________________ 5/6/2026 - PREVIOUS INSPECTION NOTES 05-06-26 TPOLACEK*** PLEASE SEE ATTACHED PHOTO OF SURVEY AND CODES. DRAINAGE WILL FALL BACK TO POOL DECK AND DOES NOT MEET COPC MINIMUM REQUIREMENTS Finished Floor Elevations (FFE):REAR YARD DRAINAGE Section 300.01 D(6) V-17 6) The top of slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. Section 300.01 D(6) V-17 E.Florida Building Code, Residential, Chapter 4, R401.3 Chapter 4, R401.3 Chapter 4, R401.3- Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’.(E)
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/22/2026 Disapproved - NO FEE EMADISON
Note: ** 05/22/26 THIS IS THE SAME FINAL SURVEY AS SUBMITTED PREVIOUSLY WITH THE ONLY CHANGE MADE WAS YOU ADDED FLOW ARROWS WHICH ON THE LEFT SIDE IT INDICATES YOU ARE ATTEMPTING TO PUSH WATER AGAINST YOUR PROPOSED DRAINAGE FLOW ** YOUR SUBMITTED FINAL SURVEY AS WELL AS REVIEWING THE PREVIOUSLY SUBMITTED FINAL SURVEY YOUR FFE OF THE POOL DECK AND (EXISTING LANA ARE THE SAME AS YOU NOTE ON YOUR PROPOSED SITE PLAN) WHICH SHOWS TO BE (.29) HIGHER THAN THE FFE OF THE STRUCTURE (HOUSE). ** YOUR FINAL SURVEY ALSO SHOWS THAT YOU WILL PUSH WATER FROM YOUR REAR FENCE UP AGAINST YOUR POOL STRUCTURE THAT AREA IS FLAT AND SHOWS IT WILL HOLD WATER. YOU NEED TO PUSH WATER AWAY FROM YOUR STRUCTURE CREATE A DRAINAGE FEATURE BETWEEN IT AND YOUR FENCE THE THE CENTER OF THE THE DRAINAGE FEATURE NEEDS TO BE .30 FROM THE BOTTOM TO THE TOP OF SAID FEATURE WITH POSITIVE FALL TO THE REAR TO THE FRONT OF YOUR PROPERTY **4) Positive fall is considered to be 0.10 of a foot every 20 feet. Section 300.01 D(4) V-17 ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" ___________________________________________________________________________________________________________________________ 5/7/2026 - PREVIOUS INSPECTION NOTES ** 05/07/26 UPON FURTHER REVIEW OF YOUR SUBMITTED FINAL SURVEY AS WELL AS REVIEWING THE PREVIOUSLY SUBMITTED FINAL SURVEYYOUR FFE OF THE POOL DECK AND (EXISTING LANAI AS YOU NOTE ON YOUR PROPOSED SITE PLAN) ARE (.29) HIGHER THAN YOUR FFE OF THE STRUCTURE. ** YOUR FINAL SURVEY ALSO SHOWS THAT YOU WILL PUSH WATER FROM YOUR REAR FENCE UP AGAINST YOUR POOL STRUCTURE THAT AREA IS FLAT AND SHOWS IT WILL HOLD WATER. YOU NEED TO PUSH WATER AWAY FROM YOUR STRUCTURE CREATE A DRAINAGE FEATURE BETWEEN IT AND YOUR FENCE THE THE CENTER OF THE THE DRAINAGE FEATURE NEEDS TO BE .30 FROM THE BOTTOM TO THE TOP OF SAID FEATURE WITH POSITIVE FALL TO THE REAR TO THE FRONT OF YOUR PROPERTY **4) Positive fall is considered to be 0.10 of a foot every 20 feet. Section 300.01 D(4) V-17 ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" ___________________________________________________________________________________________________________________________ 5/6/2026 - PREVIOUS INSPECTION NOTES 05-06-26 TPOLACEK*** PLEASE SEE ATTACHED PHOTO OF SURVEY AND CODES. DRAINAGE WILL FALL BACK TO POOL DECK AND DOES NOT MEET COPC MINIMUM REQUIREMENTS Finished Floor Elevations (FFE):REAR YARD DRAINAGE Section 300.01 D(6) V-17 6) The top of slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. Section 300.01 D(6) V-17 E.Florida Building Code, Residential, Chapter 4, R401.3 Chapter 4, R401.3 Chapter 4, R401.3- Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’.(E)
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/07/2026 Disapproved - NO FEE EMADISON
Note: ** 05/07/26 UPON FURTHER REVIEW OF YOUR SUBMITTED FINAL SURVEY AS WELL AS REVIEWING THE PREVIOUSLY SUBMITTED FINAL SURVEYYOUR FFE OF THE POOL DECK AND (EXISTING LANAI AS YOU NOTE ON YOUR PROPOSED SITE PLAN) ARE (.29) HIGHER THAN YOUR FFE OF THE STRUCTURE. ** YOUR FINAL SURVEY ALSO SHOWS THAT YOU WILL PUSH WATER FROM YOUR REAR FENCE UP AGAINST YOUR POOL STRUCTURE THAT AREA IS FLAT AND SHOWS IT WILL HOLD WATER. YOU NEED TO PUSH WATER AWAY FROM YOUR STRUCTURE CREATE A DRAINAGE FEATURE BETWEEN IT AND YOUR FENCE THE THE CENTER OF THE THE DRAINAGE FEATURE NEEDS TO BE .30 FROM THE BOTTOM TO THE TOP OF SAID FEATURE WITH POSITIVE FALL TO THE REAR TO THE FRONT OF YOUR PROPERTY **4) Positive fall is considered to be 0.10 of a foot every 20 feet. Section 300.01 D(4) V-17 ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" ___________________________________________________________________________________________________________________________ 5/6/2026 - PREVIOUS INSPECTION NOTES 05-06-26 TPOLACEK*** PLEASE SEE ATTACHED PHOTO OF SURVEY AND CODES. DRAINAGE WILL FALL BACK TO POOL DECK AND DOES NOT MEET COPC MINIMUM REQUIREMENTS Finished Floor Elevations (FFE):REAR YARD DRAINAGE Section 300.01 D(6) V-17 6) The top of slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. Section 300.01 D(6) V-17 E.Florida Building Code, Residential, Chapter 4, R401.3 Chapter 4, R401.3 Chapter 4, R401.3- Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’.(E)
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/06/2026 Disapproved - NO FEE TPOLACEK
Note: 05-06-26 TPOLACEK*** PLEASE SEE ATTACHED PHOTO OF SURVEY AND CODES. DRAINAGE WILL FALL BACK TO POOL DECK AND DOES NOT MEET COPC MINIMUM REQUIREMENTS Finished Floor Elevations (FFE):REAR YARD DRAINAGE Section 300.01 D(6) V-17 6) The top of slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. Section 300.01 D(6) V-17 E.Florida Building Code, Residential, Chapter 4, R401.3 Chapter 4, R401.3 Chapter 4, R401.3- Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’.(E)
ELECTRIC AND ALARM 03/24/2026 APPROVED JSTEWART
POOL DECK 03/03/2026 APPROVED - AS NOTED HCAMACHO
Note: 1. Detail in the plans submitted was used for the retain wall. 2/23/2026 - PREVIOUS INSPECTION NOTES On the raised footing portion of the deck is between 20" to 24" deep, with only aproximatly 4" to 6" below grade. Need a deatail on depth of footing below grade for stability of the raised footing, and also reinforcememnt vertically and top horizontal for lateral stability. Please submit to the city for approval.
POOL DECK 02/23/2026 Disapproved - NO FEE JSTEWART
Note: On the raised footing portion of the deck is between 20" to 24" deep, with only aproximatly 4" to 6" below grade. Need a deatail on depth of footing below grade for stability of the raised footing, and also reinforcememnt vertically and top horizontal for lateral stability. Please submit to the city for approval.
STEEL AND GROUND 02/04/2026 APPROVED JSTEWART

Review History

Department Status Date In Date Out
BFLOOD CANCEL 12/19/2025 12/19/2025
BLD COMPLETE 12/19/2025 12/26/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ELEC COMPLETE 12/19/2025 12/26/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 12/19/2025 12/19/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
RSI COMPLETE 12/19/2025 12/19/2025
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 12/19/2025 12/19/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMINISTRATIVE RESIDENTIAL ¤30.00 01/16/2026
INSPECTION- POOL ¤160.00 01/16/2026
PLAN REVIEW - RESIDENTIAL ¤65.00 01/16/2026
RSI FIELD SURVEY INSPECTION ¤48.75 01/16/2026
RSI PLAN REVIEW NEW ¤48.75 01/16/2026
RSI FNL SURVEY/GRADING CERT ¤48.75 01/16/2026
RSI ROW FINAL INSPECTION ¤16.25 01/16/2026
SURCHARGE FS 533.721 ¤2.55 01/16/2026
SURCHARGE - FS 468.631 ¤3.83 01/16/2026
SITE PLAN 30 ¤30.00 01/16/2026
Fees Total Due: ¤0.00 Total Paid: ¤453.88