I want to search for...
Permit #2025120726
Permit Details
Status: COED
| Parcel Id: 07-11-31-7058-00100-0240 |
| CONDITIONED SPACE: 1333 sqft |
| GARAGE: 406 sqft |
| OPENED PORCH (WITH ROOF) : 222 sqft |
| Total Square Footage: 1961 sqft |
| Block: 00100 |
| Subdivision: 2215 - SECTION 58-SEMINOLE PARK |
| Job Phone: 386-445-9009 |
| Location Address: 19 SENSENEY PATH |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/31/2025 |
| NOC: RECORDED |
| Applicant name: BRIAN ANDREW GAZZOLI |
| Owner: SEAGATE HOMES LLC |
|
Address 185 CYPRESS POINT PARKWAY SUITE 7 PALM COAST, FL 32164 |
| Lot: 0240 |
| Contracted Stated Job Value: ¤253,158.00 |
| Job Description: single family home |
| Type: CN |
Contractor
SEAGATE HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
185 CYPRESS POINT PARKWAY Palm Coast, FL 32137 |
SUITE 7 Palm Coast, FL 32137 |
CGC1518372 (Exp: 08/31/2026) | 386-246-6132 |
Sub Contractors
TIMUR ISPARYAN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
3665 SPRINK PARK ROAD JACKSONVILLE , FL 32207 |
CMC1249968 (Exp: 08/31/2026) | 904-245-1818 | 904-337-1910 |
RICHARD H SIMMONS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 1963 BUNNELL, FL 32110 |
ES12001217 (Exp: 08/31/2026) | 386-437-0607 | 386-437-1847 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
CHAD DAVID GRESSANI
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2640 BROOKSHIRE CIRCLE MELBOURNE, FL 32904 |
CCC1327235 (Exp: 08/31/2026) | 321-288-6415 | 321-729-8997 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL INSPECTION | 06/03/2026 | APPROVED | FSLADISH |
| Note: 6/3/26 CITY OF PALM COAST MINIMUM STANDARDS ARE MET AT THE TIME OF THIS INSPECTION. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. 6/1/2026 - PREVIOUS INSPECTION NOTES 6/1/26 YOU ARE REQUIRED TO CLEAN OUT CULVERT ENDS TO ENSURE DRAINAGE FLOW. YOR LEFT SIDE NEAR CULVERT MITERED END HAS WASHED IN SOME AND NEEDS TO BE CORRECTED. SEE PHOTO FOR REFERENCE. _____________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 5/27/26 THIS IS A DUPLICATE INSPECTION REQUEST. THIS LDAGC WAS APPROVED YESTERDAY 5/26/26. I AM APPROVING AS NOTED. | |||
| U -UTILITY RESIDENTIAL FINAL | 06/01/2026 | FINAL APPROVED | BHAINES |
| U-CROSS CONNECTION | 06/01/2026 | APPROVED - AS NOTED | BHAINES |
| Note: No CC | |||
| ROW - FINAL APRON (AFTER POUR) | 06/01/2026 | APPROVED | FSLADISH |
| Note: 6/1/26 AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ______________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 5/27/26 THIS IS A DUPLICATE INSPECTION REQUEST. THIS LDAGC WAS APPROVED YESTERDAY 5/26/26. I AM APPROVING AS NOTED. | |||
| ROW - FINAL INSPECTION | 06/01/2026 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 6/1/26 YOU ARE REQUIRED TO CLEAN OUT CULVERT ENDS TO ENSURE DRAINAGE FLOW. YOR LEFT SIDE NEAR CULVERT MITERED END HAS WASHED IN SOME AND NEEDS TO BE CORRECTED. SEE PHOTO FOR REFERENCE. _____________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 5/27/26 THIS IS A DUPLICATE INSPECTION REQUEST. THIS LDAGC WAS APPROVED YESTERDAY 5/26/26. I AM APPROVING AS NOTED. | |||
| BLD - BUILDING FINAL | 06/01/2026 | APPROVED | CVANSTRAHLEN |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/27/2026 | APPROVED - AS NOTED | FSLADISH |
| Note: 5/27/26 THIS IS A DUPLICATE INSPECTION REQUEST. THIS LDAGC WAS APPROVED YESTERDAY 5/26/26. I AM APPROVING AS NOTED. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/26/2026 | APPROVED | FSLADISH |
| Note: 5/26/26 BASED ON THE ENGINEER SIGNED AND SEALED LGADC MEETING THE COPC MINIMUM REQUIREMENTS AT THE TIME OF THIS INSPECTION, I AM APPROVING THIS DOCUMENT. Effective 3/25/26, the ROW Field Survey requirement is no longer in effect for Final Lot Grading and Drainage Certification for new construction on subdivision and infill lots. All Final Lot Grading and Drainage Certificates for these projects will now be reviewed and approved only in the office. Field verification for the ROW-FIELD SURVEY will no longer be required as part of the standard approval process for these permit types. 5/20/2026 - PREVIOUS INSPECTION NOTES 5/20/26 YOU ARE REQUIRED TO PROVIDE THE FFE ON THE IMPROVED LOT DIRECTLY BEHIND YOU. Finished Floor Elevations (FFE): Section 300.01 B(2) V-15 Finished Floor Elevations (FFE): 2) Finished Floor Elevation (FFE) of the living area of all improved structures on adjacent | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/20/2026 | Disapproved - NO FEE | FSLADISH |
| Note: 5/20/26 YOU ARE REQUIRED TO PROVIDE THE FFE ON THE IMPROVED LOT DIRECTLY BEHIND YOU. Finished Floor Elevations (FFE): Section 300.01 B(2) V-15 Finished Floor Elevations (FFE): 2) Finished Floor Elevation (FFE) of the living area of all improved structures on adjacent | |||
| ROW- PRE-APRON (PRE-POUR) | 04/20/2026 | APPROVED | PFLANAGAN |
| Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ELECTRIC - EARLY POWER | 04/14/2026 | APPROVED | RMARTIN |
| DRYWALL NAILING | 03/12/2026 | APPROVED | KSANDOE |
| INSULATION | 03/09/2026 | APPROVED | CVANSTRAHLEN |
| Note: Inspector Notes from Inspection 2420 *** NOTES ADDED BY CVANSTRAHLEN 3/5/2026 9:31:48 AM *** Please fix #2-exhausted master bathroom missing support Flex duct connection #3-bathtub need fill water to top of over flow Please fix items before next inspection #1-FBCR P2605.1-PIPE SUPPORT PEX 32" HORIZONTAL 10 FOOT VERTICAL CPVC UP TO 1" - 3 FEET HORIZONTAL, 10 FEET VERTICAL CPVC 1 1/4" AND UP - 4 FEET HORIZONTAL, 10 FEET VERTICAL PVC 4 FOOT HORIZONTAL, 10 FEET VERTICAL ( laundry and master bathroom ) | |||
| GRAVITY SEWER TEST | 03/09/2026 | APPROVED | KSANDOE |
| SEWER TIE IN | 03/09/2026 | APPROVED | KSANDOE |
| LATH/BRICK/ WATER BARRIER | 03/06/2026 | APPROVED - AS NOTED | CVANSTRAHLEN |
| Note: Will check previous note on insulation inspection Inspector Notes from Inspection 2420 *** NOTES ADDED BY CVANSTRAHLEN 3/5/2026 9:31:48 AM *** Please fix #2-exhausted master bathroom missing support Flex duct connection #3-bathtub need fill water to top of over flow Please fix items before next inspection #1-FBCR P2605.1-PIPE SUPPORT PEX 32" HORIZONTAL 10 FOOT VERTICAL CPVC UP TO 1" - 3 FEET HORIZONTAL, 10 FEET VERTICAL CPVC 1 1/4" AND UP - 4 FEET HORIZONTAL, 10 FEET VERTICAL PVC 4 FOOT HORIZONTAL, 10 FEET VERTICAL ( laundry and master bathroom ) | |||
| ALL ROUGH | 03/05/2026 | APPROVED - AS NOTED | CVANSTRAHLEN |
| Note: *** NOTES ADDED BY CVANSTRAHLEN 3/5/2026 9:31:48 AM *** Please fix #2-exhausted master bathroom missing support Flex duct connection #3-bathtub need fill water to top of over flow Please fix items before next inspection #1-FBCR P2605.1-PIPE SUPPORT PEX 32" HORIZONTAL 10 FOOT VERTICAL CPVC UP TO 1" - 3 FEET HORIZONTAL, 10 FEET VERTICAL CPVC 1 1/4" AND UP - 4 FEET HORIZONTAL, 10 FEET VERTICAL PVC 4 FOOT HORIZONTAL, 10 FEET VERTICAL ( laundry and master bathroom ) | |||
| ROOF VALLEY & METAL | 02/26/2026 | APPROVED | KSANDOE |
| WALL SHEATHING | 02/24/2026 | APPROVED | CVANSTRAHLEN |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/24/2026 | APPROVED | CVANSTRAHLEN |
| TIE BEAM / LINTEL | 02/10/2026 | APPROVED | BTAYLOR |
| MONOLITHIC SLAB | 01/30/2026 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/28/2026 | APPROVED | BTAYLOR |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 01/27/2026 | APPROVED | RRICKS |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 01/20/2026 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 01/08/2026 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 01/27/2026 | 01/27/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/27/2026 | 01/27/2026 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/20/2026 | 01/20/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 12/29/2025 | 01/15/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/22/2025 | 12/30/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 12/22/2025 | 12/30/2025 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 12/22/2025 | 12/29/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/22/2025 | 12/29/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 12/22/2025 | 12/22/2025 |
| LOCATE | COMPLETE | 12/22/2025 | 12/26/2025 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/22/2025 | 12/23/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/22/2025 | 12/30/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/22/2025 | 12/23/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| RSI REINSPECTION 1 | ¤35.00 | 06/03/2026 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 12/31/2025 |
| SCHOOL BOARD IMPACT FEE RES | ¤5,450.00 | 12/31/2025 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,385.00 | 12/31/2025 |
| SURCHARGE FS 533.721 | ¤9.90 | 12/31/2025 |
| SURCHARGE - FS 468.631 | ¤14.85 | 12/31/2025 |
| SW ENG RES REVIEW 240 | ¤240.00 | 12/31/2025 |
| WATER METER W/ TAP | ¤2,326.93 | 12/31/2025 |
| TRANSP RES IMPACT FEE 10-25 | ¤5,025.41 | 12/31/2025 |
| SEWER CREDIT | (¤1,342.00) | 12/31/2025 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 12/31/2025 |
| WASTEWATER PERM REVIEW | ¤25.00 | 12/31/2025 |
| SEWER CAPITAL FACILITY | ¤4,415.00 | 12/31/2025 |
| WATER CAPITAL FACILITY FEE | ¤3,790.49 | 12/31/2025 |
| WATER PERMIT REVIEW | ¤25.00 | 12/31/2025 |
| WATER MAIN EXTENSION IMPACT | ¤917.27 | 12/31/2025 |
| SITE PLAN 30 | ¤30.00 | 12/31/2025 |
| WATER- TURN ON | ¤50.00 | 12/31/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 12/31/2025 |
| INSPECTION - RESIDENTIAL | ¤748.00 | 12/31/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤212.16 | 12/31/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 12/31/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 12/31/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 12/31/2025 |
| FIRE RES IMPACT FEE 10-25 | ¤942.00 | 12/31/2025 |
| PARKS IMPACT FEE 10-25 | ¤3,164.00 | 12/31/2025 |
| RSI DRIVEWAY AFTER POUR | ¤16.25 | 12/31/2025 |
| RSE DRIVE PRE POUR INSPECTION | ¤32.50 | 12/31/2025 |
| RSI FIELD SURVEY INSPECTION | ¤48.75 | 12/31/2025 |
| RSI FORMBOARD REVIEW | ¤16.25 | 12/31/2025 |
| RSI PLAN REVIEW NEW | ¤48.75 | 12/31/2025 |
| RSI FNL SURVEY/GRADING CERT | ¤48.75 | 12/31/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤29,349.51 |