I want to search for...

Permit #2026010542

Permit Details

Status: INSPECT

Parcel Id: 07-11-31-7029-00540-0060
GARAGE: 508 sqft
OPENED PORCH (WITH ROOF) : 259 sqft
CONDITIONED SPACE: 2332 sqft
Total Square Footage: 3099 sqft
Block: 00540
Subdivision: 2209 - SECTION 29-ROYAL PALMS
Job Phone: 352-433-8382
Location Address: 20 RYKEN LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 02/27/2026
NOC: RECORDED
Applicant name: ALFREDO E SCHEER
Owner: ESTELA SPECS 1 LLC

Address

2601 S BAYSHORE DRIVE

COCONUT GROVE, FL 33133

Address

18TH FL

COCONUT GROVE, FL 33133

Lot: 0060
Contracted Stated Job Value: ¤165,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

ESTELA LIVING LLC
Status Location Address State License Number Phone
ACTIVE

237 S. DIXIE HWY, 4TH FLOOR

CORAL GABLES, FL 33133

CGC1534535 (Exp: 08/31/2026) 352-433-8382

Sub Contractors

JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
JOSEPH H STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PKWY

SANFORD, FL 32771

CAC043953 (Exp: 08/31/2026) 877-906-1113

Inspection History

Type Request Date Result Inspector
INSULATION 06/10/2026 APPROVED JSTEWART
Note: 6/9/2026 - PREVIOUS INSPECTION NOTES 6/3/2026 - PREVIOUS INSPECTION NOTES Items #1 and #2 from previous inspection not been fix #1-Missing Fl approval number for fix windows on bathrooms on FL approval sheet #2-FBCR 609.1-GAP AT WINDOW/DOOR REVEAL TOO LARGE > 1/4 " PER MANUFACTURERS SPECS ( front door top and garage door ) ( required solid shims ) #3-FBC 3303.5-SWALE CLEAR ( removed porta potty ) #4-brokend window in master bedroom ( please fix before final inspection ) Inspector Notes from Inspection 2420 Please fix items before next inspection #1-Missing Fl approval number for fix windows on bathrooms on FL approval sheet #2-FBCR 609.1-GAP AT WINDOW/DOOR REVEAL TOO LARGE > 1/4 " PER MANUFACTURERS SPECS ( front door and garage door )
INSULATION 06/09/2026 CANCELLED BY APPLICANT CVANSTRAHLEN
Note: 6/3/2026 - PREVIOUS INSPECTION NOTES Items #1 and #2 from previous inspection not been fix #1-Missing Fl approval number for fix windows on bathrooms on FL approval sheet #2-FBCR 609.1-GAP AT WINDOW/DOOR REVEAL TOO LARGE > 1/4 " PER MANUFACTURERS SPECS ( front door top and garage door ) ( required solid shims ) #3-FBC 3303.5-SWALE CLEAR ( removed porta potty ) #4-brokend window in master bedroom ( please fix before final inspection ) Inspector Notes from Inspection 2420 Please fix items before next inspection #1-Missing Fl approval number for fix windows on bathrooms on FL approval sheet #2-FBCR 609.1-GAP AT WINDOW/DOOR REVEAL TOO LARGE > 1/4 " PER MANUFACTURERS SPECS ( front door and garage door )
INSULATION 06/03/2026 Disapproved -FEE REQUIRED CVANSTRAHLEN
Note: Items #1 and #2 from previous inspection not been fix #1-Missing Fl approval number for fix windows on bathrooms on FL approval sheet #2-FBCR 609.1-GAP AT WINDOW/DOOR REVEAL TOO LARGE > 1/4 " PER MANUFACTURERS SPECS ( front door top and garage door ) ( required solid shims ) #3-FBC 3303.5-SWALE CLEAR ( removed porta potty ) #4-brokend window in master bedroom ( please fix before final inspection ) Inspector Notes from Inspection 2420 Please fix items before next inspection #1-Missing Fl approval number for fix windows on bathrooms on FL approval sheet #2-FBCR 609.1-GAP AT WINDOW/DOOR REVEAL TOO LARGE > 1/4 " PER MANUFACTURERS SPECS ( front door and garage door )
ALL ROUGH 05/29/2026 APPROVED - AS NOTED CVANSTRAHLEN
Note: Please fix items before next inspection #1-Missing Fl approval number for windows on FL approval sheet #2-FBCR 609.1-GAP AT WINDOW/DOOR REVEAL TOO LARGE > 1/4 " PER MANUFACTURERS SPECS ( front door and garage door )
WALL SHEATHING 05/28/2026 APPROVED CVANSTRAHLEN
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/21/2026 APPROVED CVANSTRAHLEN
ROOF VALLEY & METAL 05/18/2026 APPROVED CVANSTRAHLEN
ROOF SHEATHING 05/13/2026 APPROVED CVANSTRAHLEN
ROOF SHEATHING 05/12/2026 CANCELLED BY APPLICANT WEB
TIE BEAM / LINTEL 04/24/2026 APPROVED CVANSTRAHLEN
MONOLITHIC SLAB 04/15/2026 APPROVED CVANSTRAHLEN
Note: 4/14/2026 - PREVIOUS INSPECTION NOTES Please fix item before next inspection #1-Removed vapor barrier where ufer ground touch soil #2-Per FL building code Footing need 3" space from soil ( mark areas on foundation plans with blue sharpie )
MONOLITHIC SLAB 04/14/2026 Disapproved -FEE REQUIRED CVANSTRAHLEN
Note: Please fix item before next inspection #1-Removed vapor barrier where ufer ground touch soil #2-Per FL building code Footing need 3" space from soil ( mark areas on foundation plans with blue sharpie )
PLUMBING 1ST ROUGH UNDERGROUND 04/10/2026 APPROVED CVANSTRAHLEN
Note: 4/7/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1-FBCR P2503.5-NEEDS 5 FOOT HEAD TEST ON DWV #2-Please seperate Hot and cold supply lines in trench. Per manufactuer spec Min of 6" seperation. 308.9 Parallel water distribution systems. #3-Please sleeve all water supply lines that cross plumbing. FBCP 305.2 Stress and strain.
PLUMBING 1ST ROUGH UNDERGROUND 04/07/2026 Disapproved -FEE REQUIRED CVANSTRAHLEN
Note: Please fix items before next inspection #1-FBCR P2503.5-NEEDS 5 FOOT HEAD TEST ON DWV #2-Please seperate Hot and cold supply lines in trench. Per manufactuer spec Min of 6" seperation. 308.9 Parallel water distribution systems. #3-Please sleeve all water supply lines that cross plumbing. FBCP 305.2 Stress and strain.
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 04/06/2026 APPROVED JMUNSON
FORMBOARD SURVEY (OFFICE USE ONLY) 03/25/2026 APPROVED RRICKS
WATER METER INSTALLATION REQUEST 03/12/2026 APPROVED ISANDERSON
PEP TANK INSTALLATION REQUEST
U-CROSS CONNECTION
ROW- PRE-APRON (PRE-POUR)
ROW - FINAL APRON (AFTER POUR)
ROW - FINAL INSPECTION
U -UTILITY RESIDENTIAL FINAL
DRYWALL NAILING
BLD - BUILDING FINAL
GRAVITY SEWER TEST
SEWER TIE IN
ELECTRIC - EARLY POWER
LATH/BRICK/ WATER BARRIER

Review History

Department Status Date In Date Out
BLD COMPLETE 06/09/2026 06/11/2026
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 04/10/2026 04/14/2026
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 04/06/2026 04/06/2026
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SW1 COMPLETE 03/25/2026 03/25/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 03/25/2026 03/25/2026
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM
BLD COMPLETE 03/05/2026 03/10/2026
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SW1 COMPLETE 02/24/2026 02/27/2026
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM THERE IS ONE ELEVATION IN THE BACK HIGHPOINT IN DRAINAGE PATTERN THAT IS NOT LOWER THE .30 FROM THE BERM. APPROVING THIS GRADING PLAN THAT THE FINAL SURVEY AND THE FIELD MUST HAVE THAT .30 FROM THE DRAINAGE PATTERN TO THE BERM.
SW1 HOLD 02/18/2026 02/24/2026
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM RIGHT SIDE OF THE HOUSE PROPOSED ELEVATIONS NEED TO BE POSITIVE FALL TO THE FRONT ROADSIDE SWALE. THE GRADING PLAN SHOW THE ELEVATIONS ARE FLAT.
ZON COMPLETE 02/18/2026 02/18/2026
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
SW1 HOLD 02/06/2026 02/12/2026
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Previous comments not addressed: - There shall be positive fall to the front of the yard on the right side. - Changing existing elevations more than 0.01' along improved lots is not permiited.
SWALE COMPLETE 01/21/2026 01/28/2026
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
BLD COMPLETE 01/20/2026 01/26/2026
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 01/20/2026 01/23/2026
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 01/20/2026 01/26/2026
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/20/2026 01/21/2026
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 01/20/2026 01/21/2026
LOCATE COMPLETE 01/20/2026 01/22/2026
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 01/20/2026 01/22/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 01/20/2026 01/27/2026
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM 1) All right of way proposed elevations/ front property line elevations must be equal or greater then edge of pavement. 2) The right drainage pattern must have .10 of fall every 20' to the front roadside swale.
ZON COMPLETE 01/20/2026 01/20/2026
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
FC IMPACT FEE EMS ¤62.00 02/27/2026
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 02/27/2026
FC IMPACT FEE LIBRARY ¤268.00 02/27/2026
FIRE RES IMPACT FEE 10-25 ¤942.00 02/27/2026
PEP TANK INSTALL ¤756.74 02/27/2026
PARKS IMPACT FEE 10-25 ¤3,164.00 02/27/2026
RSI DRIVEWAY AFTER POUR ¤16.25 02/27/2026
RSE DRIVE PRE POUR INSPECTION ¤32.50 02/27/2026
RSI FIELD SURVEY INSPECTION ¤48.75 02/27/2026
RSI FORMBOARD REVIEW ¤16.25 02/27/2026
RSI PLAN REVIEW NEW ¤48.75 02/27/2026
RSI FNL SURVEY/GRADING CERT ¤48.75 02/27/2026
RSI ROW FINAL INSPECTION ¤16.25 02/27/2026
SCHOOL BOARD IMPACT FEE RES ¤5,450.00 02/27/2026
WASTEWATER MAIN EXTENSION IMPA ¤2,385.00 02/27/2026
SURCHARGE FS 533.721 ¤16.26 02/27/2026
SURCHARGE - FS 468.631 ¤24.38 02/27/2026
SW ENG RES REVIEW 240 ¤240.00 02/27/2026
WATER METER W/ TAP ¤2,326.93 02/27/2026
TRANSP RES IMPACT FEE 10-25 ¤8,791.64 02/27/2026
SEWER CREDIT (¤1,343.09) 02/27/2026
WASTEWATER PERM INSPECTION ¤80.00 02/27/2026
WASTEWATER PERM REVIEW ¤25.00 02/27/2026
SEWER CAPITAL FACILITY ¤4,415.00 02/27/2026
WATER CAPITAL FACILITY FEE ¤3,790.49 02/27/2026
WATER PERMIT REVIEW ¤25.00 02/27/2026
WATER MAIN EXTENSION IMPACT ¤917.27 02/27/2026
SITE PLAN 30 ¤30.00 02/27/2026
WATER- TURN ON ¤50.00 02/27/2026
ADMINISTRATIVE RESIDENTIAL ¤30.00 02/27/2026
INSPECTION - RESIDENTIAL ¤1,243.00 02/27/2026
PLAN REVIEW - RESIDENTIAL ¤352.56 02/27/2026
PLAN REVIEW - REVISION ¤32.50
PLAN REVIEW - REVISION ¤32.50
REINSPECTION RESIDENTIAL ¤40.00
REINSPECTION RESIDENTIAL ¤40.00
REINSPECTION RESIDENTIAL ¤40.00
Fees Total Due: ¤185.00 Total Paid: ¤34,487.68