Permit #2026010127

Permit Details

Status: INSPECT

Parcel Id: 07-11-31-7063-RP0J2-0000
Block: RP J2
Subdivision: -
Job Phone: (386)931-7331
Location Address: 1071 BELLE TERRE BLVD
Type: CSD - COMMERCIAL SITE DEVELOPMENT
Issue Date: 01/22/2026
NOC: Unknown
Applicant name: SCOTT DALE SOWERS
Owner: JRB-PC LLC

Address

3948 3RD STREET SOUTH

JACKSONVILLE BEACH, FL 32250

Address

SUITE 35

JACKSONVILLE BEACH, FL 32250

Lot: 0000
Job Description: SITE PERMIT: DCI SITE IMPROVEMENTS
Type: CN

Contractor

S E CLINE CONSTRUCTION, INC
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 354425

PALM COAST, FL 32137

CGC061947 (Exp: 08/31/2028) (386)446-6426 (386)446-6481

Inspection History

Type Request Date Result Inspector
UC-DRAINAGE PIPE PLACEMENT/LAMPING 05/13/2026 PARTIALLY APPROVED LFITZGERALD
Note: 5/8/2026 - PREVIOUS INSPECTION NOTES CHECKED TWO MES AND PIPE ALONG BELLE TERRE JUST NORTH OF CONCSTRUCTION ENTRANCE, CHECK STRUCTURE #7 AND MES INTO POND SW CORNER. 5/1/2026 - PREVIOUS INSPECTION NOTES CHECKED FES STRUCTURES ALONG SR100 SIDE now set s-6 heading to s5
UC-DRAINAGE STRUCT PLACMNT 05/13/2026 PARTIALLY APPROVED LFITZGERALD
Note: 5/8/2026 - PREVIOUS INSPECTION NOTES CHECKED TWO MES AND PIPE ALONG BELLE TERRE JUST NORTH OF CONCSTRUCTION ENTRANCE, CHECK STRUCTURE #7 AND MES INTO POND SW CORNER. 5/5/2026 - PREVIOUS INSPECTION NOTES 5/1/2026 - PREVIOUS INSPECTION NOTES CHECKED FES STRUCTURES ALONG SR100 4 sets of FES'S WITH 1.5 STICK RCP now set s-7 and s-6 heading to 5
UC-DRAINAGE STRUCT PLACMNT 05/08/2026 PARTIALLY APPROVED TPOLACEK
Note: CHECKED TWO MES AND PIPE ALONG BELLE TERRE JUST NORTH OF CONCSTRUCTION ENTRANCE, CHECK STRUCTURE #7 AND MES INTO POND SW CORNER. 5/5/2026 - PREVIOUS INSPECTION NOTES 5/1/2026 - PREVIOUS INSPECTION NOTES CHECKED FES STRUCTURES ALONG SR100 4 sets of FES'S WITH 1.5 STICK RCP
UC-DRAINAGE PIPE PLACEMENT/LAMPING 05/08/2026 PARTIALLY APPROVED TPOLACEK
Note: CHECKED TWO MES AND PIPE ALONG BELLE TERRE JUST NORTH OF CONCSTRUCTION ENTRANCE, CHECK STRUCTURE #7 AND MES INTO POND SW CORNER. 5/1/2026 - PREVIOUS INSPECTION NOTES CHECKED FES STRUCTURES ALONG SR100 SIDE
UC-DRAINAGE STRUCT PLACMNT 05/05/2026 PARTIALLY APPROVED LFITZGERALD
Note: 5/1/2026 - PREVIOUS INSPECTION NOTES CHECKED FES STRUCTURES ALONG SR100 4 sets of FES'S WITH 1.5 STICK RCP
UC-CONSTRUCTION ENTRANCE 05/05/2026 PARTIALLY APPROVED LFITZGERALD
Note: 4/10/2026 - PREVIOUS INSPECTION NOTES 2/20/2026 - PREVIOUS INSPECTION NOTES base installed from EOP TO propoerty line then 2in rock/culvert pipe (c900) installed in row swale LIMEROCK now wet from wedensday rains and Thursaday inspection found limerock materiasoils in both lanes leading into Belle Terre-spoke with CLINE-CHUCK D,on thursday still soils on roadway today-Friday-informed again to clean up road(discussed type of material to use between roadway and the rock Soil Traping Device at startof construction making it known if limerock it will get messy and not perform well for accessibility traveling across currently dome mats between sidewalk and roadway-working good and compacted base in sidewalk firm and traversable for mix use
U-PUMP STATION PRE-INSTALLATION 04/30/2026 PARTIALLY APPROVED BHAINES
Note: In Progress
UC-DRAINAGE STRUCT PLACMNT 04/30/2026 PARTIALLY APPROVED TPOLACEK
Note: CHECKED FES STRUCTURES ALONG SR100
UC-DRAINAGE PIPE PLACEMENT/LAMPING 04/30/2026 PARTIALLY APPROVED TPOLACEK
Note: CHECKED FES STRUCTURES ALONG SR100 SIDE
UC-CONSTRUCTION ENTRANCE 04/10/2026 PARTIALLY APPROVED LFITZGERALD
Note: 2/20/2026 - PREVIOUS INSPECTION NOTES base installed from EOP TO propoerty line then 2in rock/culvert pipe (c900) installed in row swale LIMEROCK now wet from wedensday rains and Thursaday inspection found limerock materiasoils in both lanes leading into Belle Terre-spoke with CLINE-CHUCK D,on thursday still soils on roadway today-Friday-informed again to clean up road(discussed type of material to use between roadway and the rock Soil Traping Device at startof construction making it known if limerock it will get messy and not perform well for accessibility traveling across
UC-CONSTRUCTION ENTRANCE 02/20/2026 PARTIALLY APPROVED LFITZGERALD
Note: base installed from EOP TO propoerty line then 2in rock/culvert pipe (c900) installed in row swale
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 02/17/2026 PARTIALLY APPROVED JMYERS
Note: 2/17/26 EROSION CONTROL MEASURES INSTALLED PER SWPPP. FOLLOW UP INSPECTION NEXT MONTH.
PLAN - PRE-CON 386-986-3750 01/27/2026 APPROVED - AS NOTED LFITZGERALD
Note: city staff-building-utility-myself along with Cline staff along with Sean-DCI-developer-
PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY
IRRIGATION AFFIDAVIT
LDSC-IRRIGATION FINAL
LDSC- LANDSCAPE / IRRIGATION AS-BUILT
LDSC- LANDSCAPE FINAL
U-SEWER FORCE MAIN INSTALL/TESTING
U-WATER SERVICE INSTALLATION
U-GRAVITY SEWER INSTALL/TESTING
U-WATER MAIN DISINFECTION
U-WATER MAIN DISINFECTION SAMPLING
GEOTECH-SITE PREP ENG CERTIFICATIO (OFFICE USE ONLY)
BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS
BLD- ADA PARKING
BLD- ADA SIGNAGECONTROL
BLD- ADA VEHICULAR WAY
BLD - UNDERGROUND SITE LIGHTING CONDUITS
BLD - SITE LIGHTING-PLACEMENT/FOUNDATION
BLD - SITE LIGHTING-POLE SET/FIXTURE
MAINT BOND ACCEPTANCE (OFFICE)
CLOSE OUT DOCUMENTS
UC-CONSTRUCTION ENTRANCE
Note: 5/5/2026 - PREVIOUS INSPECTION NOTES 4/10/2026 - PREVIOUS INSPECTION NOTES 2/20/2026 - PREVIOUS INSPECTION NOTES base installed from EOP TO propoerty line then 2in rock/culvert pipe (c900) installed in row swale LIMEROCK now wet from wedensday rains and Thursaday inspection found limerock materiasoils in both lanes leading into Belle Terre-spoke with CLINE-CHUCK D,on thursday still soils on roadway today-Friday-informed again to clean up road(discussed type of material to use between roadway and the rock Soil Traping Device at startof construction making it known if limerock it will get messy and not perform well for accessibility traveling across currently dome mats between sidewalk and roadway-working good and compacted base in sidewalk firm and traversable for mix use
U-PUMP STATION PRE-INSTALLATION
Note: 4/30/2026 - PREVIOUS INSPECTION NOTES In Progress
U-PUMP STATION START-UP
U-GREASE INTERCEPTOR PRE-INSTALLATION
U-GREASE INTERCEPTOR FLOW/DYE TESTED
UC-DRAINAGE PIPE PLACEMENT/LAMPING
Note: 5/13/2026 - PREVIOUS INSPECTION NOTES 5/8/2026 - PREVIOUS INSPECTION NOTES CHECKED TWO MES AND PIPE ALONG BELLE TERRE JUST NORTH OF CONCSTRUCTION ENTRANCE, CHECK STRUCTURE #7 AND MES INTO POND SW CORNER. 5/1/2026 - PREVIOUS INSPECTION NOTES CHECKED FES STRUCTURES ALONG SR100 SIDE now set s-6 heading to s5
U-WATER METER INSTALLATION/VERIFICATION
PROJECT CLOSE OUT MEETING (386-986-3750)
UC-SUBSTANTIAL WALK-THRU
UC- PRELIMINARY AS-BUILTS
UC-FINAL SITE INSPECTION
UC-FINAL SITE STABILIZATION
U - UTILITY COMMERCIAL FINAL
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE
Note: 2/17/2026 - PREVIOUS INSPECTION NOTES 2/17/26 EROSION CONTROL MEASURES INSTALLED PER SWPPP. FOLLOW UP INSPECTION NEXT MONTH.
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL)
UROW-RETENT/DETENT STABILI
UROW- CURBING & GUTTER
U-ROW FINAL
UC-TRAF - MAINT OF TRAFFIC
UC-TRAF - FINAL (SIGN/PAVEMENT MARKING)
WATERMAIN FLUSH & PRESSURE TESTED
FDEP WATERMAIN CLEARANCE
HYDRANT - PAINT / FLOW/VALVE/ RPM
TEMPORARY HYDRANT CONSTRUCTION METER
UC-DRAINAGE STRUCT PLACMNT
Note: 5/13/2026 - PREVIOUS INSPECTION NOTES 5/8/2026 - PREVIOUS INSPECTION NOTES CHECKED TWO MES AND PIPE ALONG BELLE TERRE JUST NORTH OF CONCSTRUCTION ENTRANCE, CHECK STRUCTURE #7 AND MES INTO POND SW CORNER. 5/5/2026 - PREVIOUS INSPECTION NOTES 5/1/2026 - PREVIOUS INSPECTION NOTES CHECKED FES STRUCTURES ALONG SR100 4 sets of FES'S WITH 1.5 STICK RCP now set s-7 and s-6 heading to 5

Review History

Department Status Date In Date Out
DSD COMPLETE 01/22/2026 01/22/2026
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
BLD COMPLETE 01/07/2026 01/07/2026
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
ELEC COMPLETE 01/07/2026 01/08/2026
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
PLENG COMPLETE 01/07/2026 01/08/2026
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
PLLA COMPLETE 01/07/2026 01/07/2026
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
UD1 COMPLETE 01/07/2026 01/08/2026
Note: Released By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM
DSD HOLD 01/07/2026 01/07/2026
Note: Held By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMINISTRATIVE- SITE DEVELOP ¤125.00 01/22/2026
INSPECTION - GENERAL ¤280.00 01/22/2026
SITE DEVELOPMENT ADMIN PLANNIN ¤179.00 01/22/2026
SITE INSPECTION ¤684.00 01/22/2026
SITE PLAN 29 ¤29.00 01/22/2026
Fees Total Due: ¤0.00 Total Paid: ¤1,297.00