Permit #2026010567
Permit Details
Status: INSPECT
| Parcel Id: 07-11-31-7026-00160-0030 |
| CONDITIONED SPACE: 1654 sqft |
| OPENED PORCH (WITH ROOF) : 119 sqft |
| GARAGE: 396 sqft |
| Total Square Footage: 2169 sqft |
| Block: 00160 |
| Subdivision: 2153 - SECTION 26-PINE GROVE |
| Job Phone: 407-476-8195 |
| Location Address: 5 PINETREE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/05/2026 |
| NOC: RECORDED |
| Applicant name: CARLETTE RENE WITTE |
| Owner: INB BFS LAND LLC |
|
Address 7380 WEST SAND LAKE ROAD ORLANDO, FL 32819 |
|
Address SUITE 600 ORLANDO, FL 32819 |
| Lot: 0030 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: Construction of New SFR |
| Type: CN |
Contractor
INNOVATIVE NATIONWIDE BUILDERS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3670 MAGUIRE BLVD #220 , |
CRC1330026 (Exp: 08/31/2026) | 855-694-6634 |
Sub Contractors
JASON LEE JAMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N WESTMONTE DR SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
CAC1820196 (Exp: 08/31/2026) | 407-404-4000 |
ANTHONY OKEITH FENNELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N. WESTMONTE DR, SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
EC13011194 (Exp: 08/31/2026) | 407-404-4000 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
Inspection History
| Type | Request Date | Result | Inspector |
| PEP TANK INSTALLATION REQUEST | 06/04/2026 | APPROVED | ISANDERSON |
| DRYWALL NAILING | 05/27/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/27/2026 10:46:21 AM *** Approved | |||
| INSULATION | 05/21/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/21/2026 9:01:59 AM *** Approved 5/20/2026 - PREVIOUS INSPECTION NOTES 5/20/26: *** Fireblocking still missing on side of Pantry Closet. Previously marked FB. Also, Fireblocking at bedroom entry does not meet code requirements for fire and smoke resistance. Change to a horizontal 2" x 4" (and fire foam) or firefoam any open spacing. Please firefoam any spacing at added fireblocking. 5/19/2026 - PREVIOUS INSPECTION NOTES 5/19/26: 1). Fireblocking missing at kitchen pantry wall and entryway to right side bedrooms. FB written on studs. FBC-R302.11 | |||
| INSULATION | 05/20/2026 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/20/2026 10:46:13 AM *** 5/20/26: *** Fireblocking still missing on side of Pantry Closet. Previously marked FB. Also, Fireblocking at bedroom entry does not meet code requirements for fire and smoke resistance. Change to a horizontal 2" x 4" (and fire foam) or firefoam any open spacing. Please firefoam any spacing at added fireblocking. 5/19/2026 - PREVIOUS INSPECTION NOTES 5/19/26: 1). Fireblocking missing at kitchen pantry wall and entryway to right side bedrooms. FB written on studs. FBC-R302.11 | |||
| INSULATION | 05/19/2026 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/19/2026 11:15:31 AM *** 5/19/26: 1). Fireblocking missing at kitchen pantry wall and entryway to right side bedrooms. FB written on studs. FBC-R302.11 | |||
| ALL ROUGH | 05/14/2026 | APPROVED | KSANDOE |
| Note: 5/12/2026 - PREVIOUS INSPECTION NOTES 5/12/26: Previously listed item 4 remains unresolved. 4). Front entry door has shim space that exceeds the 1/4" maximum and will require solid blocking. FBCR 609.1 5/8/2026 - PREVIOUS INSPECTION NOTES 5/8/26: 1). Fireblocking above Main Breaker panel does not meet minimum thickness as required. FBC-R302.11.1 (wires will need to be drilled through the new fireblocking once correction is completed). 2). Wires for Range and ODU are not phased out as required. NEC 200.6(B) 3). Primary bathroom: exhaust fan duct needs to be resealed at the roof deck. FBCR M1601.4.1 4). Front entry door has shim space that exceeds the 1/4" maximum and will require solid blocking. FBCR 609.1 3/24/26: Main underground water service piping is installed from house to meter valve (meter installed). Inspected and approved. RS | |||
| ALL ROUGH | 05/12/2026 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/12/2026 10:35:23 AM *** 5/12/26: Previously listed item 4 remains unresolved. 4). Front entry door has shim space that exceeds the 1/4" maximum and will require solid blocking. FBCR 609.1 5/8/2026 - PREVIOUS INSPECTION NOTES 5/8/26: 1). Fireblocking above Main Breaker panel does not meet minimum thickness as required. FBC-R302.11.1 (wires will need to be drilled through the new fireblocking once correction is completed). 2). Wires for Range and ODU are not phased out as required. NEC 200.6(B) 3). Primary bathroom: exhaust fan duct needs to be resealed at the roof deck. FBCR M1601.4.1 4). Front entry door has shim space that exceeds the 1/4" maximum and will require solid blocking. FBCR 609.1 3/24/26: Main underground water service piping is installed from house to meter valve (meter installed). Inspected and approved. RS | |||
| ALL ROUGH | 05/08/2026 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/8/2026 11:19:49 AM *** 5/8/26: 1). Fireblocking above Main Breaker panel does not meet minimum thickness as required. FBC-R302.11.1 (wires will need to be drilled through the new fireblocking once correction is completed). 2). Wires for Range and ODU are not phased out as required. NEC 200.6(B) 3). Primary bathroom: exhaust fan duct needs to be resealed at the roof deck. FBCR M1601.4.1 4). Front entry door has shim space that exceeds the 1/4" maximum and will require solid blocking. FBCR 609.1 3/24/26: Main underground water service piping is installed from house to meter valve (meter installed). Inspected and approved. RS | |||
| ELECTRIC-TUG | 05/07/2026 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/7/2026 10:04:55 AM *** 5/7/26: FPL emailed - Approved for TUG. 5/6/2026 - PREVIOUS INSPECTION NOTES Tug outlet is not trimmed out, needs to have outlet and cover to be safed off. | |||
| ELECTRIC-TUG | 05/06/2026 | Disapproved - NO FEE | RMARTIN |
| Note: Tug outlet is not trimmed out, needs to have outlet and cover to be safed off. | |||
| LATH/BRICK/ WATER BARRIER | 05/04/2026 | APPROVED | JSTEWART |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/01/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/1/2026 2:27:36 PM *** Approved Inspector Notes from Inspection 2467 *** NOTES ADDED BY RSIMS 4/28/2026 12:59:54 PM *** 4/28/26: Virtually approved via FaceTime video/audio phone app at @ 1140. Inspection 2465 Roof Sheathing was approved as noted on 4/16/26 for Inspection 2460 that still needs to be completed. Inspector Notes from Inspection 2450 *** NOTES ADDED BY RSIMS 4/17/2026 12:38:17 PM *** 4/17/26: Previous note from Roof Sheathing Inspections remains unresolved. Deficiency added to Inspection 2460. Inspector Notes from Inspection 2465 *** NOTES ADDED BY RSIMS 4/16/2026 9:39:30 AM *** 4/16/26: NOTE: Please have excess dirt / unknown substance removed from Trusses T11 and T12 so that original integrity can be verified prior to scheduling inspection 2460 - RS/B/T/DC. Inspector Notes from Inspection 2340 Please have a complete set of plans for inspector in future. Also, have container on site and clean up debris by next inspecton. | |||
| GRAVITY SEWER TEST | 04/30/2026 | APPROVED - AS NOTED | HCAMACHO |
| Note: No PEP tank installed and not connected. | |||
| ROOF VALLEY & METAL | 04/28/2026 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/28/2026 12:59:54 PM *** 4/28/26: Virtually approved via FaceTime video/audio phone app at @ 1140. Inspection 2465 Roof Sheathing was approved as noted on 4/16/26 for Inspection 2460 that still needs to be completed. Inspector Notes from Inspection 2450 *** NOTES ADDED BY RSIMS 4/17/2026 12:38:17 PM *** 4/17/26: Previous note from Roof Sheathing Inspections remains unresolved. Deficiency added to Inspection 2460. Inspector Notes from Inspection 2465 *** NOTES ADDED BY RSIMS 4/16/2026 9:39:30 AM *** 4/16/26: NOTE: Please have excess dirt / unknown substance removed from Trusses T11 and T12 so that original integrity can be verified prior to scheduling inspection 2460 - RS/B/T/DC. Inspector Notes from Inspection 2340 Please have a complete set of plans for inspector in future. Also, have container on site and clean up debris by next inspecton. | |||
| WALL SHEATHING | 04/17/2026 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/17/2026 12:38:17 PM *** 4/17/26: Previous note from Roof Sheathing Inspections remains unresolved. Deficiency added to Inspection 2460. Inspector Notes from Inspection 2465 *** NOTES ADDED BY RSIMS 4/16/2026 9:39:30 AM *** 4/16/26: NOTE: Please have excess dirt / unknown substance removed from Trusses T11 and T12 so that original integrity can be verified prior to scheduling inspection 2460 - RS/B/T/DC. Inspector Notes from Inspection 2340 Please have a complete set of plans for inspector in future. Also, have container on site and clean up debris by next inspecton. | |||
| ROOF SHEATHING | 04/16/2026 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/16/2026 9:39:30 AM *** 4/16/26: NOTE: Please have excess dirt / unknown substance removed from Trusses T11 and T12 so that original integrity can be verified prior to scheduling inspection 2460 - RS/B/T/DC. Inspector Notes from Inspection 2340 Please have a complete set of plans for inspector in future. Also, have container on site and clean up debris by next inspecton. | |||
| TIE BEAM / LINTEL | 04/06/2026 | APPROVED - AS NOTED | PKNAPIK |
| Note: Please have a complete set of plans for inspector in future. Also, have container on site and clean up debris by next inspecton. | |||
| MONOLITHIC SLAB | 03/30/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 3/30/2026 9:48:00 AM *** Approved 3/26/2026 - PREVIOUS INSPECTION NOTES 3/26/26: 1): Garage front footer > remove roots from footer area. FBC R318.6.2 2). Please remove any dirt cave in caused by rain throughout footers. FBC-R404.1.3.3.7.4 | |||
| MONOLITHIC SLAB | 03/26/2026 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 3/26/2026 2:51:53 PM *** 3/26/26: 1): Garage front footer > remove roots from footer area. FBC R318.6.2 2). Please remove any dirt cave in caused by rain throughout footers. FBC-R404.1.3.3.7.4 | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/24/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 3/24/2026 1:23:52 PM *** 3/24/26: Main underground water service piping is installed from house to meter valve (meter installed). Inspected and approved. RS | |||
| FORMBOARD SURVEY (OFFICE USE ONLY) | 03/23/2026 | APPROVED | RRICKS |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 03/19/2026 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 03/04/2026 | APPROVED | ISANDERSON |
| BLD - BUILDING FINAL | |||
| U-CROSS CONNECTION | |||
| ROW- PRE-APRON (PRE-POUR) | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | |||
| SEWER TIE IN | |||
| ELECTRIC - EARLY POWER |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 04/17/2026 | 04/21/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/20/2026 | 03/23/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/20/2026 | 03/20/2026 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/19/2026 | 03/19/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/28/2026 | 01/28/2026 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/28/2026 | 02/02/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 01/21/2026 | 01/28/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/20/2026 | 01/23/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 01/20/2026 | 01/23/2026 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 01/20/2026 | 01/26/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/20/2026 | 01/21/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 01/20/2026 | 01/22/2026 |
| LOCATE | COMPLETE | 01/20/2026 | 01/22/2026 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 01/20/2026 | 01/22/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/20/2026 | 01/27/2026 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 01/20/2026 | 01/21/2026 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plna : please correct the map panel number |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| FC IMPACT FEE EMS | ¤62.00 | 02/05/2026 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 02/05/2026 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 02/05/2026 |
| FIRE RES IMPACT FEE 10-25 | ¤942.00 | 02/05/2026 |
| PEP TANK INSTALL | ¤756.74 | 02/05/2026 |
| PARKS IMPACT FEE 10-25 | ¤3,164.00 | 02/05/2026 |
| RSI DRIVEWAY AFTER POUR | ¤16.25 | 02/05/2026 |
| RSE DRIVE PRE POUR INSPECTION | ¤32.50 | 02/05/2026 |
| RSI FIELD SURVEY INSPECTION | ¤48.75 | 02/05/2026 |
| RSI FORMBOARD REVIEW | ¤16.25 | 02/05/2026 |
| RSI PLAN REVIEW NEW | ¤48.75 | 02/05/2026 |
| RSI FNL SURVEY/GRADING CERT | ¤48.75 | 02/05/2026 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 02/05/2026 |
| SCHOOL BOARD IMPACT FEE RES | ¤5,450.00 | 02/05/2026 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,385.00 | 02/05/2026 |
| SURCHARGE FS 533.721 | ¤11.56 | 02/05/2026 |
| SURCHARGE - FS 468.631 | ¤17.34 | 02/05/2026 |
| SW ENG RES REVIEW 240 | ¤240.00 | 02/05/2026 |
| WATER METER W/ TAP | ¤2,326.93 | 02/05/2026 |
| TRANSP RES IMPACT FEE 10-25 | ¤6,235.58 | 02/05/2026 |
| SEWER CREDIT | (¤1,147.00) | 02/05/2026 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 02/05/2026 |
| WASTEWATER PERM REVIEW | ¤25.00 | 02/05/2026 |
| SEWER CAPITAL FACILITY | ¤4,415.00 | 02/05/2026 |
| WATER CAPITAL FACILITY FEE | ¤3,790.49 | 02/05/2026 |
| WATER PERMIT REVIEW | ¤25.00 | 02/05/2026 |
| WATER MAIN EXTENSION IMPACT | ¤917.27 | 02/05/2026 |
| SITE PLAN 30 | ¤30.00 | 02/05/2026 |
| WATER- TURN ON | ¤50.00 | 02/05/2026 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/05/2026 |
| INSPECTION - RESIDENTIAL | ¤877.25 | 02/05/2026 |
| PLAN REVIEW - RESIDENTIAL | ¤248.82 | 02/05/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | |
| REINSPECTION RESIDENTIAL | ¤40.00 | |
| Fees | Total Due: ¤80.00 | Total Paid: ¤31,646.48 |