I want to search for...

Permit #2026011032

Permit Details

Status: FINAL

Parcel Id: 23-11-30-6061-00000-1290
Subdivision: 2332 - WHITEVIEW VILLAGE SUBDIVISION PHASE 2
Job Phone: 386-931-9006
Location Address: 117 WAVERLY LN
Type: DR - DRIVEWAY
Issue Date: 03/05/2026
NOC: Unknown
Applicant name: JOSE CARLOS AZEVEDO
Owner: KIRKPATRICK, JEANINE & DONALD

Address

117 WAVERLY LN

PALM COAST, FL 32164

Lot: 129
Contracted Stated Job Value: ¤2,100.00
Job Description: Paver Driveway Extension
Type: CN

Contractor

S & D CONSTRUCTION AND MAINTENANCE
Status Location Address Phone
ACTIVE

37 PRICE LANE

PALM COAST, FL 32164

386-931-9006

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 03/19/2026 APPROVED TPOLACEK
Note: PAVERS ARE SET AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - FINAL INSPECTION 03/19/2026 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
U -UTILITY RESIDENTIAL FINAL 03/19/2026 FINAL APPROVED BWRIGHT
ROW- PRE-APRON (PRE-POUR) 03/13/2026 APPROVED TPOLACEK
Note: APPROVED TO LAY PAVERS AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9271 3/7/26 AT THE TIME OF THIS INSPECTION YOU ARE APPROVED TO POUR YOUR DRIVEWAY AND APRON PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS 3/6/2026 - PREVIOUS INSPECTION NOTES 03-06-26 TPOLACEK**** AREA FROM EDGE OF CURB TO SIDE WALK MUST BE A MINIMUM OF 8" 5" OF CONCRETE, PAVER BASE AND 2 3/8 PAVERS, FOOTERS/ PAVER RESTRAINTS MUST BE A MINIMUM OF 8" DEEP BY 4" WIDE FOR 5" OF CONCRETE THIN SET AND PAVERS. AT THIS TIME THEY DO NOT MEET COPC MINIMUM REQUIRMENTS. ANY QUESTIONS PLEASE CALL TOM 386-346-8986 I WILL CANCEL THIS INSPECTION DUE TO INSPECTOR WOULD NORMALLY SCHEDULE THIS WHEN APPROVING PRE POUR
ROW- PRE-APRON (PRE-POUR) 03/09/2026 PARTIALLY APPROVED FSLADISH
Note: 3/7/26 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS 3/6/2026 - PREVIOUS INSPECTION NOTES 03-06-26 TPOLACEK**** AREA FROM EDGE OF CURB TO SIDE WALK MUST BE A MINIMUM OF 8" 5" OF CONCRETE, PAVER BASE AND 2 3/8 PAVERS, FOOTERS/ PAVER RESTRAINTS MUST BE A MINIMUM OF 8" DEEP BY 4" WIDE FOR 5" OF CONCRETE THIN SET AND PAVERS. AT THIS TIME THEY DO NOT MEET COPC MINIMUM REQUIRMENTS. ANY QUESTIONS PLEASE CALL TOM 386-346-8986
ROW- PAVER RESTRAINTS 03/09/2026 APPROVED - AS NOTED FSLADISH
Note: 3/7/26 AT THE TIME OF THIS INSPECTION YOU ARE APPROVED TO POUR YOUR DRIVEWAY AND APRON PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS 3/6/2026 - PREVIOUS INSPECTION NOTES 03-06-26 TPOLACEK**** AREA FROM EDGE OF CURB TO SIDE WALK MUST BE A MINIMUM OF 8" 5" OF CONCRETE, PAVER BASE AND 2 3/8 PAVERS, FOOTERS/ PAVER RESTRAINTS MUST BE A MINIMUM OF 8" DEEP BY 4" WIDE FOR 5" OF CONCRETE THIN SET AND PAVERS. AT THIS TIME THEY DO NOT MEET COPC MINIMUM REQUIRMENTS. ANY QUESTIONS PLEASE CALL TOM 386-346-8986 I WILL CANCEL THIS INSPECTION DUE TO INSPECTOR WOULD NORMALLY SCHEDULE THIS WHEN APPROVING PRE POUR
ROW- PRE-APRON (PRE-POUR) 03/06/2026 Disapproved - NO FEE TPOLACEK
Note: 03-06-26 TPOLACEK**** AREA FROM EDGE OF CURB TO SIDE WALK MUST BE A MINIMUM OF 8" 5" OF CONCRETE, PAVER BASE AND 2 3/8 PAVERS, FOOTERS/ PAVER RESTRAINTS MUST BE A MINIMUM OF 8" DEEP BY 4" WIDE FOR 5" OF CONCRETE THIN SET AND PAVERS. AT THIS TIME THEY DO NOT MEET COPC MINIMUM REQUIRMENTS. ANY QUESTIONS PLEASE CALL TOM 386-346-8986
ROW- PAVER RESTRAINTS 03/06/2026 CANCELLED BY APPLICANT TPOLACEK
Note: 03-06-26 TPOLACEK**** AREA FROM EDGE OF CURB TO SIDE WALK MUST BE A MINIMUM OF 8" 5" OF CONCRETE, PAVER BASE AND 2 3/8 PAVERS, FOOTERS/ PAVER RESTRAINTS MUST BE A MINIMUM OF 8" DEEP BY 4" WIDE FOR 5" OF CONCRETE THIN SET AND PAVERS. AT THIS TIME THEY DO NOT MEET COPC MINIMUM REQUIRMENTS. ANY QUESTIONS PLEASE CALL TOM 386-346-8986 I WILL CANCEL THIS INSPECTION DUE TO INSPECTOR WOULD NORMALLY SCHEDULE THIS WHEN APPROVING PRE POUR

Review History

Department Status Date In Date Out
ZON COMPLETE 02/11/2026 02/12/2026
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM NO ROW AGREEMENT REQUIRED IN WHITEVIEW VILLAGE.
ENGIN1 COMPLETE 01/30/2026 02/02/2026
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
RSI COMPLETE 01/30/2026 02/05/2026
Note: Released By: FRANK SLADISH - (386)871-6113 - FSLADISH@PALMCOASTGOV.COM
UTL COMPLETE 01/30/2026 02/06/2026
Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM
ZON HOLD 01/30/2026 01/30/2026
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM the right of way agreement paper work needs to be for a trust as the home is in a trust please use the correct agreements. emailing new trust forms please use the new forms not the old ones. Please have the owners on the deed sign and notarize a Right of way agreement exactly as the deed reads. Please use the new form I emailed to you directly as it was recently updated. There are three pages to this document. Once completed please submit through the portal first for review, once approved I will request the originals be brought to our office for processing.
URB COMPLETE 01/30/2026 02/06/2026
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/05/2026
RSI DRIVEWAY AFTER POUR ¤16.25 03/05/2026
RSE DRIVE PRE POUR INSPECTION ¤32.50 03/05/2026
RSI ROW FINAL INSPECTION ¤16.25 03/05/2026
RSI SITE PLAN REVIEW ¤16.25 03/05/2026
SITE PLAN 15 ¤15.00 03/05/2026
Fees Total Due: ¤0.00 Total Paid: ¤126.25