I want to search for...

Permit #2026010972

Permit Details

Status: COED

Parcel Id: 04-11-30-5571-00000-3030
CONDITIONED SPACE: 1638 sqft
GARAGE: 420 sqft
OPENED PORCH (WITH ROOF) : 96 sqft
OPENED PORCH (WITH ROOF) : 112 sqft
Total Square Footage: 2266 sqft
Subdivision: 2366 - SOMERSET SUBDIVISION PH 2
Job Phone: 904-596-6645
Location Address: 101 TEA OLIVE DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 02/11/2026
NOC: RECORDED
Applicant name: MICHAEL T HOLDER
Owner: KB HOME JACKSONVILLE LLC

Address

10475 FORTUNE PARKWAY

JACKSONVILLE, FL 32256

Address

SUITE 100

JACKSONVILLE, FL 32256

Lot: 303
Contracted Stated Job Value: ¤140,000.00
Job Description: SINGLE FAMILY DWELLING
Type: CN

Contractor

KB HOME JACKSONVILLE, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

10475 FORTUNE PKWY

JACKSONVILLE, FL 32256

SUITE 100

JACKSONVILLE, FL 32256

CGC1509034 (Exp: 08/31/2026) 904-596-6645

Sub Contractors

BOBBY WAYNE CAMPBELL
Status Location Address State License Number Phone
ACTIVE

117 GUTHRIE ROAD

GREEN COVE SPRINGS, FL 32043

CCC1326752 (Exp: 08/31/2026) 904-200-1600
LARRY WILLIAMS
Status Location Address State License Number Phone
ACTIVE

1750 EMERSON ST

JACKSONVILLE, FL 32207

LI45034 (Exp: 08/31/2026) 904-721-5431
JAMES E LINTON
Status Location Address State License Number Phone
ACTIVE

200 COLLEGE DR

ORANGE PARK, FL 32065

EC0001152 (Exp: 08/31/2026) 904-272-0272
COREY MICHAEL TENNANT
Status Location Address State License Number Phone
ACTIVE

3370 AGRICULTURAL CNETER DR

ST AUGUSTINE, FL 32092

CAC1819063 (Exp: 08/31/2026) 904-829-8898
BENJAMIN MICHAEL RAY
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

6310 MABLETON PKWY

JACKSONVILLE, FL 32216

SUITE 1000

MABLETON, GA 30126

CFC1428415 (Exp: 08/31/2026) 904-861-5421 904-861-5426

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 05/19/2026 APPROVED - AS NOTED PFLANAGAN
Note: MOVING POD WAS ON DRIVEWAY
ROW - FINAL INSPECTION 05/19/2026 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
U -UTILITY RESIDENTIAL FINAL 05/19/2026 FINAL APPROVED BHAINES
U-CROSS CONNECTION 05/12/2026 APPROVED BWRIGHT
BLD - BUILDING FINAL 05/12/2026 FINAL APPROVED JSTEWART
Note: 5/7/2026 - PREVIOUS INSPECTION NOTES 1. Locking caps need to be secured. 2. Missing trim at left side double window. per plan 3. Seal wall at communication penetrations (exterior) 4. secure liquid tight at tug receptacle. 5. Missing a screw to secure inner face panel at main disconnect. 6. AHU is being worked on (installed) Thermostat not installed unable to inspect. 7. Anti tip bracket. 8. Kitchen hood exhaust duct not installed and needs sealed.
BLD - BUILDING FINAL 05/07/2026 Disapproved -FEE REQUIRED JSTEWART
Note: 1. Locking caps need to be secured. 2. Missing trim at left side double window. per plan 3. Seal wall at communication penetrations (exterior) 4. secure liquid tight at tug receptacle. 5. Missing a screw to secure inner face panel at main disconnect. 6. AHU is being worked on (installed) Thermostat not installed unable to inspect. 7. Anti tip bracket. 8. Kitchen hood exhaust duct not installed and needs sealed.
ELECTRIC - EARLY POWER 04/17/2026 APPROVED - AS NOTED JSTEWART
Note: Authorize release of email.
ELECTRIC-TUG 04/17/2026 CANCELLED BY INSPECTOR JSTEWART
Note: Not needed at Early power stage.
WINDOW NAILING 04/17/2026 APPROVED JSTEWART
Note: NOTE: onsite inspection for Insulation, and water barrier okay to trim. Product approval to complete. 3/30/2026 - PREVIOUS INSPECTION NOTES Anchoring and shim spacing approved. to complete approval, 1. Product approval needs revised, 2. Insulation around the margins. 3. Flashing on exterior around the margins (tape). Inspector Notes from Inspection 2493 Drywall nailing is approved. Added a window nailing inspection for, Original Sliding glass door has been removed, and is being replaced with a french door. Please submit a revision of Product approval for this change. Please dont trim or cover anchors once installed, at window nailing inspection will need to see for the following....Anchoring, water barrier, insulation.
ROW- PRE-APRON (PRE-POUR) 04/01/2026 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. . TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, IN THE UPCOMING MONTHS THE DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS WILL BE REQUIRED TO BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. YOU WILL RECEIVE A NEWS BLAST WHEN THIS BECOMES NECESSARY
WINDOW NAILING 03/30/2026 PARTIALLY APPROVED JSTEWART
Note: Anchoring and shim spacing approved. to complete approval, 1. Product approval needs revised, 2. Insulation around the margins. 3. Flashing on exterior around the margins (tape). Inspector Notes from Inspection 2493 Drywall nailing is approved. Added a window nailing inspection for, Original Sliding glass door has been removed, and is being replaced with a french door. Please submit a revision of Product approval for this change. Please dont trim or cover anchors once installed, at window nailing inspection will need to see for the following....Anchoring, water barrier, insulation.
DRYWALL NAILING 03/27/2026 APPROVED - AS NOTED JSTEWART
Note: Drywall nailing is approved. Added a window nailing inspection for, Original Sliding glass door has been removed, and is being replaced with a french door. Please submit a revision of Product approval for this change. Please dont trim or cover anchors once installed, at window nailing inspection will need to see for the following....Anchoring, water barrier, insulation.
INSULATION 03/24/2026 APPROVED JSTEWART
Note: 3/23/2026 - PREVIOUS INSPECTION NOTES Previous note not rectified.....3. Hood exhaust duct lap requires (3) screws. . FBCR M1601.4.1 (Crimp joints for round metal ducts must be mechanically fastened with a minimum of three screws or rivets, equally spaced around the joint.) Inspector Notes from Inspection 2420 1. Gas bonding. FBCR G2411 2. Spare bath exhaust duct adapter needs secured to fan assembly. M1501.1 3. Hood exhaust duct lap requires (3) screws. . FBCR M1601.4.1 Will check at insulation. Water Line tie-in seen on virtual inspection, on 3/12/26 by Michael
LATH/BRICK/ WATER BARRIER 03/23/2026 APPROVED JSTEWART
Note: Inspector Notes from Inspection 2420 1. Gas bonding. FBCR G2411 2. Spare bath exhaust duct adapter needs secured to fan assembly. M1501.1 3. Hood exhaust duct lap requires (3) screws. . FBCR M1601.4.1 Will check at insulation. Water Line tie-in seen on virtual inspection, on 3/12/26 by Michael
INSULATION 03/23/2026 Disapproved - NO FEE JSTEWART
Note: Previous note not rectified.....3. Hood exhaust duct lap requires (3) screws. . FBCR M1601.4.1 (Crimp joints for round metal ducts must be mechanically fastened with a minimum of three screws or rivets, equally spaced around the joint.) Inspector Notes from Inspection 2420 1. Gas bonding. FBCR G2411 2. Spare bath exhaust duct adapter needs secured to fan assembly. M1501.1 3. Hood exhaust duct lap requires (3) screws. . FBCR M1601.4.1 Will check at insulation. Water Line tie-in seen on virtual inspection, on 3/12/26 by Michael
ALL ROUGH 03/19/2026 APPROVED - AS NOTED JSTEWART
Note: 1. Gas bonding. FBCR G2411 2. Spare bath exhaust duct adapter needs secured to fan assembly. M1501.1 3. Hood exhaust duct lap requires (3) screws. . FBCR M1601.4.1 Will check at insulation. Water Line tie-in seen on virtual inspection, on 3/12/26 by Michael
ROOF VALLEY & METAL 03/16/2026 APPROVED PKNAPIK
Note: Inspector Notes from Inspection 2450
WALL SHEATHING 03/12/2026 APPROVED - AS NOTED JSTEWART
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/12/2026 APPROVED - AS NOTED JSTEWART
Note: 1. Missing double stud post at girder A16 3 locations (double stud needs to be under the truss). 2. Missing tie downs HTS24's at girder A16 x3 3. Missing 2x4 post at girder B6. 4. Missing tie downs HTS24's at girder B6. 5. Double stud post for girder A15 needs to be directly under the truss. 6. Double stud for Truss B1 needs to be directly under the truss, Both sides. Will check at all rough.
SEWER TIE IN 03/12/2026 APPROVED - AS NOTED MCONTRYMAN
Note: Via Virtual Water Line tied seen in at inspection Inspector Notes from Inspection 2075 Via Virtual Water Line tied seen in at inspection 3/5/2026 - PREVIOUS INSPECTION NOTES 3/5/2026 - PREVIOUS INSPECTION NOTES
GRAVITY SEWER TEST 03/12/2026 APPROVED - AS NOTED MCONTRYMAN
Note: Via Virtual Water Line tied seen in at inspection 3/5/2026 - PREVIOUS INSPECTION NOTES
SEWER TIE IN 03/05/2026 CANCELLED BY APPLICANT JSTEWART
GRAVITY SEWER TEST 03/05/2026 CANCELLED BY APPLICANT JSTEWART
MONOLITHIC SLAB 03/03/2026 APPROVED JSTEWART
Note: 3/2/2026 - PREVIOUS INSPECTION NOTES 2 water supply lines and a DWV plumbing running thru a interior footing will need to be sleeved. FBCR P2603.4
MONOLITHIC SLAB 03/02/2026 Disapproved - NO FEE JSTEWART
Note: 2 water supply lines and a DWV plumbing running thru a interior footing will need to be sleeved. FBCR P2603.4
PLUMBING 1ST ROUGH UNDERGROUND 02/24/2026 APPROVED JSTEWART
WATER METER INSTALLATION REQUEST 02/24/2026 APPROVED ISANDERSON
FORMBOARD SURVEY (OFFICE USE ONLY) 02/23/2026 APPROVED PFLANAGAN

Review History

Department Status Date In Date Out
BLD COMPLETE 04/04/2026 04/06/2026
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SW1 COMPLETE 02/23/2026 02/23/2026
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 02/23/2026 02/23/2026
Note: Released By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM
ZON COMPLETE 02/04/2026 02/05/2026
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BLD COMPLETE 01/29/2026 02/04/2026
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 01/29/2026 02/04/2026
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 01/29/2026 02/03/2026
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/29/2026 01/30/2026
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS COMPLETE 01/29/2026 01/30/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
LOCATE COMPLETE 01/29/2026 02/02/2026
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 01/29/2026 01/30/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 01/29/2026 02/02/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON HOLD 01/29/2026 02/03/2026
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM there is another permit in ready status for this address. Permit # 2025080096 pleae cancel the one that needs to be.
URB COMPLETE 01/29/2026 02/02/2026
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 05/18/2026
FC IMPACT FEE EMS ¤62.00 02/11/2026
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 02/11/2026
FC IMPACT FEE LIBRARY ¤268.00 02/11/2026
FIRE RES IMPACT FEE 10-25 ¤942.00 02/11/2026
WATER METER W/OUT TAP ¤965.03 02/11/2026
PARKS IMPACT FEE 10-25 ¤3,164.00 02/11/2026
RECLAIM WATER PERMIT INSPECTIO ¤40.00 02/11/2026
RSI DRIVEWAY AFTER POUR ¤16.25 02/11/2026
RSE DRIVE PRE POUR INSPECTION ¤32.50 02/11/2026
RSI FIELD SURVEY INSPECTION ¤48.75 02/11/2026
RSI FORMBOARD REVIEW ¤16.25 02/11/2026
RSI PLAN REVIEW NEW ¤48.75 02/11/2026
RSI FNL SURVEY/GRADING CERT ¤48.75 02/11/2026
RSI ROW FINAL INSPECTION ¤16.25 02/11/2026
SCHOOL BOARD IMPACT FEE RES ¤5,450.00 02/11/2026
SURCHARGE FS 533.721 ¤11.74 02/11/2026
SURCHARGE - FS 468.631 ¤17.61 02/11/2026
TRANSP RES IMPACT FEE 10-25 ¤6,175.26 02/11/2026
WASTEWATER PERM INSPECTION ¤80.00 02/11/2026
WASTEWATER PERM REVIEW ¤25.00 02/11/2026
SEWER CAPITAL FACILITY ¤3,628.86 02/11/2026
WATER CAPITAL FACILITY FEE ¤3,091.14 02/11/2026
WATER PERMIT REVIEW ¤25.00 02/11/2026
SITE PLAN 30 ¤30.00 02/11/2026
WATER-METER ¤874.47 02/11/2026
WATER- TURN ON ¤50.00 02/11/2026
ADMINISTRATIVE RESIDENTIAL ¤30.00 02/11/2026
INSPECTION - RESIDENTIAL ¤891.00 02/11/2026
PLAN REVIEW - RESIDENTIAL ¤252.72 02/11/2026
Fees Total Due: ¤0.00 Total Paid: ¤26,559.33