I want to search for...

Permit #2026010191

Permit Details

Status: COED

Parcel Id: 03-12-31-1126-00000-2490
CONDITIONED SPACE: 2746 sqft
GARAGE: 600 sqft
OPENED PORCH (WITH ROOF) : 155 sqft
OPENED PORCH (WITH ROOF) : 384 sqft
Total Square Footage: 3885 sqft
Subdivision: 2344 - COLBERT LANDINGS PH 2
Job Phone: 813-917-1689
Location Address: 100 ARMOYAN DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/20/2026
NOC: RECORDED
Applicant name: SCOTT EVAN KEUNING
Owner: TAYLOR MORRISON OF FLORIDA INC

Address

1275 W GRANADA BLVD

ORMOND BEACH, FL 32174

Address

SUITE 3B

ORMOND BEACH, FL 32174

Lot: 249
Contracted Stated Job Value: ¤202,614.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

TAYLOR MORRISON OF FLORIDA INC
Status Location Address State License Number Phone
ACTIVE

7785 BAY MEADOWS WAY, SUITE 105

JACKSONVILLE, FL 32256

CBC1265083 (Exp: 08/31/2026) 813-917-1689

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PKWY

SANFORD, FL 32771

CAC043953 (Exp: 08/31/2026) 877-906-1113
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
BENJAMIN MICHAEL RAY
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

6310 MABLETON PKWY

JACKSONVILLE, FL 32216

SUITE 1000

MABLETON, GA 30126

CFC1428415 (Exp: 08/31/2026) 904-861-5421 904-861-5426
CHASE RANDOLPH MASSEY
Status Location Address State License Number Phone
ACTIVE

10048 103RD ST

JACKSONVILLE, FL 32210

CCC1332486 (Exp: 08/31/2026) 904-248-1133

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/04/2026 APPROVED CVANSTRAHLEN
Note: 6/3/2026 - PREVIOUS INSPECTION NOTES Please fix items #2 , #3 , #6 , #7 and #9 from previous inspection before next final inspection 5/20/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1-Missing range hood vent pipe connection #2-Missing AC grill on master bedroom ceiling #3-FBC-R . 302.6 seal all garage penetration , wall and ceiling #4-FBC-R . 302.6 seal all AH closet penetration wall and ceiling ( low voltage wire AHU Plenum conduit ) #5-P2804.6.1-14-requires water heater temperature and pressure (T&P) relief valve discharge pipes to be made of approved materials (copper, CPVC, galvanized steel), maintain the same diameter as the valve outlet, and flow by gravity. The pipe must terminate 2–6 inches above the floor #6-M1502.4.7 Exhaust duct required. Where space for a clothes dryer is provided, an exhaust duct system shall be installed. Where the clothes dryer is not installed at the time of occupancy the exhaust duct shall be capped or plugged in the space in which it originates and identified and marked “future use. #7-FBCR 506.2.1-TERMITE TREATMENT OR NOTICE OF INTENT FOR BORACARE #8- AC unit call for a max 35 amp breaker and AH call for max 30 amp breaker , please provided the correct breakers #9- please removed all trash from garage (allow access to space )
BLD - BUILDING FINAL 06/03/2026 Disapproved -FEE REQUIRED CVANSTRAHLEN
Note: Please fix items #2 , #3 , #6 , #7 and #9 from previous inspection before next final inspection 5/20/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1-Missing range hood vent pipe connection #2-Missing AC grill on master bedroom ceiling #3-FBC-R . 302.6 seal all garage penetration , wall and ceiling #4-FBC-R . 302.6 seal all AH closet penetration wall and ceiling ( low voltage wire AHU Plenum conduit ) #5-P2804.6.1-14-requires water heater temperature and pressure (T&P) relief valve discharge pipes to be made of approved materials (copper, CPVC, galvanized steel), maintain the same diameter as the valve outlet, and flow by gravity. The pipe must terminate 2–6 inches above the floor #6-M1502.4.7 Exhaust duct required. Where space for a clothes dryer is provided, an exhaust duct system shall be installed. Where the clothes dryer is not installed at the time of occupancy the exhaust duct shall be capped or plugged in the space in which it originates and identified and marked “future use. #7-FBCR 506.2.1-TERMITE TREATMENT OR NOTICE OF INTENT FOR BORACARE #8- AC unit call for a max 35 amp breaker and AH call for max 30 amp breaker , please provided the correct breakers #9- please removed all trash from garage (allow access to space )
ROW - FINAL APRON (AFTER POUR) 05/29/2026 APPROVED FSLADISH
Note: 5/29/26 CITY OF PALM COAST MINIMUM STANDARDS ARE MET AT THE TIME OF THIS INSPECTION. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9463 5/28/26 DUE TO B DRAINAGE AND DRAINAGE FLOWING REARWARD I AM APPROVING THIS LDAGC AS NOTED. 5/28/2026 - PREVIOUS INSPECTION NOTES 5/28/26 YOU DO NOT HAVE 6' OF FALL OFF OF THE REAR STRUCTURE IN THE FIRST 10 FOOT AS AS REQUIRED BY THE FBC. SEE PHOTO FOR REFERENCE. Drainage from the structure is to be a 6-inch (5%) Residential, Chapter 4, R401.3 "Drainage from the structure is to be a 6-inch (5%) minimum slope for the first 10 FT E.Florida Building Code, Residential, Chapter 4, R401.3"
ROW - FINAL INSPECTION 05/29/2026 APPROVED FSLADISH
Note: 5/29/26 Approving as noted that you will need to clean up roadway area where dumpster is. CITY OF PALM COAST MINIMUM STANDARDS ARE MET AT THE TIME OF THIS INSPECTION. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. _________________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 5/28/26 DUE TO B DRAINAGE AND DRAINAGE FLOWING REARWARD I AM APPROVING THIS LDAGC AS NOTED. 5/28/2026 - PREVIOUS INSPECTION NOTES 5/28/26 YOU DO NOT HAVE 6' OF FALL OFF OF THE REAR STRUCTURE IN THE FIRST 10 FOOT AS AS REQUIRED BY THE FBC. SEE PHOTO FOR REFERENCE. Drainage from the structure is to be a 6-inch (5%) Residential, Chapter 4, R401.3 "Drainage from the structure is to be a 6-inch (5%) minimum slope for the first 10 FT E.Florida Building Code, Residential, Chapter 4, R401.3"
U -UTILITY RESIDENTIAL FINAL 05/29/2026 FINAL APPROVED BWRIGHT
Note: 5/20/2026 - PREVIOUS INSPECTION NOTES Sewer cleanout not to grade. dumpster in front house.
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/28/2026 Disapproved - NO FEE FSLADISH
Note: 5/28/26 YOU DO NOT HAVE 6' OF FALL OFF OF THE REAR STRUCTURE IN THE FIRST 10 FOOT AS AS REQUIRED BY THE FBC. SEE PHOTO FOR REFERENCE. Drainage from the structure is to be a 6-inch (5%) Residential, Chapter 4, R401.3 "Drainage from the structure is to be a 6-inch (5%) minimum slope for the first 10 FT E.Florida Building Code, Residential, Chapter 4, R401.3"
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/28/2026 APPROVED - AS NOTED FSLADISH
Note: 5/28/26 DUE TO B DRAINAGE AND DRAINAGE FLOWING REARWARD I AM APPROVING THIS LDAGC AS NOTED. 5/28/2026 - PREVIOUS INSPECTION NOTES 5/28/26 YOU DO NOT HAVE 6' OF FALL OFF OF THE REAR STRUCTURE IN THE FIRST 10 FOOT AS AS REQUIRED BY THE FBC. SEE PHOTO FOR REFERENCE. Drainage from the structure is to be a 6-inch (5%) Residential, Chapter 4, R401.3 "Drainage from the structure is to be a 6-inch (5%) minimum slope for the first 10 FT E.Florida Building Code, Residential, Chapter 4, R401.3"
ROW - FINAL INSPECTION 05/20/2026 CANCELLED BY APPLICANT FSLADISH
Note: 5/20/26 THERE IS NO FINAL SURVEY /LDAGC UPLOADED TO REVIEW. CALLED BOBBY CM AND LET HIM KNOW I AM CANCELLING THESE TWO INPECTIONS SCHEDULED FOR TODAY AND ENGINEERING WILL ADD THE CORRECT INSPECTION AND SEQUENCE.
U -UTILITY RESIDENTIAL FINAL 05/20/2026 Disapproved - NO FEE TLOWE
Note: Sewer cleanout not to grade. dumpster in front house.
ROW - FINAL APRON (AFTER POUR) 05/20/2026 CANCELLED BY APPLICANT FSLADISH
Note: 5/20/26 THERE IS NO FINAL SURVEY /LDAGC UPLOADED TO REVIEW. CALLED BOBBY CM AND LET HIM KNOW I AM CANCELLING THESE TWO INPECTIONS SCHEDULED FOR TODAY AND ENGINEERING WILL ADD THE CORRECT INSPECTION AND SEQUENCE.
U-CROSS CONNECTION 05/20/2026 APPROVED - AS NOTED TLOWE
Note: NO CC / IRR with potable [PVB]
BLD - BUILDING FINAL 05/20/2026 Disapproved -FEE REQUIRED CVANSTRAHLEN
Note: *** NOTES ADDED BY CVANSTRAHLEN 5/20/2026 2:05:43 PM *** #12-missing tile on share bathroom ( left wall ) *** NOTES ADDED BY CVANSTRAHLEN 5/20/2026 11:20:54 AM *** #11- tug high voltage conduit , required to be fastened and secured (missing strap ) *** NOTES ADDED BY CVANSTRAHLEN 5/20/2026 11:10:11 AM *** #10-please propper seal dwv on garage by water heather Please fix items before next inspection #1-Missing range hood vent pipe connection #2-Missing AC grill on master bedroom ceiling #3-FBC-R . 302.6 seal all garage penetration , wall and ceiling #4-FBC-R . 302.6 seal all AH closet penetration wall and ceiling ( low voltage wire AHU Plenum conduit ) #5-P2804.6.1-14-requires water heater temperature and pressure (T&P) relief valve discharge pipes to be made of approved materials (copper, CPVC, galvanized steel), maintain the same diameter as the valve outlet, and flow by gravity. The pipe must terminate 2–6 inches above the floor #6-M1502.4.7 Exhaust duct required. Where space for a clothes dryer is provided, an exhaust duct system shall be installed. Where the clothes dryer is not installed at the time of occupancy the exhaust duct shall be capped or plugged in the space in which it originates and identified and marked “future use. #7-FBCR 506.2.1-TERMITE TREATMENT OR NOTICE OF INTENT FOR BORACARE #8- AC unit call for a max 35 amp breaker and AH call for max 30 amp breaker , please provided the correct breakers #9- please removed all trash from garage (allow access to space )
ELECTRIC - EARLY POWER 04/23/2026 APPROVED CVANSTRAHLEN
ROW- PRE-APRON (PRE-POUR) 04/17/2026 APPROVED FSLADISH
Note: 4/17/26 AT THE TIME OF THE INSPECTION PREPOUR AREA IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD REMOVE ALL WATER AND CHECK COMPACTION BEFORE POURING CONCRETE. 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED IS REQUIRED. PLEASE REVIEW CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. NO EXPANSION JOINTS ALLOWED.
GRAVITY SEWER TEST 03/31/2026 APPROVED CVANSTRAHLEN
SEWER TIE IN 03/31/2026 APPROVED CVANSTRAHLEN
DRYWALL NAILING 03/23/2026 APPROVED KSANDOE
INSULATION 03/19/2026 APPROVED MCONTRYMAN
LATH/BRICK/ WATER BARRIER 03/16/2026 APPROVED MCONTRYMAN
Note: 3/5/2026 - PREVIOUS INSPECTION NOTES 3/5/26 Job not ready. Still need windows and doors installed and taped 3/3/2026 - PREVIOUS INSPECTION NOTES FBC [A]107.4-NOT READY - WORK INCOMPLETE Inspector Notes from Inspection 2460 Missing engineering on A03 truss
ALL ROUGH 03/16/2026 APPROVED MCONTRYMAN
LATH/BRICK/ WATER BARRIER 03/05/2026 Disapproved -FEE REQUIRED MCONTRYMAN
Note: 3/5/26 Job not ready. Still need windows and doors installed and taped 3/3/2026 - PREVIOUS INSPECTION NOTES FBC [A]107.4-NOT READY - WORK INCOMPLETE Inspector Notes from Inspection 2460 Missing engineering on A03 truss
ELECTRIC-TUG 03/04/2026 APPROVED CVANSTRAHLEN
Note: 3/3/2026 - PREVIOUS INSPECTION NOTES please fix bfore next inspection electric box need to be fastened and secure to the wall per spec
ELECTRIC-TUG 03/03/2026 Disapproved - NO FEE CVANSTRAHLEN
Note: please fix bfore next inspection electric box need to be fastened and secure to the wall per spec
LATH/BRICK/ WATER BARRIER 03/03/2026 Disapproved - NO FEE CVANSTRAHLEN
Note: FBC [A]107.4-NOT READY - WORK INCOMPLETE Inspector Notes from Inspection 2460 Missing engineering on A03 truss
ROOF VALLEY & METAL 03/03/2026 APPROVED CVANSTRAHLEN
Note: Inspector Notes from Inspection 2460 Missing engineering on A03 truss
WALL SHEATHING 02/26/2026 APPROVED CVANSTRAHLEN
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/26/2026 APPROVED - AS NOTED CVANSTRAHLEN
Note: Missing engineering on A03 truss
MONOLITHIC SLAB 02/06/2026 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 02/04/2026 APPROVED BTAYLOR
WATER METER INSTALLATION REQUEST 02/04/2026 APPROVED CBOWERMASTER
FORMBOARD SURVEY (OFFICE USE ONLY) 02/03/2026 APPROVED RRICKS

Review History

Department Status Date In Date Out
SW1 COMPLETE 02/03/2026 02/03/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 02/03/2026 02/03/2026
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 01/16/2026 01/20/2026
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BLD COMPLETE 01/16/2026 01/20/2026
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD HOLD 01/08/2026 01/13/2026
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Design Specifications need to be current code.
CUSVC COMPLETE 01/08/2026 01/14/2026
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 01/08/2026 01/13/2026
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/08/2026 01/15/2026
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 01/08/2026 01/12/2026
LOCATE COMPLETE 01/08/2026 01/14/2026
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 01/08/2026 01/12/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 01/08/2026 01/12/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM There is an approved permit depicting 10' shots beyond property line. In the future please capture the 10' shots beyond the property lines to prevent a hold.
ZON HOLD 01/08/2026 01/12/2026
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Color Sheet: please check the name of you paint and correct plans accordingly floor plan: number the bedrooms correctly
URB COMPLETE 01/08/2026 01/14/2026
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 06/04/2026
REINSPECTION RESIDENTIAL ¤40.00 06/04/2026
REINSPECTION RESIDENTIAL ¤40.00 06/04/2026
FC IMPACT FEE EMS ¤62.00 01/20/2026
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 01/20/2026
FC IMPACT FEE LIBRARY ¤268.00 01/20/2026
FIRE RES IMPACT FEE 10-25 ¤942.00 01/20/2026
WATER METER W/OUT TAP ¤965.03 01/20/2026
PARKS IMPACT FEE 10-25 ¤3,164.00 01/20/2026
RSI DRIVEWAY AFTER POUR ¤16.25 01/20/2026
RSE DRIVE PRE POUR INSPECTION ¤32.50 01/20/2026
RSI FIELD SURVEY INSPECTION ¤48.75 01/20/2026
RSI FORMBOARD REVIEW ¤16.25 01/20/2026
RSI PLAN REVIEW NEW ¤48.75 01/20/2026
RSI FNL SURVEY/GRADING CERT ¤48.75 01/20/2026
RSI ROW FINAL INSPECTION ¤16.25 01/20/2026
SURCHARGE FS 533.721 ¤19.68 01/20/2026
SURCHARGE - FS 468.631 ¤29.52 01/20/2026
TRANSP RES IMPACT FEE 10-25 ¤10,352.42 01/20/2026
WASTEWATER PERM INSPECTION ¤80.00 01/20/2026
WASTEWATER PERM REVIEW ¤25.00 01/20/2026
SEWER CAPITAL FACILITY ¤3,613.92 01/20/2026
WATER CAPITAL FACILITY FEE ¤3,039.48 01/20/2026
WATER PERMIT INSPECTION ¤40.00 01/20/2026
WATER PERMIT REVIEW ¤25.00 01/20/2026
SITE PLAN 30 ¤30.00 01/20/2026
WATER-METER ¤965.03 01/20/2026
WATER- TURN ON ¤50.00 01/20/2026
WATER- TURN ON ¤50.00 01/20/2026
ADMINISTRATIVE RESIDENTIAL ¤30.00 01/20/2026
INSPECTION - RESIDENTIAL ¤1,509.75 01/20/2026
PLAN REVIEW - RESIDENTIAL ¤428.22 01/20/2026
Fees Total Due: ¤0.00 Total Paid: ¤26,254.55