I want to search for...
Permit #2026010147
Permit Details
Status: INSPECT
| Parcel Id: 42-10-30-3210-00000-2490 |
| CONDITIONED SPACE: 2327 sqft |
| GARAGE: 621 sqft |
| OPENED PORCH (WITH ROOF) : 285 sqft |
| Total Square Footage: 3233 sqft |
| Block: 00000 |
| Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH |
| Job Phone: 386-236-4133 |
| Location Address: 163 ASPEN WAY |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/22/2026 |
| NOC: RECORDED |
| Applicant name: LEONARDO CIRO SANCLEMENTE |
| Owner: MHK OF VOLUSIA COUNTY INC |
|
Address 2379 BEVILLE ROAD DAYTONA BEACH, FL 32119 |
| Lot: 2490 |
| Contracted Stated Job Value: ¤323,316.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
VOLUSIA RESIDENTIAL CONSTRUCTION, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2379 BEVILLE RD DAYTONA BEACH, FL 32119 |
CBC1262114 (Exp: 08/31/2026) | 386-236-4133 |
Sub Contractors
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
TIMUR ISPARYAN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
3665 SPRINK PARK ROAD JACKSONVILLE , FL 32207 |
CMC1249968 (Exp: 08/31/2026) | 904-245-1818 | 904-337-1910 |
HUGH MACDONALD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10825 TOM FOLSOM ROAD, SUITE A THONOTOSASSA, FL 33592 |
CCC1329562 (Exp: 08/31/2026) | 813-986-4968 |
HARLEY M BRYAN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
5223 EDGEWOOD CT ORMOND BEACH, FL 32174 |
LI26657 (Exp: 08/31/2028) | 386-463-2700 |
JAMES M GREENSLADE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
311 S BAY ST BUNNELL, FL 32110 |
EC13006083 (Exp: 08/31/2026) | 386-263-2960 | 386-263-2980 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW- PRE-APRON (PRE-POUR) | 06/04/2026 | APPROVED - AS NOTED | EMADISON |
| Note: 06/04/26 READY TO SET PAVERS ** ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ________________________________________________________________________________________________________________________ 5/22/2026 - PREVIOUS INSPECTION NOTES ** 05/22/26 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED ____________________________________________________________________________________________________________________ | |||
| ELECTRIC - EARLY POWER | 05/27/2026 | APPROVED | RMARTIN |
| Note: Inspector Notes from Inspection 2200 4/6/26 Emailed FPL | |||
| ROW- PAVER RESTRAINTS | 05/22/2026 | APPROVED - AS NOTED | EMADISON |
| Note: ** 05/22/26 READY TO POUR PAVER RESTRAINTS WITH APRON ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED ____________________________________________________________________________________________________________________ | |||
| ROW- PRE-APRON (PRE-POUR) | 05/22/2026 | PARTIALLY APPROVED | EMADISON |
| Note: ** 05/22/26 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED ____________________________________________________________________________________________________________________ | |||
| DRYWALL NAILING | 04/15/2026 | APPROVED | MCONTRYMAN |
| Note: 4/14/2026 - PREVIOUS INSPECTION NOTES Cancelled via text @ 8:38am | |||
| DRYWALL NAILING | 04/14/2026 | CANCELLED BY APPLICANT | MCONTRYMAN |
| Note: Cancelled via text @ 8:38am | |||
| INSULATION | 04/09/2026 | APPROVED | MCONTRYMAN |
| GAS ROUGH | 04/09/2026 | APPROVED | MCONTRYMAN |
| Note: 4/8/2026 - PREVIOUS INSPECTION NOTES 4/8/26 1. Stub out for kitchen still showing no pressure in test. Spoke with contractor last time 4/6/2026 - PREVIOUS INSPECTION NOTES 4/6/26 1. Not all gas stub outs are hooked into main gas line. If the stub outs are to be seperate, each line will need to be tested seperately, be bonded, and have its own LP connection. FBCR G2417.4.1 | |||
| GAS ROUGH | 04/08/2026 | Disapproved -FEE REQUIRED | MCONTRYMAN |
| Note: 4/8/26 1. Stub out for kitchen still showing no pressure in test. Spoke with contractor last time 4/6/2026 - PREVIOUS INSPECTION NOTES 4/6/26 1. Not all gas stub outs are hooked into main gas line. If the stub outs are to be seperate, each line will need to be tested seperately, be bonded, and have its own LP connection. FBCR G2417.4.1 | |||
| LATH/BRICK/ WATER BARRIER | 04/08/2026 | APPROVED | MCONTRYMAN |
| Note: Inspector Notes from Inspection 2420 4/2/26 1. Nail plate needed for front master shower hot water line 2. Duct layout needs to be changed and approved to show installed layout 3. Meter/Main not installed at time of inspection (Greenslade on site) 4. SGD panels not installed at time of inspection | |||
| ELECTRIC-TUG | 04/06/2026 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 4/6/26 Emailed FPL | |||
| GAS ROUGH | 04/06/2026 | Disapproved - NO FEE | MCONTRYMAN |
| Note: 4/6/26 1. Not all gas stub outs are hooked into main gas line. If the stub outs are to be seperate, each line will need to be tested seperately, be bonded, and have its own LP connection. FBCR G2417.4.1 | |||
| ALL ROUGH | 04/02/2026 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 4/2/26 1. Nail plate needed for front master shower hot water line 2. Duct layout needs to be changed and approved to show installed layout 3. Meter/Main not installed at time of inspection (Greenslade on site) 4. SGD panels not installed at time of inspection | |||
| ROOF VALLEY & METAL | 03/25/2026 | APPROVED | JSTEWART |
| WALL SHEATHING | 03/20/2026 | APPROVED | MCONTRYMAN |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/20/2026 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 3/20/26 1. Truss B3, web W6, is bowed and needs repair 2. Missing SDWC screws per plan on page S1 (highlighted) | |||
| TIE BEAM / LINTEL | 03/09/2026 | APPROVED | MCONTRYMAN |
| MONOLITHIC SLAB | 02/26/2026 | APPROVED | KSANDOE |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/23/2026 | APPROVED | MCONTRYMAN |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 02/20/2026 | APPROVED | PFLANAGAN |
| GRAVITY SEWER TEST | 02/18/2026 | APPROVED | MKRASKI |
| SEWER TIE IN | 02/18/2026 | APPROVED | MKRASKI |
| WATER METER INSTALLATION REQUEST | 02/18/2026 | APPROVED | ISANDERSON |
| U-CROSS CONNECTION | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | |||
| BLD - BUILDING FINAL |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 04/02/2026 | 04/06/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| GAS | COMPLETE | 03/30/2026 | 03/31/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/20/2026 | 02/20/2026 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/20/2026 | 02/20/2026 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/15/2026 | 01/16/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/15/2026 | 01/15/2026 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ZON | HOLD | 01/14/2026 | 01/14/2026 |
| Note: Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM site plan uploaded cannot have drainage info | |||
| ENGIN1 | COMPLETE | 01/14/2026 | 01/15/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/14/2026 | 01/15/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/07/2026 | 01/09/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 01/07/2026 | 01/14/2026 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 01/07/2026 | 01/12/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/07/2026 | 01/08/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | COMPLETE | 01/07/2026 | 01/08/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 01/07/2026 | 01/14/2026 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 01/07/2026 | 01/09/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 01/07/2026 | 01/08/2026 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Grading comments: - There are slopes greater than 4:1 on the left side of this property. In 3 feet, the maximum fall allowed from grade adjacent to foundation to the lot line is .75'. - Along both lot lines there is are flat spots. There shall be 0.1' fall every 20', which is considered positive flow. - There shall be existing elevations shots on adjacent lots to clearly depict where the stormwater is going. - Based on the information provided this lot is negatively impacting lot 248. Please feel free to call or email if there are any questions or concerns, | |||
| ZON | HOLD | 01/07/2026 | 01/09/2026 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Map panel number should be 0038E change plan accordingly | |||
| URB | COMPLETE | 01/07/2026 | 01/12/2026 |
| Note: Released By: MATTHEW SIERRA - (386)286-2002 - MSIERRA@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| FC IMPACT FEE EMS | ¤62.00 | 01/22/2026 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 01/22/2026 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 01/22/2026 |
| FIRE RES IMPACT FEE 10-25 | ¤942.00 | 01/22/2026 |
| WATER METER W/OUT TAP | ¤965.03 | 01/22/2026 |
| PARKS IMPACT FEE 10-25 | ¤3,164.00 | 01/22/2026 |
| RSI DRIVEWAY AFTER POUR | ¤16.25 | 01/22/2026 |
| RSE DRIVE PRE POUR INSPECTION | ¤32.50 | 01/22/2026 |
| RSI FIELD SURVEY INSPECTION | ¤48.75 | 01/22/2026 |
| RSI FORMBOARD REVIEW | ¤16.25 | 01/22/2026 |
| RSI PLAN REVIEW NEW | ¤48.75 | 01/22/2026 |
| RSI FNL SURVEY/GRADING CERT | ¤48.75 | 01/22/2026 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 01/22/2026 |
| SCHOOL BOARD IMPACT FEE RES | ¤5,450.00 | 01/22/2026 |
| SURCHARGE FS 533.721 | ¤16.57 | 01/22/2026 |
| SURCHARGE - FS 468.631 | ¤24.86 | 01/22/2026 |
| TRANSP RES IMPACT FEE 10-25 | ¤8,772.79 | 01/22/2026 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 01/22/2026 |
| WASTEWATER PERM REVIEW | ¤25.00 | 01/22/2026 |
| WATER PERMIT REVIEW | ¤25.00 | 01/22/2026 |
| SITE PLAN 30 | ¤30.00 | 01/22/2026 |
| WATER- TURN ON | ¤50.00 | 01/22/2026 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/22/2026 |
| INSPECTION - RESIDENTIAL | ¤1,267.75 | 01/22/2026 |
| PLAN REVIEW - RESIDENTIAL | ¤359.58 | 01/22/2026 |
| PLAN REVIEW - REVISION | ¤32.50 | |
| PLAN REVIEW - REVISION | ¤32.50 | |
| REINSPECTION RESIDENTIAL | ¤40.00 | |
| CONTRACTOR CHANGE | ¤20.00 | |
| Fees | Total Due: ¤125.00 | Total Paid: ¤21,978.08 |