I want to search for...
Permit #2026010722
Permit Details
Status: INSPECT
| Parcel Id: 07-11-31-7016-00040-0040 |
| CONDITIONED SPACE: 1765 sqft |
| GARAGE: 751 sqft |
| OPENED PORCH (WITH ROOF) : 319 sqft |
| Total Square Footage: 2835 sqft |
| Block: 00040 |
| Subdivision: 2201 - SECTION 16-COUNTRY CLUB COVE |
| Job Phone: 386-283-2035 |
| Location Address: 33 COLECHESTER LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/27/2026 |
| NOC: RECORDED |
| Applicant name: OLEG BELINSKIY |
| Owner: PAUL DONALD R JR & LINDA G H&W |
|
Address 7 6TH ST ST AUGUSTINE, FL 32080 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤335,000.00 |
| Job Description: SINGLE FAMILY RESIDENTIAL HOUSE |
| Type: CN |
Contractor
FLORIDAS BEST BUILDERS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE PALM COAST, FL 32164 |
CBC1264760 (Exp: 08/31/2026) | 386-283-2035 |
Sub Contractors
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
TIMUR ISPARYAN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
3665 SPRINK PARK ROAD JACKSONVILLE , FL 32207 |
CMC1249968 (Exp: 08/31/2026) | 904-245-1818 | 904-337-1910 |
FERNANDO MEZA SR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
457 CHELSEA PLACE AVE ORMOND BEACH, FL 32174 |
EC13003906 (Exp: 08/31/2026) | 386-241-5211 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROOF VALLEY & METAL | 06/08/2026 | APPROVED | MCONTRYMAN |
| Note: Inspector Notes from Inspection 2460 1.B01 missing a peice of eng. marked. 2.Remove all shiners from roof decking.FBC R803.2.3 *Will check at next inspection.* | |||
| WALL SHEATHING | 06/02/2026 | APPROVED | HCAMACHO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/02/2026 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1.B01 missing a peice of eng. marked. 2.Remove all shiners from roof decking.FBC R803.2.3 *Will check at next inspection.* | |||
| TIE BEAM / LINTEL | 05/08/2026 | APPROVED | MCONTRYMAN |
| Note: 5/5/2026 - PREVIOUS INSPECTION NOTES 5/5/26 1. Block grout joint exceeded in rear left corner (by door way) FBCR 606.3.1 2. Block grout joint exceeded in left rear window FBCR 606.3.1 --Inspector will meet contractor on site to show areas in need of fixing if you need 4/30/2026 - PREVIOUS INSPECTION NOTES 4/30/26 1. Block grout joint exceeded in rear left corner (by door way) FBCR 606.3.1 2. Block grout joint exceeded in left rear window FBCR 606.3.1 3. Need to move hose bib in front left window and replace the sill, as it was cut to accomodate the line. Also the grout spacing on the block below this window FBCR 606.3.1 | |||
| TIE BEAM / LINTEL | 05/05/2026 | Disapproved -FEE REQUIRED | MCONTRYMAN |
| Note: 5/5/26 1. Block grout joint exceeded in rear left corner (by door way) FBCR 606.3.1 2. Block grout joint exceeded in left rear window FBCR 606.3.1 --Inspector will meet contractor on site to show areas in need of fixing if you need 4/30/2026 - PREVIOUS INSPECTION NOTES 4/30/26 1. Block grout joint exceeded in rear left corner (by door way) FBCR 606.3.1 2. Block grout joint exceeded in left rear window FBCR 606.3.1 3. Need to move hose bib in front left window and replace the sill, as it was cut to accomodate the line. Also the grout spacing on the block below this window FBCR 606.3.1 | |||
| TIE BEAM / LINTEL | 04/30/2026 | Disapproved - NO FEE | MCONTRYMAN |
| Note: 4/30/26 1. Block grout joint exceeded in rear left corner (by door way) FBCR 606.3.1 2. Block grout joint exceeded in left rear window FBCR 606.3.1 3. Need to move hose bib in front left window and replace the sill, as it was cut to accomodate the line. Also the grout spacing on the block below this window FBCR 606.3.1 | |||
| TIE BEAM / LINTEL | 04/29/2026 | CANCELLED BY APPLICANT | WEB |
| MONOLITHIC SLAB | 04/06/2026 | APPROVED | MCONTRYMAN |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/31/2026 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: Water meter installed | |||
| FORMBOARD SURVEY (OFFICE USE ONLY) | 03/30/2026 | APPROVED | RRICKS |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 03/12/2026 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 03/05/2026 | APPROVED | ISANDERSON |
| U-CROSS CONNECTION | |||
| ROW- PRE-APRON (PRE-POUR) | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | |||
| LATH/BRICK/ WATER BARRIER | |||
| GRAVITY SEWER TEST | |||
| SEWER TIE IN | |||
| ELECTRIC - EARLY POWER | |||
| ALL ROUGH | |||
| INSULATION | |||
| DRYWALL NAILING | |||
| BLD - BUILDING FINAL |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 05/28/2026 | 06/01/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/15/2026 | 04/16/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/15/2026 | 04/15/2026 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 04/15/2026 | 04/16/2026 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM According to the Foundation Survey submitted on 4/15/26, the structure will not fall inside the SFHA. No elevation certificates are required. | |||
| SW1 | COMPLETE | 03/30/2026 | 03/30/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/30/2026 | 03/30/2026 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/16/2026 | 03/18/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/12/2026 | 03/12/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/23/2026 | 02/23/2026 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Bring originals to the office for processing. | |||
| SWALE | COMPLETE | 02/17/2026 | 03/03/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/13/2026 | 02/17/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/13/2026 | 02/17/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 02/13/2026 | 02/23/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/13/2026 | 02/23/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/13/2026 | 02/18/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 02/13/2026 | 02/13/2026 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM please correct the Printed names as well first, middle , last | |||
| CUSVC | COMPLETE | 02/13/2026 | 02/19/2026 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ZON | HOLD | 01/29/2026 | 01/29/2026 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Row agreement :fill out the form correctly thats not the last name Paul is the last name | |||
| SW1 | HOLD | 01/28/2026 | 01/28/2026 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Disregard previous HOLD comments New HOLD Comments: - There is no benchmark on grading plan. - On the left side there are slopes greater than 4:1 between lot lines and interior swale. - Additionally on the right side of the home there are several proposed slopes at the max slope allowed. Please ensure if there are no revisions to the proposed elevation that the 4:1 slopes are not exceeded during constrution, which will result in a hold. | |||
| PLFM | COMPLETE | 01/23/2026 | 01/27/2026 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM According to the Drainage and Site Plans submitted on 1/22/26, the structure will not fall inside the SFHA. No elevation certificates are required. | |||
| BLD | HOLD | 01/22/2026 | 01/27/2026 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. Provide presumptive load bearing value used for foundation design per R401.4.1 on foundation page. 2. Plans need to be digitally signed, sealed, and verifiable. 3. Truss packet needs to have address. 4. Provide complete truss plan submittal packet to include all of the following: A. Complete truss plan packet, signed and sealed by a Florida licensed professional engineer (the truss design engineer) B. Truss layout / placement plan from truss manufacturer C. Truss profile plan sheets for all trusses. D. Complete truss plan packet cover sheet or first page to include the design professional of record (building design engineer or architect) approval stamp (shop drawing review) indicating acceptance and approval of truss design (Not wet seal) | |||
| CUSVC | HOLD | 01/22/2026 | 01/30/2026 |
| Note: Held By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM Please upload a new utility application to reflect single family instead of duplex | |||
| ELEC | HOLD | 01/22/2026 | 01/27/2026 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in office. NEC 2020 210.52 2. Washer and dryer need to be GFCI protected. NEC 2020 210.8 3. DW outlet can not be located behind the DW. NEC 2020 422.16 4. Electric load calcs need to include pool equipment 5. Submit a riser diagram that includes all wire sizes and breaker sizes. Also must include the surge protectors and outside disconnects. NEC 2020 230.67, 230.85 | |||
| ENGIN1 | HOLD | 01/22/2026 | 01/23/2026 |
| Note: Held By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM Benchmark note missing elevation. | |||
| GAS | CANCEL | 01/22/2026 | 01/23/2026 |
| LOCATE | COMPLETE | 01/22/2026 | 01/30/2026 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 01/22/2026 | 01/26/2026 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide return air out of home office on duct layout | |||
| SW1 | HOLD | 01/22/2026 | 01/28/2026 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM - There is no benchmark on grading plan. - On the left side there are slopes greater than 4:1 between lot lines and interior swale. - Additionally on the right side of the home there are several proposed slopes at the max slope allowed. Please ensure if there are no revisions to the proposed elevation that the 4:1 slopes are not exceeded during constrution, which will result in a hold. - Please provide paver detail for driveway | |||
| ZON | HOLD | 01/22/2026 | 01/28/2026 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan Plantings will be needed across the front of the foundtion 8 are needed across the front of the house. Front entry will require shrubs House needs to meet the all setbacks currently that house does not meet the setbacks. Landscape: Residential homes shall provide a foundation planting consisting of 16 shrubs on interior lots. Eight shrubs shall be planted in front of home and four shrubs planted on each side of the home. The corners of the home shall be wrapped with shrubbery or have an understory tree planted there Floor Plan: please rename the office to study. Elevation plan: one more form of articulation needed. Facade articulation is required to add interest to a building. The following features shall be acceptable techniques of exterior articulation. A base course or plinth course: Banding, molding, or stringcourses; quoins; oriels; cornices; arches; balconies; brackets; shutters; keystones; dormers; louvers; as part of the exterior wall construction. ROW agreement: Needed for paver driveway Right of way agreement needed please have all owners on deed sign and notarize. Names to be the same as the deed. Please submit it through the portal for review first, once approved the originals will be requested to be brought into our office for processing |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| FC IMPACT FEE EMS | ¤62.00 | 02/27/2026 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 02/27/2026 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 02/27/2026 |
| FIRE RES IMPACT FEE 10-25 | ¤942.00 | 02/27/2026 |
| RECORDING FEE REIMBURSE DOC | ¤52.50 | 02/27/2026 |
| PARKS IMPACT FEE 10-25 | ¤3,164.00 | 02/27/2026 |
| RSI DRIVEWAY AFTER POUR | ¤16.25 | 02/27/2026 |
| RSE DRIVE PRE POUR INSPECTION | ¤32.50 | 02/27/2026 |
| RSI FIELD SURVEY INSPECTION | ¤48.75 | 02/27/2026 |
| RSI FORMBOARD REVIEW | ¤16.25 | 02/27/2026 |
| RSI PLAN REVIEW NEW | ¤48.75 | 02/27/2026 |
| RSI FNL SURVEY/GRADING CERT | ¤48.75 | 02/27/2026 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 02/27/2026 |
| SCHOOL BOARD IMPACT FEE RES | ¤5,450.00 | 02/27/2026 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,385.00 | 02/27/2026 |
| SURCHARGE FS 533.721 | ¤13.57 | 02/27/2026 |
| SURCHARGE - FS 468.631 | ¤20.36 | 02/27/2026 |
| SW ENG RES REVIEW 240 | ¤240.00 | 02/27/2026 |
| WATER METER W/ TAP | ¤2,326.93 | 02/27/2026 |
| TRANSP RES IMPACT FEE 10-25 | ¤6,654.05 | 02/27/2026 |
| SEWER CREDIT | (¤1,147.00) | 02/27/2026 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 02/27/2026 |
| WASTEWATER PERM REVIEW | ¤25.00 | 02/27/2026 |
| SEWER CAPITAL FACILITY | ¤4,415.00 | 02/27/2026 |
| WATER CAPITAL FACILITY FEE | ¤3,790.49 | 02/27/2026 |
| WATER PERMIT REVIEW | ¤25.00 | 02/27/2026 |
| WATER MAIN EXTENSION IMPACT | ¤917.27 | 02/27/2026 |
| SITE PLAN 30 | ¤30.00 | 02/27/2026 |
| WATER- TURN ON | ¤50.00 | 02/27/2026 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/27/2026 |
| INSPECTION - RESIDENTIAL | ¤1,034.00 | 02/27/2026 |
| PLAN REVIEW - RESIDENTIAL | ¤293.28 | 02/27/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | |
| Fees | Total Due: ¤40.00 | Total Paid: ¤31,566.95 |