I want to search for...

Permit #2025120665

Permit Details

Status: INSPECT

Parcel Id: 06-12-31-5182-00000-0340
CONDITIONED SPACE: 2230 sqft
GARAGE: 426 sqft
OPENED PORCH (WITH ROOF) : 228 sqft
Total Square Footage: 2884 sqft
Subdivision: 2322 - RETREAT AT TOWN CENTER PHASE 1
Job Phone: 904-669-7000
Location Address: 50 MAHOGANY WAY
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 02/11/2026
NOC: RECORDED
Applicant name: PAUL GILBERT AXTELL
Owner: TOLL SOUTHEAST LP COMPANY INC

Address

1140 VIRGINIA DRIVE

FORT WASHINGTON, PA 19034

Lot: 34
Contracted Stated Job Value: ¤426,429.00
Job Description: SINGLE FAMILY HOME
Type: CN

Contractor

TOLL BROS INC
Status Location Address State License Number Phone
ACTIVE

40 EVEREST LN, STE 5

ST JOHNS, FL 32259

CGC60445 (Exp: 08/31/2026) 904-217-3852

Sub Contractors

JAMES F QUINN III
Status Location Address State License Number Phone
ACTIVE

3210 SW 40TH BLVD STE F

GAINESVILLE, FL 32608

EC13010994 (Exp: 08/31/2026) 352-378-9274
PAUL ERIC FORSTER
Status Location Address State License Number Phone
ACTIVE

6114 GOODMAN RD

JACKSONVILLE, FL 32244

CFC1429261 (Exp: 08/31/2026) 904-647-1820
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
BRETT CHRISTIAN GIBSON
Status Location Address State License Number Phone
ACTIVE

250 SEGOVIA RD

ST AUGUSTINE, FL 32086

CAC1818423 (Exp: 08/31/2026) 904-229-8131
HARLEY M BRYAN
Status Location Address State License Number Phone
ACTIVE

5223 EDGEWOOD CT

ORMOND BEACH, FL 32174

LI26657 (Exp: 08/31/2028) 386-463-2700

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 06/02/2026 APPROVED FSLADISH
Note: 6/2/26 AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
U -UTILITY RESIDENTIAL FINAL 06/01/2026 CANCELLED BY APPLICANT BHAINES
ELECTRIC - EARLY POWER 06/01/2026 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 6/1/2026 8:48:08 AM *** 6/1/26: FPL emailed to release power. 1).Main meter panel > deadfront cover is missing a screw. Inspector Notes from Inspection 2200 Release Power
ROW- PRE-APRON (PRE-POUR) 05/29/2026 APPROVED FSLADISH
Note: 5/29/26 AT THE TIME OF THE INSPECTION PREPOUR AREA IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD REMOVE ALL WATER AND CHECK COMPACTION BEFORE POURING CONCRETE. 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED IS REQUIRED. PLEASE REVIEW CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. NO EXPANSION JOINTS ALLOWED.
DRYWALL NAILING 04/13/2026 APPROVED CVANSTRAHLEN
INSULATION 04/09/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 4/9/2026 9:51:46 AM *** 4/8/2026 - PREVIOUS INSPECTION NOTES 4/8/26: Previously listed item 1 is incomplete. 1). Primary bathroom shower wall still needs to be corrected. Previously listed item 2 remains unresolved. 2). Baffles installed on the right side along with the back left corner are not secured as required to provide the 1" minimum clearance to roof sheathing. FBC-R806.3 ______________________________________________________________________________________________________________________ 4/6/2026 - PREVIOUS INSPECTION NOTES 4/6/26: 1). There is missing and/or incomplete firestop at top plate penetration in the Den/Study and Primary bathroom. FS marked on stud for missing firestop and FSI marked on stud for incomplete firestop. 2). Baffles installed on the right side along with the back left corner are not secured as required to provide the 1" minimum clearance to roof sheathing. FBC-R806.3 Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 4/2/2026 9:22:00 AM *** 4/2/26: Check at Insulation Inspection. 1). Gas piping needs to be supported at increments listed on FBCR - TABLE G2424.1 (415.1). 2). Security panel metal outlet box needs to be installed and bonded for visual verification. NEC-250.148(C) 3). Bathroom exhaust ducts are missing the mechanical connection (strap or clamp) at the fan. FBC-M1502.4.2 / FBC-M1601.4.1 / R806.1
INSULATION 04/08/2026 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 4/8/2026 9:09:58 AM *** 4/8/26: Previously listed item 1 is incomplete. 1). Primary bathroom shower wall still needs to be corrected. Previously listed item 2 remains unresolved. 2). Baffles installed on the right side along with the back left corner are not secured as required to provide the 1" minimum clearance to roof sheathing. FBC-R806.3 ______________________________________________________________________________________________________________________ 4/6/2026 - PREVIOUS INSPECTION NOTES 4/6/26: 1). There is missing and/or incomplete firestop at top plate penetration in the Den/Study and Primary bathroom. FS marked on stud for missing firestop and FSI marked on stud for incomplete firestop. 2). Baffles installed on the right side along with the back left corner are not secured as required to provide the 1" minimum clearance to roof sheathing. FBC-R806.3 Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 4/2/2026 9:22:00 AM *** 4/2/26: Check at Insulation Inspection. 1). Gas piping needs to be supported at increments listed on FBCR - TABLE G2424.1 (415.1). 2). Security panel metal outlet box needs to be installed and bonded for visual verification. NEC-250.148(C) 3). Bathroom exhaust ducts are missing the mechanical connection (strap or clamp) at the fan. FBC-M1502.4.2 / FBC-M1601.4.1 / R806.1
LATH/BRICK/ WATER BARRIER 04/07/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 4/7/2026 3:24:22 PM *** Approved New inspection due to canceled inspection Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 4/2/2026 9:22:00 AM *** 4/2/26: Check at Insulation Inspection. 1). Gas piping needs to be supported at increments listed on FBCR - TABLE G2424.1 (415.1). 2). Security panel metal outlet box needs to be installed and bonded for visual verification. NEC-250.148(C) 3). Bathroom exhaust ducts are missing the mechanical connection (strap or clamp) at the fan. FBC-M1502.4.2 / FBC-M1601.4.1 / R806.1
GRAVITY SEWER TEST 04/07/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 4/7/2026 11:00:07 AM *** 4/7/26: Virtually approved via FaceTime video/audio phone app at @ 1100.
SEWER TIE IN 04/07/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 4/7/2026 10:58:51 AM *** 4/7/26: Virtually approved via FaceTime video/audio phone app at @ 1100
LATH/BRICK/ WATER BARRIER 04/06/2026 CANCELLED BY APPLICANT WEB
Note: Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 4/2/2026 9:22:00 AM *** 4/2/26: Check at Insulation Inspection. 1). Gas piping needs to be supported at increments listed on FBCR - TABLE G2424.1 (415.1). 2). Security panel metal outlet box needs to be installed and bonded for visual verification. NEC-250.148(C) 3). Bathroom exhaust ducts are missing the mechanical connection (strap or clamp) at the fan. FBC-M1502.4.2 / FBC-M1601.4.1 / R806.1
INSULATION 04/06/2026 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 4/6/2026 9:21:54 AM *** 4/6/26: 1). There is missing and/or incomplete firestop at top plate penetration in the Den/Study and Primary bathroom. FS marked on stud for missing firestop and FSI marked on stud for incomplete firestop. 2). Baffles installed on the right side along with the back left corner are not secured as required to provide the 1" minimum clearance to roof sheathing. FBC-R806.3 Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 4/2/2026 9:22:00 AM *** 4/2/26: Check at Insulation Inspection. 1). Gas piping needs to be supported at increments listed on FBCR - TABLE G2424.1 (415.1). 2). Security panel metal outlet box needs to be installed and bonded for visual verification. NEC-250.148(C) 3). Bathroom exhaust ducts are missing the mechanical connection (strap or clamp) at the fan. FBC-M1502.4.2 / FBC-M1601.4.1 / R806.1
ALL ROUGH 04/02/2026 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 4/2/2026 9:22:00 AM *** 4/2/26: Check at Insulation Inspection. 1). Gas piping needs to be supported at increments listed on FBCR - TABLE G2424.1 (415.1). 2). Security panel metal outlet box needs to be installed and bonded for visual verification. NEC-250.148(C) 3). Bathroom exhaust ducts are missing the mechanical connection (strap or clamp) at the fan. FBC-M1502.4.2 / FBC-M1601.4.1 / R806.1
ROOF VALLEY & METAL 04/01/2026 APPROVED JSTEWART
Note: New inspection due to canceled inspection 3/23/2026 - PREVIOUS INSPECTION NOTES No corrections have been made 3/20/2026 - PREVIOUS INSPECTION NOTES 3/20/26: 1). 5" x 5" wall flashing at front of house needs to be sealed/taped to sheathing as required. FBC-R903.2
ROOF VALLEY & METAL 03/31/2026 CANCELLED BY APPLICANT WEB
Note: 3/23/2026 - PREVIOUS INSPECTION NOTES No corrections have been made 3/20/2026 - PREVIOUS INSPECTION NOTES 3/20/26: 1). 5" x 5" wall flashing at front of house needs to be sealed/taped to sheathing as required. FBC-R903.2
WATER METER INSTALLATION REQUEST 03/27/2026 APPROVED ISANDERSON
ELECTRIC-TUG 03/26/2026 APPROVED - AS NOTED KSANDOE
Note: Release Power
ROOF VALLEY & METAL 03/23/2026 Disapproved - NO FEE KSANDOE
Note: No corrections have been made 3/20/2026 - PREVIOUS INSPECTION NOTES 3/20/26: 1). 5" x 5" wall flashing at front of house needs to be sealed/taped to sheathing as required. FBC-R903.2
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/20/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 3/20/2026 3:00:47 PM *** Approved 3/18/2026 - PREVIOUS INSPECTION NOTES 3/18/26: Partially approved for roof sheathing, truss engineering and lanai tie down. *** Remaining tie-down to be inspected as the installer was still working on completing.
ROOF VALLEY & METAL 03/20/2026 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 3/20/2026 3:02:14 PM *** 3/20/26: 1). 5" x 5" wall flashing at front of house needs to be sealed/taped to sheathing as required. FBC-R903.2
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/18/2026 PARTIALLY APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 3/18/2026 9:44:32 AM *** 3/18/26: Partially approved for roof sheathing, truss engineering and lanai tie down. *** Remaining tie-down to be inspected as the installer was still working on completing.
WALL SHEATHING 03/16/2026 APPROVED PKNAPIK
MONOLITHIC SLAB 02/18/2026 APPROVED MCONTRYMAN
PLUMBING 1ST ROUGH UNDERGROUND 02/17/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 2/17/2026 9:27:45 AM ***
FORMBOARD SURVEY (OFFICE USE ONLY) 02/12/2026 APPROVED RRICKS
U-CROSS CONNECTION
ROW - FINAL INSPECTION
BLD - BUILDING FINAL
Note: 6/1/26: Main meter panel > deadfront cover is missing a screw. > from Early power Inspection.
U -UTILITY RESIDENTIAL FINAL
Note: 6/1/2026 - PREVIOUS INSPECTION NOTES

Review History

Department Status Date In Date Out
SW1 COMPLETE 02/25/2026 02/25/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 02/25/2026 02/25/2026
Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM
SW1 COMPLETE 02/12/2026 02/12/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 02/12/2026 02/12/2026
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 HOLD 02/11/2026 02/12/2026
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM No benchmark on formboard survey.
ZON COMPLETE 02/11/2026 02/11/2026
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
SW1 COMPLETE 02/05/2026 02/11/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Approved as noted: Please ensure when submitting grading plans in future that the proposed adjacent lots FFE's are captured. Master Site Plan - has sidewalk on this side of the street.
SW1 HOLD 01/14/2026 01/21/2026
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM - There is no benchmark on grading plan. - Proposed elevations shall be on a 20' grid, this shall incldue existing elevation shot on 10' beyond the propety lines. - There is no community sidewalk for this lot on the approved master plan - Lanai, patios, and walkway shall have a 2% slope away from the foundation. Please feel free to call or email if there are any questions.
BLD COMPLETE 01/14/2026 01/16/2026
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/14/2026 01/15/2026
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
BLD HOLD 12/19/2025 12/29/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Structural plans need to be digitally signed, sealed, and verifiable.
CUSVC COMPLETE 12/19/2025 12/23/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 12/19/2025 12/29/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/19/2025 12/29/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS COMPLETE 12/19/2025 12/22/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
LOCATE COMPLETE 12/19/2025 12/23/2025
Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM
MECH COMPLETE 12/19/2025 12/22/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 12/19/2025 12/23/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM No grading information on attached grading plan.
ZON COMPLETE 12/19/2025 12/22/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 04/08/2026
REINSPECTION RESIDENTIAL ¤40.00 04/06/2026
WATER-METER ¤874.47 02/11/2026
WATER- TURN ON ¤50.00 02/11/2026
ADMINISTRATIVE RESIDENTIAL ¤30.00 02/11/2026
INSPECTION - RESIDENTIAL ¤1,174.25 02/11/2026
PLAN REVIEW - RESIDENTIAL ¤333.06 02/11/2026
FC IMPACT FEE EMS ¤62.00 02/11/2026
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 02/11/2026
FC IMPACT FEE LIBRARY ¤268.00 02/11/2026
FIRE RES IMPACT FEE 10-25 ¤942.00 02/11/2026
WATER METER W/OUT TAP ¤965.03 02/11/2026
PARKS IMPACT FEE 10-25 ¤3,164.00 02/11/2026
RECLAIM WATER PERMIT INSPECTIO ¤40.00 02/11/2026
RSI DRIVEWAY AFTER POUR ¤16.25 02/11/2026
RSE DRIVE PRE POUR INSPECTION ¤32.50 02/11/2026
RSI FIELD SURVEY INSPECTION ¤48.75 02/11/2026
RSI FORMBOARD REVIEW ¤16.25 02/11/2026
RSI PLAN REVIEW NEW ¤48.75 02/11/2026
RSI FNL SURVEY/GRADING CERT ¤48.75 02/11/2026
RSI ROW FINAL INSPECTION ¤16.25 02/11/2026
SCHOOL BOARD IMPACT FEE RES ¤5,450.00 02/11/2026
SURCHARGE FS 533.721 ¤15.37 02/11/2026
SURCHARGE - FS 468.631 ¤23.06 02/11/2026
TRANSP RES IMPACT FEE 10-25 ¤8,407.10 02/11/2026
WASTEWATER PERM INSPECTION ¤80.00 02/11/2026
WASTEWATER PERM REVIEW ¤25.00 02/11/2026
WATER PERMIT REVIEW ¤25.00 02/11/2026
SITE PLAN 30 ¤30.00 02/11/2026
Fees Total Due: ¤0.00 Total Paid: ¤22,483.84