I want to search for...

Permit #2026010576

Permit Details

Status: COED

Parcel Id: 07-11-31-7028-00570-0320
Block: 00570
Subdivision: 7028 -
Job Phone: 386-338-7926
Location Address: 2 PORPOISE LN
Type: RF - REROOF
Issue Date: 01/20/2026
NOC: RECORDED
Applicant name: DANIEL J LUSINSKI
Owner: CLARIN PAUL & DEBRA H&W

Address

2 PORPOISE LANE

PALM COAST, FL 32164

Lot: 0320
Contracted Stated Job Value: ¤17,485.00
Job Description: Roof replacement
Type: CN

Contractor

CHARDANI ROOFING, INC
Status Location Address Mailing Address State License Number Phone
ACTIVE

389 PALM COAST PARKWAY SW

PALM COAST, FL 32137

#4

PALM COAST, FL 32137

CCC1330133 (Exp: 08/31/2026) 386-338-7926

Inspection History

Type Request Date Result Inspector
ROOF FINAL 01/27/2026 APPROVED CVANSTRAHLEN
Note:
ROOF FINAL 01/26/2026 CANCELLED BY APPLICANT WEB
Note: 1/23/2026 - PREVIOUS INSPECTION NOTES 1/23/26: 1). Off ridge vents are not secured along the front flange as required by Manufacturer FBC[A]-107.4 & FBC-R806.4 & R903.1. 2). Damaged cap shingle needs to be replaced. Right side hip above garage front side. Marked with yellow crayon. FBC [A]107.4 3). Excess project material needs to be removed from site for final inspection. FBC [A] 110.3(6) Inspector Notes from Inspection 2468 *** NOTES ADDED BY RSIMS 1/21/2026 3:19:11 PM *** 1/21/26: First stop at @ 1320. Not ready! Still putting down the first run of underlayment and stripping the front of house. I will stop back ONLY if time allows.
ROOF FINAL 01/23/2026 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 1/23/2026 11:14:01 AM *** 1/23/26: 1). Off ridge vents are not secured along the front flange as required by Manufacturer FBC[A]-107.4 & FBC-R806.4 & R903.1. 2). Damaged cap shingle needs to be replaced. Right side hip above garage front side. Marked with yellow crayon. FBC [A]107.4 3). Excess project material needs to be removed from site for final inspection. FBC [A] 110.3(6) Inspector Notes from Inspection 2468 *** NOTES ADDED BY RSIMS 1/21/2026 3:19:11 PM *** 1/21/26: First stop at @ 1320. Not ready! Still putting down the first run of underlayment and stripping the front of house. I will stop back ONLY if time allows.
ROOF AFFIDAVIT 01/22/2026 APPROVED JROSARIO
ROOF IN PROGRESS- MIDROOF 01/21/2026 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 1/21/2026 3:19:11 PM *** 1/21/26: First stop at @ 1320. Not ready! Still putting down the first run of underlayment and stripping the front of house. I will stop back ONLY if time allows.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 01/25/2026
SURCHARGE FS 533.721 ¤2.00 01/20/2026
SURCHARGE - FS 468.631 ¤2.00 01/20/2026
ADMINISTRATIVE RESIDENTIAL ¤30.00 01/20/2026
INSPECTION - RESIDENTIAL ¤60.00 01/20/2026
Fees Total Due: ¤0.00 Total Paid: ¤134.00