Permit #2025120734
Permit Details
Status: INSPECT
| Parcel Id: 07-11-31-7007-00470-0530 |
| CONDITIONED SPACE: 1849 sqft |
| GARAGE: 480 sqft |
| OPENED PORCH (WITH ROOF) : 168 sqft |
| OPENED PORCH (WITH ROOF) : 80 sqft |
| Total Square Footage: 2577 sqft |
| Block: 00470 |
| Subdivision: 2185 - SECTION 7-FLORIDA PARK |
| Job Phone: 631-929-5500 |
| Location Address: 140 FRONTIER DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/10/2026 |
| NOC: RECORDED |
| Applicant name: NICHOLAS JOHN ZOUMAS |
| Owner: ASZ HOMES LLC |
|
Address 45 NEW YORK 25A SHOREHAM, NY 11786 |
| Lot: 0530 |
| Contracted Stated Job Value: ¤170,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
JNS CONTRACTING FLORIDA, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
Sub Contractors
NICHOLAS JOHN ZOUMAS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
JASON LEE JAMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N WESTMONTE DR SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
CFC1430061 (Exp: 08/31/2026) | 407-404-4000 |
JASON LEE JAMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N WESTMONTE DR SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
CAC1820196 (Exp: 08/31/2026) | 407-404-4000 |
ANTHONY OKEITH FENNELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N. WESTMONTE DR, SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
EC13011194 (Exp: 08/31/2026) | 407-404-4000 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW- PRE-APRON (PRE-POUR) | 06/08/2026 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. WOOD CONTROL JOINTS ARE PROHIBITED IN THE RIGHT-OF-WAY. SAWCUT SHALL BE PROVIDED AT THE EDGE OF ROW AND EVERY 12' THEREAFTER, OR A MINIMUM OF 2 SAWCUTS WHICHEVER IS GREATER" 6/5/2026 - PREVIOUS INSPECTION NOTES 06-05-26 TPOLACEK*** MITER OPENING AT EDGE OF DRIVEWAY MUST BE A MINIMUM OF 18" FROM DRIVEWAY EDGE BOARD TO SIDE OF CULVERT AS SHOWN IN DETAIL ATTACHED IN PHOTOS. BOTH SIDES ON BACK SIDE OF CULVERT ONLY HAVE 14". CULVERT IS SLIGHTLY BACK PITCHED AGAINST THE FLOW. PLEASE RAISE THE LEFT SIDE 1/2" BEFORE NEXT INSPECTION. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/05/2026 | Disapproved - NO FEE | TPOLACEK |
| Note: 06-05-26 TPOLACEK*** MITER OPENING AT EDGE OF DRIVEWAY MUST BE A MINIMUM OF 18" FROM DRIVEWAY EDGE BOARD TO SIDE OF CULVERT AS SHOWN IN DETAIL ATTACHED IN PHOTOS. BOTH SIDES ON BACK SIDE OF CULVERT ONLY HAVE 14". CULVERT IS SLIGHTLY BACK PITCHED AGAINST THE FLOW. PLEASE RAISE THE LEFT SIDE 1/2" BEFORE NEXT INSPECTION. | |||
| DRYWALL NAILING | 05/26/2026 | APPROVED | MCONTRYMAN |
| INSULATION | 05/21/2026 | APPROVED | MCONTRYMAN |
| Note: 5/20/2026 - PREVIOUS INSPECTION NOTES 5/20/26 Previous notes not rectified 1. Areas missing fire foam for electrical wires FBC R302.11 -shared wall in front middle bedroom -washing machine vent pipe 3. Missing baffles in areas where batt insulation was installed FBC EC R303.2.1 & R402.2.3 4. Check all baffles installed to ensure proper 1" clearance for air flow exists FBC EC R303.2.1 & R402.2.3 5/18/2026 - PREVIOUS INSPECTION NOTES 5/18/26 1. Multiple areas missign fire foam for electrical wires FBC R302.11 2. Door and windows missing fire foam FBC R302.11 3. Missing baffles in areas where batt insulation was installed FBC EC R303.2.1 & R402.2.3 4. Check all baffles installed to ensure proper 1" clearance for air flow exists FBC EC R303.2.1 & R402.2.3 | |||
| LATH/BRICK/ WATER BARRIER | 05/21/2026 | APPROVED | MCONTRYMAN |
| Note: 5/12/2026 - PREVIOUS INSPECTION NOTES 5/12/26 1. Large hole in block by meter/main, as well as wire holes that need to be prepped on right side | |||
| INSULATION | 05/20/2026 | Disapproved -FEE REQUIRED | MCONTRYMAN |
| Note: 5/20/26 Previous notes not rectified 1. Areas missing fire foam for electrical wires FBC R302.11 -shared wall in front middle bedroom -washing machine vent pipe 3. Missing baffles in areas where batt insulation was installed FBC EC R303.2.1 & R402.2.3 4. Check all baffles installed to ensure proper 1" clearance for air flow exists FBC EC R303.2.1 & R402.2.3 5/18/2026 - PREVIOUS INSPECTION NOTES 5/18/26 1. Multiple areas missign fire foam for electrical wires FBC R302.11 2. Door and windows missing fire foam FBC R302.11 3. Missing baffles in areas where batt insulation was installed FBC EC R303.2.1 & R402.2.3 4. Check all baffles installed to ensure proper 1" clearance for air flow exists FBC EC R303.2.1 & R402.2.3 | |||
| INSULATION | 05/18/2026 | Disapproved -FEE REQUIRED | MCONTRYMAN |
| Note: 5/18/26 1. Multiple areas missign fire foam for electrical wires FBC R302.11 2. Door and windows missing fire foam FBC R302.11 3. Missing baffles in areas where batt insulation was installed FBC EC R303.2.1 & R402.2.3 4. Check all baffles installed to ensure proper 1" clearance for air flow exists FBC EC R303.2.1 & R402.2.3 | |||
| ALL ROUGH | 05/14/2026 | APPROVED | MCONTRYMAN |
| Note: 5/8/2026 - PREVIOUS INSPECTION NOTES 5/8/26 1. 5' head test empty FBCR P2503.7 2. No water pressure in lines FBCR P2503.5 3. Product approvals not on site for inspection FBC(A) 107.3.1 4. Feed wire for kitchen island not installed 5. Energy calcs need to be revised, and approved, to show ducts for return air instead of vents over doorways for circulation air FBC(A) 107.4 6. Wires above panel in garage are to be secured no more than 12" from top of panel NEC 334.30 | |||
| ELECTRIC-TUG | 05/13/2026 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 5/13/26 Email sent to FPL 5/11/2026 - PREVIOUS INSPECTION NOTES 5/11/26 1. Grounding wire strands not all in lug NEC 110.14(A) 5/8/2026 - PREVIOUS INSPECTION NOTES 5/8/26 1. Work incomplete. Job not ready for inspection | |||
| LATH/BRICK/ WATER BARRIER | 05/12/2026 | Disapproved - NO FEE | MCONTRYMAN |
| Note: 5/12/26 1. Large hole in block by meter/main, as well as wire holes that need to be prepped on right side | |||
| ELECTRIC-TUG | 05/11/2026 | Disapproved - NO FEE | MCONTRYMAN |
| Note: 5/11/26 1. Grounding wire strands not all in lug NEC 110.14(A) 5/8/2026 - PREVIOUS INSPECTION NOTES 5/8/26 1. Work incomplete. Job not ready for inspection | |||
| ALL ROUGH | 05/08/2026 | Disapproved -FEE REQUIRED | MCONTRYMAN |
| Note: 5/8/26 1. 5' head test empty FBCR P2503.7 2. No water pressure in lines FBCR P2503.5 3. Product approvals not on site for inspection FBC(A) 107.3.1 4. Feed wire for kitchen island not installed 5. Energy calcs need to be revised, and approved, to show ducts for return air instead of vents over doorways for circulation air FBC(A) 107.4 6. Wires above panel in garage are to be secured no more than 12" from top of panel NEC 334.30 | |||
| ELECTRIC-TUG | 05/08/2026 | Disapproved - NO FEE | MCONTRYMAN |
| Note: 5/8/26 1. Work incomplete. Job not ready for inspection | |||
| ROOF VALLEY & METAL | 05/04/2026 | APPROVED | MCONTRYMAN |
| Note: Inspector Notes from Inspection 2460 4/30/26 1. Truss A10, furthest to the right side, needs to have an appropriate repair due to knots in the upright on both ends | |||
| U-CROSS CONNECTION | 05/04/2026 | APPROVED | BWRIGHT |
| WALL SHEATHING | 04/30/2026 | APPROVED | MCONTRYMAN |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/30/2026 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 4/30/26 1. Truss A10, furthest to the right side, needs to have an appropriate repair due to knots in the upright on both ends | |||
| TIE BEAM / LINTEL | 04/13/2026 | APPROVED | MCONTRYMAN |
| Note: Inspector Notes from Inspection 2250 3/31/26 Met contractor on site, along with Chief Building Inspector, Robert Martin. Verified footer depth on right side of slab to be 30" deep. This should give the proper grading/drop, while maintaining 12" of footer burial | |||
| MONOLITHIC SLAB | 03/31/2026 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 3/31/26 Met contractor on site, along with Chief Building Inspector, Robert Martin. Verified footer depth on right side of slab to be 30" deep. This should give the proper grading/drop, while maintaining 12" of footer burial | |||
| MONOLITHIC SLAB | 03/30/2026 | APPROVED | MCONTRYMAN |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/27/2026 | APPROVED | MCONTRYMAN |
| Note: 3/26/2026 - PREVIOUS INSPECTION NOTES 3/26/26 1. Pex/Poly lines need to be sleeved when crossing each other or other plumbing for protection P2906.10.2 | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/26/2026 | Disapproved - NO FEE | MCONTRYMAN |
| Note: 3/26/26 1. Pex/Poly lines need to be sleeved when crossing each other or other plumbing for protection P2906.10.2 | |||
| FORMBOARD SURVEY (OFFICE USE ONLY) | 03/25/2026 | APPROVED - AS NOTED | RRICKS |
| Note: Approved as noted: Michelle Yannucci and William Zoumas are aware that, due to the higher FFE, this home must have a deepened footer on the right side and rear to comply with the 4:1 slope and grading requirements of the approved grading plan. If these requirements are not met, the resulting slopes will exceed 4:1 and the site will not comply with grading requirements. | |||
| GRAVITY SEWER TEST | 03/19/2026 | APPROVED | MCONTRYMAN |
| SEWER TIE IN | 03/19/2026 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 3/19/26 1. Remove porta jon from swale and keep swale clear at all times during construction FBC 3303.5 | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 03/18/2026 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 03/13/2026 | APPROVED | ISANDERSON |
| ROW- PROJECT STATUS | |||
| Note: 4/9/2026 RRicks Due to the unique conditions of this lot, a site visit will be required prior to sod installation to verify compliance with COPC standards, followed by a field inspection after the sod has been installed. | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | |||
| Note: 4/9/2026 RRicks Additionally, due to the unique conditions of this lot, a site visit will be required prior to sod installation to verify compliance with COPC standards, followed by a field inspection after the sod has been installed. | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | |||
| BLD - BUILDING FINAL | |||
| ELECTRIC - EARLY POWER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 05/12/2026 | 05/13/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 05/12/2026 | 05/12/2026 |
| Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/25/2026 | 03/25/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/25/2026 | 03/25/2026 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/25/2026 | 03/25/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Michelle Yannucci and William Zoumas are aware that, due to the higher FFE, this home must have a deepened footer on the right side and rear to comply with the 4:1 slope and grading requirements of the approved grading plan. If these requirements are not met, the resulting slopes will exceed 4:1 and the site will not comply with grading requirements. | |||
| SW1 | COMPLETE | 03/24/2026 | 03/24/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Note: FFE approved after conversations with the SW Engineer, Carmelo. The FFE is higher, but we are requiring deepened footers to ensure there are no slopes greater than 4:1 on the right side of the home and neither lot is negatively impacted. If there are any questions or concerns, please feel free to call Rodney Ricks 386-986-4726. | |||
| BLD | COMPLETE | 03/18/2026 | 03/18/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/24/2026 | 02/24/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 02/18/2026 | 02/24/2026 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM My apologies, after further review the proposed elevations in the back will need to be adjusted to keep water from flowing across the back of the yard. I spoke with Casey and she is aware of the changes. | |||
| BLD | COMPLETE | 02/18/2026 | 02/24/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 01/28/2026 | 02/02/2026 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Based on the information provided, this lot is being negatively impacted by the lot on the left across the entire back yard. Please make revisions as needed. Please feel free to call me at 386-986-4726. | |||
| BLD | COMPLETE | 01/15/2026 | 01/15/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 01/15/2026 | 01/22/2026 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM - Based on the proposed elevations, too much water is being directed to the back and to one side of the home. Please revise grading plan where drainage flows from back to front of both side of the home preventing one side being overloaded with water. - Please feel free to reach out if there are any questions or concerns. | |||
| BLD | COMPLETE | 01/15/2026 | 01/15/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/15/2026 | 01/16/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| BLD | HOLD | 01/09/2026 | 01/09/2026 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. OK 2. OK 3. Geotech needs to be digitally verifiable. | |||
| MECH | COMPLETE | 01/08/2026 | 01/09/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/08/2026 | 01/08/2026 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | HOLD | 01/08/2026 | 01/09/2026 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. Product Approval FL# 15332.2 -R9 not valid 2. Truss plan packet cover sheet or first page needs include the design professional of record (building design engineer or architect) approval stamp indicating acceptance and approval of truss design (Not wet seal) 3. Geotech needs to be digitally verifiable. 2ND REQUEST | |||
| SW1 | HOLD | 01/08/2026 | 01/15/2026 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Repeat comment - No benchmark on grading plan | |||
| SWALE | COMPLETE | 12/29/2025 | 01/26/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| BLD | HOLD | 12/22/2025 | 12/30/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. Product Approval FL# 15332.2 -R9 not valid 2. Truss plan packet cover sheet or first page needs include the design professional of record (building design engineer or architect) approval stamp indicating acceptance and approval of truss design (Not wet seal) 3. Geotech needs to be digitally verifiable. | |||
| CUSVC | COMPLETE | 12/22/2025 | 12/30/2025 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 12/22/2025 | 12/29/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/22/2025 | 12/29/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 12/22/2025 | 12/23/2025 |
| LOCATE | COMPLETE | 12/22/2025 | 12/26/2025 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| MECH | HOLD | 12/22/2025 | 12/23/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Design location on Energy calcs and heatload need to be Daytona Beach | |||
| SW1 | HOLD | 12/22/2025 | 12/31/2025 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM - Will have COPC survey confirm elevations due FFE differences. - No benchmark on Grading Plan. - 200.01A.1.b(15) Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement. Based on the information provided this lot is being greatly impacted by lot 54 and lot 28. | |||
| ZON | HOLD | 12/22/2025 | 12/23/2025 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Eleevation plan: please add banding all around gargage door as it also faces the ROW. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| FC IMPACT FEE EMS | ¤62.00 | 03/10/2026 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 03/10/2026 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 03/10/2026 |
| FIRE RES IMPACT FEE 10-25 | ¤942.00 | 03/10/2026 |
| PARKS IMPACT FEE 10-25 | ¤3,164.00 | 03/10/2026 |
| RSI DRIVEWAY AFTER POUR | ¤16.25 | 03/10/2026 |
| RSE DRIVE PRE POUR INSPECTION | ¤32.50 | 03/10/2026 |
| RSI FIELD SURVEY INSPECTION | ¤48.75 | 03/10/2026 |
| RSI FORMBOARD REVIEW | ¤16.25 | 03/10/2026 |
| RSI PLAN REVIEW NEW | ¤48.75 | 03/10/2026 |
| RSI FNL SURVEY/GRADING CERT | ¤48.75 | 03/10/2026 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 03/10/2026 |
| SCHOOL BOARD IMPACT FEE RES | ¤5,450.00 | 03/10/2026 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,385.00 | 03/10/2026 |
| SURCHARGE FS 533.721 | ¤13.26 | 03/10/2026 |
| SURCHARGE - FS 468.631 | ¤19.88 | 03/10/2026 |
| SW ENG RES REVIEW 240 | ¤240.00 | 03/10/2026 |
| WATER METER W/ TAP | ¤2,326.93 | 03/10/2026 |
| TRANSP RES IMPACT FEE 10-25 | ¤6,970.73 | 03/10/2026 |
| SEWER CREDIT | (¤2,465.75) | 03/10/2026 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 03/10/2026 |
| WASTEWATER PERM REVIEW | ¤25.00 | 03/10/2026 |
| SEWER CAPITAL FACILITY | ¤4,415.00 | 03/10/2026 |
| WATER CAPITAL FACILITY FEE | ¤3,790.49 | 03/10/2026 |
| WATER PERMIT REVIEW | ¤25.00 | 03/10/2026 |
| WATER MAIN EXTENSION IMPACT | ¤917.27 | 03/10/2026 |
| SITE PLAN 30 | ¤30.00 | 03/10/2026 |
| WATER- TURN ON | ¤50.00 | 03/10/2026 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/10/2026 |
| INSPECTION - RESIDENTIAL | ¤1,009.25 | 03/10/2026 |
| PLAN REVIEW - RESIDENTIAL | ¤286.26 | 03/10/2026 |
| PLAN REVIEW - REVISION | ¤32.50 | |
| REINSPECTION RESIDENTIAL | ¤40.00 | |
| REINSPECTION RESIDENTIAL | ¤40.00 | |
| REINSPECTION RESIDENTIAL | ¤40.00 | |
| Fees | Total Due: ¤152.50 | Total Paid: ¤30,479.82 |