I want to search for...

Permit #2026010422

Permit Details

Status: INSPECT

Parcel Id: 01-12-30-5550-00030-0030
OPENED PORCH (WITH ROOF) : 705 sqft
Total Square Footage: 705 sqft
Block: 00030
Subdivision: -
Job Phone: 386-237-5837
Location Address: 4 ETNA WAY
Type: BA - BUILDING ADDITION
Issue Date: 02/04/2026
NOC: RECORDED
Applicant name: MARSEL GILMANSHIN
Owner: LEONID LEVIT AND ELLA CHAGEYEVA

Address

47 EDITH POPE DRIVE

PALM COAST, FL 32164

Lot: 0030
Contracted Stated Job Value: ¤20,000.00
Job Description: house addition
Type: CN

Contractor

GILMANS DEVELOPMENT CORP
Status Location Address State License Number Phone
ACTIVE

4873 PALM COAST PARKWAY NW #4

PALM COAST, FL 32137

CBC1263180 (Exp: 08/31/2026) 386-237-5837

Sub Contractors

WILLIAM TODD SIKES
Status Location Address State License Number Phone
ACTIVE

83 PORT ROYAL DR

ST AUGUSTINE, FL 32084

EC0002726 (Exp: 08/31/2026) 904-762-8762

Inspection History

Type Request Date Result Inspector
ALL ROUGH 05/20/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 5/20/2026 3:58:18 PM *** Approved
LATH/BRICK/ WATER BARRIER 05/12/2026 APPROVED HCAMACHO
ROOF VALLEY & METAL 05/01/2026 APPROVED HCAMACHO
Note: Inspector Notes from Inspection 2460 4/28/26 4. The Wood Lam does not have any attachments to the block wall on both ends. Plans call for (2) Heta 20's at each end --If not completed by next inspection, failure and fee will occur 4/14/2026 - PREVIOUS INSPECTION NOTES 1. Need to remove wood from inspection holes on the block to verify concrete on the down cell. 2. Please take a look at the roof framing detail and valley framing detail on the plans. Allot of the hardware is missing on the rafters, ridge beam and collar ties. 3. The hardware used on the rafters to the Wood Lam is the wrong kind. It calls for MTS20 & using H2.5. 4. The Wood Lam does not have any attachments to the block wall on both ends. Inspector Notes from Inspection 2340 *** NOTES ADDED BY RSIMS 3/2/2026 9:40:12 AM *** 3/2/26: 1). Electrical feed conduit at the back wall will need to be located inside the wall or otherwise protected from damage. NEC 300.4
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/28/2026 APPROVED - AS NOTED MCONTRYMAN
Note: 4/28/26 4. The Wood Lam does not have any attachments to the block wall on both ends. Plans call for (2) Heta 20's at each end --If not completed by next inspection, failure and fee will occur 4/14/2026 - PREVIOUS INSPECTION NOTES 1. Need to remove wood from inspection holes on the block to verify concrete on the down cell. 2. Please take a look at the roof framing detail and valley framing detail on the plans. Allot of the hardware is missing on the rafters, ridge beam and collar ties. 3. The hardware used on the rafters to the Wood Lam is the wrong kind. It calls for MTS20 & using H2.5. 4. The Wood Lam does not have any attachments to the block wall on both ends. Inspector Notes from Inspection 2340 *** NOTES ADDED BY RSIMS 3/2/2026 9:40:12 AM *** 3/2/26: 1). Electrical feed conduit at the back wall will need to be located inside the wall or otherwise protected from damage. NEC 300.4
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/14/2026 Disapproved - NO FEE HCAMACHO
Note: 1. Need to remove wood from inspection holes on the block to verify concrete on the down cell. 2. Please take a look at the roof framing detail and valley framing detail on the plans. Allot of the hardware is missing on the rafters, ridge beam and collar ties. 3. The hardware used on the rafters to the Wood Lam is the wrong kind. It calls for MTS20 & using H2.5. 4. The Wood Lam does not have any attachments to the block wall on both ends. Inspector Notes from Inspection 2340 *** NOTES ADDED BY RSIMS 3/2/2026 9:40:12 AM *** 3/2/26: 1). Electrical feed conduit at the back wall will need to be located inside the wall or otherwise protected from damage. NEC 300.4
TIE BEAM / LINTEL 03/02/2026 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 3/2/2026 9:40:12 AM *** 3/2/26: 1). Electrical feed conduit at the back wall will need to be located inside the wall or otherwise protected from damage. NEC 300.4
MONOLITHIC SLAB 02/09/2026 APPROVED BTAYLOR
BLD - BUILDING FINAL
ROW - FINAL INSPECTION
U -UTILITY RESIDENTIAL FINAL

Review History

Department Status Date In Date Out
PLENV COMPLETE 01/29/2026 02/03/2026
Note: Released By: DYLAN RODRIGUEZ - (386)986-2320 - DRODRIGUEZ@PALMCOASTGOV.COM no comment. Gopher Tortoises on site were previously relocated and no new active burrows have been found.
ZON COMPLETE 01/29/2026 01/30/2026
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
RSI COMPLETE 01/29/2026 02/03/2026
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NO NEED FOR FINAL SURVEY DUE TO SCREEN IS ON POOL DECK NO NEW ADDITION
ENGIN1 COMPLETE 01/29/2026 02/03/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON HOLD 01/16/2026 01/20/2026
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM repeat comment: No dimension provided. the proposed covered patio on the site plan and a provide the dimensions and the all the setbacks from the proposed addtion to property lines
BLD COMPLETE 01/15/2026 01/21/2026
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
ENGIN1 HOLD 01/15/2026 01/23/2026
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM The site plan must show where the new building addition and the sqft of the new addition.
RSI HOLD 01/15/2026 01/22/2026
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM The site plan must show where the new building addition and the sqft of the new addition.
ZON HOLD 01/15/2026 01/15/2026
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM add the proposed covered patio on the site plan and a provide the dimensions and the all the setbacks from the proposed addtion to property lines
PLENV HOLD 01/15/2026 01/16/2026
Note: Held By: DYLAN RODRIGUEZ - (386)986-2320 - DRODRIGUEZ@PALMCOASTGOV.COM 1.0 The site plan provided shows potential Gopher Tortoise burrows with potential impacts from construction. Please provide an approved After-action report after relocation has been completed. 2.0It also appears the Gopher Tortoise survey has surpassed the 90 day period they are accepted for FWC. Please provide a updated Gopher Tortoise survey.
ELEC COMPLETE 01/15/2026 01/21/2026
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMINISTRATIVE RESIDENTIAL ¤30.00 02/04/2026
INSPECTION - RESIDENTIAL ¤137.50 02/04/2026
PLAN REVIEW - RESIDENTIAL ¤65.00 02/04/2026
RSI PLAN REVIEW NEW ¤48.75 02/04/2026
RSI ROW FINAL INSPECTION ¤16.25 02/04/2026
SURCHARGE FS 533.721 ¤2.33 02/04/2026
SURCHARGE - FS 468.631 ¤3.49 02/04/2026
SITE PLAN 30 ¤30.00 02/04/2026
Fees Total Due: ¤0.00 Total Paid: ¤333.32