I want to search for...
Permit #2026010127
Permit Details
Status: INSPECT
| Parcel Id: 07-11-31-7063-RP0J2-0000 |
| Block: RP J2 |
| Subdivision: - |
| Job Phone: (386)931-7331 |
| Location Address: 1071 BELLE TERRE BLVD |
| Type: CSD - COMMERCIAL SITE DEVELOPMENT |
| Issue Date: 01/22/2026 |
| NOC: Unknown |
| Applicant name: SCOTT DALE SOWERS |
| Owner: JRB-PC LLC |
|
Address 3948 3RD STREET SOUTH JACKSONVILLE BEACH, FL 32250 |
|
Address SUITE 35 JACKSONVILLE BEACH, FL 32250 |
| Lot: 0000 |
| Job Description: SITE PERMIT: DCI SITE IMPROVEMENTS |
| Type: CN |
Contractor
S E CLINE CONSTRUCTION, INC
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 354425 PALM COAST, FL 32137 |
CGC061947 (Exp: 08/31/2028) | (386)446-6426 | (386)446-6481 |
Inspection History
| Type | Request Date | Result | Inspector |
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 05/13/2026 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 5/8/2026 - PREVIOUS INSPECTION NOTES CHECKED TWO MES AND PIPE ALONG BELLE TERRE JUST NORTH OF CONCSTRUCTION ENTRANCE, CHECK STRUCTURE #7 AND MES INTO POND SW CORNER. 5/1/2026 - PREVIOUS INSPECTION NOTES CHECKED FES STRUCTURES ALONG SR100 SIDE now set s-6 heading to s5 | |||
| UC-DRAINAGE STRUCT PLACMNT | 05/13/2026 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 5/8/2026 - PREVIOUS INSPECTION NOTES CHECKED TWO MES AND PIPE ALONG BELLE TERRE JUST NORTH OF CONCSTRUCTION ENTRANCE, CHECK STRUCTURE #7 AND MES INTO POND SW CORNER. 5/5/2026 - PREVIOUS INSPECTION NOTES 5/1/2026 - PREVIOUS INSPECTION NOTES CHECKED FES STRUCTURES ALONG SR100 4 sets of FES'S WITH 1.5 STICK RCP now set s-7 and s-6 heading to 5 | |||
| UC-DRAINAGE STRUCT PLACMNT | 05/08/2026 | PARTIALLY APPROVED | TPOLACEK |
| Note: CHECKED TWO MES AND PIPE ALONG BELLE TERRE JUST NORTH OF CONCSTRUCTION ENTRANCE, CHECK STRUCTURE #7 AND MES INTO POND SW CORNER. 5/5/2026 - PREVIOUS INSPECTION NOTES 5/1/2026 - PREVIOUS INSPECTION NOTES CHECKED FES STRUCTURES ALONG SR100 4 sets of FES'S WITH 1.5 STICK RCP | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 05/08/2026 | PARTIALLY APPROVED | TPOLACEK |
| Note: CHECKED TWO MES AND PIPE ALONG BELLE TERRE JUST NORTH OF CONCSTRUCTION ENTRANCE, CHECK STRUCTURE #7 AND MES INTO POND SW CORNER. 5/1/2026 - PREVIOUS INSPECTION NOTES CHECKED FES STRUCTURES ALONG SR100 SIDE | |||
| UC-DRAINAGE STRUCT PLACMNT | 05/05/2026 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 5/1/2026 - PREVIOUS INSPECTION NOTES CHECKED FES STRUCTURES ALONG SR100 4 sets of FES'S WITH 1.5 STICK RCP | |||
| UC-CONSTRUCTION ENTRANCE | 05/05/2026 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 4/10/2026 - PREVIOUS INSPECTION NOTES 2/20/2026 - PREVIOUS INSPECTION NOTES base installed from EOP TO propoerty line then 2in rock/culvert pipe (c900) installed in row swale LIMEROCK now wet from wedensday rains and Thursaday inspection found limerock materiasoils in both lanes leading into Belle Terre-spoke with CLINE-CHUCK D,on thursday still soils on roadway today-Friday-informed again to clean up road(discussed type of material to use between roadway and the rock Soil Traping Device at startof construction making it known if limerock it will get messy and not perform well for accessibility traveling across currently dome mats between sidewalk and roadway-working good and compacted base in sidewalk firm and traversable for mix use | |||
| U-PUMP STATION PRE-INSTALLATION | 04/30/2026 | PARTIALLY APPROVED | BHAINES |
| Note: In Progress | |||
| UC-DRAINAGE STRUCT PLACMNT | 04/30/2026 | PARTIALLY APPROVED | TPOLACEK |
| Note: CHECKED FES STRUCTURES ALONG SR100 | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 04/30/2026 | PARTIALLY APPROVED | TPOLACEK |
| Note: CHECKED FES STRUCTURES ALONG SR100 SIDE | |||
| UC-CONSTRUCTION ENTRANCE | 04/10/2026 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 2/20/2026 - PREVIOUS INSPECTION NOTES base installed from EOP TO propoerty line then 2in rock/culvert pipe (c900) installed in row swale LIMEROCK now wet from wedensday rains and Thursaday inspection found limerock materiasoils in both lanes leading into Belle Terre-spoke with CLINE-CHUCK D,on thursday still soils on roadway today-Friday-informed again to clean up road(discussed type of material to use between roadway and the rock Soil Traping Device at startof construction making it known if limerock it will get messy and not perform well for accessibility traveling across | |||
| UC-CONSTRUCTION ENTRANCE | 02/20/2026 | PARTIALLY APPROVED | LFITZGERALD |
| Note: base installed from EOP TO propoerty line then 2in rock/culvert pipe (c900) installed in row swale | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 02/17/2026 | PARTIALLY APPROVED | JMYERS |
| Note: 2/17/26 EROSION CONTROL MEASURES INSTALLED PER SWPPP. FOLLOW UP INSPECTION NEXT MONTH. | |||
| PLAN - PRE-CON 386-986-3750 | 01/27/2026 | APPROVED - AS NOTED | LFITZGERALD |
| Note: city staff-building-utility-myself along with Cline staff along with Sean-DCI-developer- | |||
| PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY | |||
| IRRIGATION AFFIDAVIT | |||
| LDSC-IRRIGATION FINAL | |||
| LDSC- LANDSCAPE / IRRIGATION AS-BUILT | |||
| LDSC- LANDSCAPE FINAL | |||
| U-SEWER FORCE MAIN INSTALL/TESTING | |||
| U-WATER SERVICE INSTALLATION | |||
| U-GRAVITY SEWER INSTALL/TESTING | |||
| U-WATER MAIN DISINFECTION | |||
| U-WATER MAIN DISINFECTION SAMPLING | |||
| GEOTECH-SITE PREP ENG CERTIFICATIO (OFFICE USE ONLY) | |||
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | |||
| BLD- ADA PARKING | |||
| BLD- ADA SIGNAGECONTROL | |||
| BLD- ADA VEHICULAR WAY | |||
| BLD - UNDERGROUND SITE LIGHTING CONDUITS | |||
| BLD - SITE LIGHTING-PLACEMENT/FOUNDATION | |||
| BLD - SITE LIGHTING-POLE SET/FIXTURE | |||
| MAINT BOND ACCEPTANCE (OFFICE) | |||
| CLOSE OUT DOCUMENTS | |||
| UC-CONSTRUCTION ENTRANCE | |||
| Note: 5/5/2026 - PREVIOUS INSPECTION NOTES 4/10/2026 - PREVIOUS INSPECTION NOTES 2/20/2026 - PREVIOUS INSPECTION NOTES base installed from EOP TO propoerty line then 2in rock/culvert pipe (c900) installed in row swale LIMEROCK now wet from wedensday rains and Thursaday inspection found limerock materiasoils in both lanes leading into Belle Terre-spoke with CLINE-CHUCK D,on thursday still soils on roadway today-Friday-informed again to clean up road(discussed type of material to use between roadway and the rock Soil Traping Device at startof construction making it known if limerock it will get messy and not perform well for accessibility traveling across currently dome mats between sidewalk and roadway-working good and compacted base in sidewalk firm and traversable for mix use | |||
| U-PUMP STATION PRE-INSTALLATION | |||
| Note: 4/30/2026 - PREVIOUS INSPECTION NOTES In Progress | |||
| U-PUMP STATION START-UP | |||
| U-GREASE INTERCEPTOR PRE-INSTALLATION | |||
| U-GREASE INTERCEPTOR FLOW/DYE TESTED | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | |||
| Note: 5/13/2026 - PREVIOUS INSPECTION NOTES 5/8/2026 - PREVIOUS INSPECTION NOTES CHECKED TWO MES AND PIPE ALONG BELLE TERRE JUST NORTH OF CONCSTRUCTION ENTRANCE, CHECK STRUCTURE #7 AND MES INTO POND SW CORNER. 5/1/2026 - PREVIOUS INSPECTION NOTES CHECKED FES STRUCTURES ALONG SR100 SIDE now set s-6 heading to s5 | |||
| U-WATER METER INSTALLATION/VERIFICATION | |||
| PROJECT CLOSE OUT MEETING (386-986-3750) | |||
| UC-SUBSTANTIAL WALK-THRU | |||
| UC- PRELIMINARY AS-BUILTS | |||
| UC-FINAL SITE INSPECTION | |||
| UC-FINAL SITE STABILIZATION | |||
| U - UTILITY COMMERCIAL FINAL | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | |||
| Note: 2/17/2026 - PREVIOUS INSPECTION NOTES 2/17/26 EROSION CONTROL MEASURES INSTALLED PER SWPPP. FOLLOW UP INSPECTION NEXT MONTH. | |||
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | |||
| UROW-RETENT/DETENT STABILI | |||
| UROW- CURBING & GUTTER | |||
| U-ROW FINAL | |||
| UC-TRAF - MAINT OF TRAFFIC | |||
| UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) | |||
| WATERMAIN FLUSH & PRESSURE TESTED | |||
| FDEP WATERMAIN CLEARANCE | |||
| HYDRANT - PAINT / FLOW/VALVE/ RPM | |||
| TEMPORARY HYDRANT CONSTRUCTION METER | |||
| UC-DRAINAGE STRUCT PLACMNT | |||
| Note: 5/13/2026 - PREVIOUS INSPECTION NOTES 5/8/2026 - PREVIOUS INSPECTION NOTES CHECKED TWO MES AND PIPE ALONG BELLE TERRE JUST NORTH OF CONCSTRUCTION ENTRANCE, CHECK STRUCTURE #7 AND MES INTO POND SW CORNER. 5/5/2026 - PREVIOUS INSPECTION NOTES 5/1/2026 - PREVIOUS INSPECTION NOTES CHECKED FES STRUCTURES ALONG SR100 4 sets of FES'S WITH 1.5 STICK RCP now set s-7 and s-6 heading to 5 |
Review History
| Department | Status | Date In | Date Out |
| DSD | COMPLETE | 01/22/2026 | 01/22/2026 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/07/2026 | 01/07/2026 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 01/07/2026 | 01/08/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| PLENG | COMPLETE | 01/07/2026 | 01/08/2026 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| PLLA | COMPLETE | 01/07/2026 | 01/07/2026 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| UD1 | COMPLETE | 01/07/2026 | 01/08/2026 |
| Note: Released By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM | |||
| DSD | HOLD | 01/07/2026 | 01/07/2026 |
| Note: Held By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMINISTRATIVE- SITE DEVELOP | ¤125.00 | 01/22/2026 |
| INSPECTION - GENERAL | ¤280.00 | 01/22/2026 |
| SITE DEVELOPMENT ADMIN PLANNIN | ¤179.00 | 01/22/2026 |
| SITE INSPECTION | ¤684.00 | 01/22/2026 |
| SITE PLAN 29 | ¤29.00 | 01/22/2026 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤1,297.00 |