I want to search for...
Permit #2026010150
Permit Details
Status: ISSUED
| Parcel Id: 04-12-31-0000-04030-0016 |
| Subdivision: 2370 - COQUINA SHORES (55+ AGE EXEMPT) |
| Job Phone: 904-207-7400 |
| Location Address: 6150 STATE HWY 100 E |
| Type: SNMON - MONUMENT SIGN |
| Issue Date: 06/16/2026 |
| NOC: RECORDED |
| Applicant name: CLINTON WARD THOMAS |
| Owner: PULTE HOMES COMPANY, LLC |
|
Address 12724 GRAN BAY PKWY WEST JACKSONVILLE, FL 32258 |
|
Address SUITE 200 JACKSONVILLE, FL 32258 |
| Contracted Stated Job Value: ¤256,208.00 |
| Job Description: MONUMENT SIGN " DEL WEBB FLAGLER BEACH" |
| Type: CN |
Contractor
CT CONSTRUCTION SERVICES, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3619 NIPA DR GREEN COVE SPRINGS, FL 32043 |
CGC1517496 (Exp: 08/31/2026) | 904-207-7400 |
Sub Contractors
KEITH A DEASE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 8567 FLEMING ISLAND, FL 32003 |
EC0001925 (Exp: 08/31/2026) | (904)541-1000 | (904)215-3475 |
WILLIAM PRICE PIVONKA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
7013 FOREST CITY ROAD , 0 |
CPC1457782 (Exp: 08/31/2026) | 407-523-2300 |
Inspection History
| Type | Request Date | Result | Inspector |
| WATER SERVICE LINE | |||
| FOOTER | |||
| DOWN CELL | |||
| LATH/BRICK/WATER BARRIER | |||
| FINAL | |||
| LDSC-LANDSCAPE/IRRIGATION FINAL |
Review History
| Department | Status | Date In | Date Out |
| UD1 | COMPLETE | 06/12/2026 | 06/15/2026 |
| Note: Released By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 06/01/2026 | 06/01/2026 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM There are two permits applied for at the same location/address. Please upload a new permit application with the correct address and we will update the permit location. If you are unsure of the correct addresses, please contact Damaris Ramirez in the Planning Division dramirez@palmcoastgov.com | |||
| PLUM | COMPLETE | 06/01/2026 | 06/02/2026 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| DSD | COMPLETE | 06/01/2026 | 06/02/2026 |
| Note: Released By: ESTELLE LENS - (386)986-2655 - ELENS@PALMCOASTGOV.COM Approved - Sign: 13.2X4=52.8 Aggregate for sign 8 X 19.6 = 156.8 (19.8 is the width of the sign measured without the columns. Got this measurement in BlueBeam) 52.8X2 = 105.6 Ag-sign =104 Balance is the entry feature | |||
| BADMIN | COMPLETE | 06/01/2026 | 06/01/2026 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM release hold as per Damaris 06/01/2026 | |||
| PLLA | COMPLETE | 06/01/2026 | 06/12/2026 |
| Note: Released By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM | |||
| UD1 | HOLD | 06/01/2026 | 06/03/2026 |
| Note: Held By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM Please note that individual reuse services will only need a meter, no backflow device is necessary, while individual potable water services will need a meter and backflow device. Moreover, reuse water can be used at a reduced rate compared to potable water. Is there any reason why reclaim water could not be used for the monument/entry sign? INFORMATION: Please contact Haleigh Hand at HHand@palmcoastgov.com for metering agreement and coordination of meter pick up | |||
| BADMIN | HOLD | 05/04/2026 | 05/04/2026 |
| Note: Held By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM An electrical subcontractor must be identified. A plumbing contractor must be identifed. There are two permits applied for at the same location/address. Please upload a new permit application with the correct address and we will update the permit location. If you are unsure of the correct addresses, please contact Damaris Ramirez in the Planning Division dramirez@palmcoastgov.com Subcontractors can be added through the permit portal once the reviews have been completed. | |||
| PLUM | HOLD | 05/04/2026 | 05/04/2026 |
| Note: Held By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM Upon readying this permit for issuance, it was discovered the monument sign structure is equipped with a water feature. As a result, please show lthe following: 1. Location of water meter, and route of underground water service to the water featue. 2. Backflow preventer (type, make and model) and shut-off valve configuaration at the water feature 3. List plumbing sub-contractor on application. | |||
| PLLA | COMPLETE | 04/09/2026 | 04/22/2026 |
| Note: Released By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 04/09/2026 | 04/14/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| DSD | CANCEL | 04/09/2026 | 04/24/2026 |
| Note: Approved - Sign: 13.2X4=52.8 Agregate for sign 19.5X7.9=154.05 52.8X2 = 105.6 Ag-soign =102.25 Balance is the entry feature | |||
| PLLA | HOLD | 01/21/2026 | 01/21/2026 |
| Note: Held By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM | |||
| PLLA | HOLD | 01/21/2026 | 01/21/2026 |
| Note: Held By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM 1. Provide Landsdcape Plan 2. Provide Irrigation Plan | |||
| BLD | COMPLETE | 01/07/2026 | 01/12/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| DSD | HOLD | 01/07/2026 | 01/20/2026 |
| Note: Held By: ESTELLE LENS - (386)986-2655 - ELENS@PALMCOASTGOV.COM It appears that three separate permits are required: 1. The Monument Sign: West side of entrance. - Need to provide complete elevation of the monument sign and include the dimensions, height and width of the aggregate sign (all features) AND the sign face area. - Provide an elevation of the wall in front of the sign with the dimensions, finish and height of the columns. 2. East monument - This appears to be an 8 foot wall with columns. - Need to provide elevation of the wall and columns with height and widths of the wall and columns including finish materials and colors. 3. West monument - Need to provide elevation of the wall and columns with height and widths of the wall and columns including finish materials and colors. This may not be permitted as the emergency access is not an entrance. However, this will be discussed with the Land Use Administrator once elevations are provided. For each permit need to provide a site plan with the setback Clearly shown from the closest point of the sign, wall and/ or column to the property line(s). | |||
| ELEC | HOLD | 01/07/2026 | 01/12/2026 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Electrical service and gates will have to be on a separate permit. | |||
| PLLA | HOLD | 01/07/2026 | 01/21/2026 |
| Note: Held By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM 1 Provide landscape Plan 2. Provide Irrigation Plan |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMINISTRATIVE - COMMERCIAL | ¤75.00 | 06/16/2026 |
| INSPECTION COMMERCIAL | ¤1,799.00 | 06/16/2026 |
| PLAN REVIEW - COMMERCIAL | ¤295.55 | 06/16/2026 |
| CONTRACTOR CHANGE | ¤20.00 | 06/16/2026 |
| CONTRACTOR CHANGE | ¤20.00 | 06/16/2026 |
| SURCHARGE FS 533.721 | ¤21.70 | 06/16/2026 |
| SURCHARGE - FS 468.631 | ¤32.54 | 06/16/2026 |
| SITE PLAN 30 | ¤30.00 | 06/16/2026 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤2,293.79 |