I want to search for...

Permit #2026010984

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7063-00230-0160
Block: 00230
Subdivision: 2174 - SECTION 63-ZEBULAHS TRAIL
Job Phone: 386-931-9006
Location Address: 13 ZIEGLER PL
Type: DR - DRIVEWAY
Issue Date: 02/18/2026
NOC: Unknown
Applicant name: JOSE CARLOS AZEVEDO
Owner: EDGINGTON ROY & IRIS E H&W

Address

13 ZIEGLER PLACE

PALM COAST, FL 32164

Lot: 0160
Contracted Stated Job Value: ¤2,200.00
Job Description: R+R Portion of Concrete Driveway
Type: CN

Contractor

S & D CONSTRUCTION AND MAINTENANCE
Status Location Address Phone
ACTIVE

37 PRICE LANE

PALM COAST, FL 32164

386-931-9006

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 03/09/2026 APPROVED FSLADISH
Note: 3/7/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ________________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 2/19/26 YOUR REBAR IS TOO THIN IN DIAMETER. #4 REBAR WITH A MINIMUM 1/2 IN DIAMETER IS REQUIRED. ***INSPECTORS NOTE. AT LEAST 24 INCHES OF #4 REBAR IS PLACED UNDER EACH END OF THE PIPE. PIPE SHOULD BE DUG OUT 6 INCHES DEEP BY 6 INCHES LONG UNDER EACH END OF THE PIPE. DRAWING #300.E RESIDENTIAL CULVERT DETAIL*** I WILL APPROVE THIS AS NOTED THATYOU WILL NEED TO USE THE CORRECT DIAMETER REBAR. I WILL INSPECT ON THE AFTER POR FOR CORRECT DIAMETER, MAKE SURE TO MAKE CORRECTION BEFORE POURING CONCRETE. PIPE INVERT IS GOOD AT THIS INSPECTION. BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE AT THE TIME OF THE INSPECTION READY TO POUR,IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER. ALSO VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR.
ROW - FINAL INSPECTION 03/09/2026 APPROVED FSLADISH
Note: 3/7/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9270 2/19/26 YOUR REBAR IS TOO THIN IN DIAMETER. #4 REBAR WITH A MINIMUM 1/2 IN DIAMETER IS REQUIRED. ***INSPECTORS NOTE. AT LEAST 24 INCHES OF #4 REBAR IS PLACED UNDER EACH END OF THE PIPE. PIPE SHOULD BE DUG OUT 6 INCHES DEEP BY 6 INCHES LONG UNDER EACH END OF THE PIPE. DRAWING #300.E RESIDENTIAL CULVERT DETAIL*** I WILL APPROVE THIS AS NOTED THATYOU WILL NEED TO USE THE CORRECT DIAMETER REBAR. I WILL INSPECT ON THE AFTER POR FOR CORRECT DIAMETER, MAKE SURE TO MAKE CORRECTION BEFORE POURING CONCRETE. PIPE INVERT IS GOOD AT THIS INSPECTION. BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE AT THE TIME OF THE INSPECTION READY TO POUR,IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER. ALSO VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR.
U -UTILITY RESIDENTIAL FINAL 03/09/2026 FINAL APPROVED BWRIGHT
ROW- PRE-APRON (PRE-POUR) 02/19/2026 APPROVED - AS NOTED FSLADISH
Note: 2/19/26 YOUR REBAR IS TOO THIN IN DIAMETER. #4 REBAR WITH A MINIMUM 1/2 IN DIAMETER IS REQUIRED. ***INSPECTORS NOTE. AT LEAST 24 INCHES OF #4 REBAR IS PLACED UNDER EACH END OF THE PIPE. PIPE SHOULD BE DUG OUT 6 INCHES DEEP BY 6 INCHES LONG UNDER EACH END OF THE PIPE. DRAWING #300.E RESIDENTIAL CULVERT DETAIL*** I WILL APPROVE THIS AS NOTED THATYOU WILL NEED TO USE THE CORRECT DIAMETER REBAR. I WILL INSPECT ON THE AFTER POR FOR CORRECT DIAMETER, MAKE SURE TO MAKE CORRECTION BEFORE POURING CONCRETE. PIPE INVERT IS GOOD AT THIS INSPECTION. BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE AT THE TIME OF THE INSPECTION READY TO POUR,IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER. ALSO VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR.

Review History

Department Status Date In Date Out
SWALE COMPLETE 01/30/2026 02/03/2026
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/29/2026 02/04/2026
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
RSI COMPLETE 01/29/2026 02/02/2026
Note: Released By: FRANK SLADISH - (386)871-6113 - FSLADISH@PALMCOASTGOV.COM
UTL COMPLETE 01/29/2026 01/29/2026
Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM
ZON COMPLETE 01/29/2026 01/29/2026
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMINISTRATIVE RESIDENTIAL ¤30.00 02/18/2026
RSI DRIVEWAY AFTER POUR ¤16.25 02/18/2026
RSE DRIVE PRE POUR INSPECTION ¤32.50 02/18/2026
RSI ROW FINAL INSPECTION ¤16.25 02/18/2026
RSI SITE PLAN REVIEW ¤16.25 02/18/2026
SW ENG RES REVIEW 240 ¤240.00 02/18/2026
SITE PLAN 15 ¤15.00 02/18/2026
Fees Total Due: ¤0.00 Total Paid: ¤366.25